Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed May 24, 2017 08:12:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed May 24, 2017 08:12:39 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1073855-0
Details Edit
Large Station Board;
Entry# 1976519-0

SBG/Sahibganj (3 PFs)
ساحیبگنج     साहिबगंज

Track: Construction - Double-Line Electrification

06436-222061, NH80, Sahibganj
State: Jharkhand

Elevation: 40 m above sea level
Zone: ER/Eastern   Division: Malda Town
No Recent News for SBG/Sahibganj
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 38
Number of Originating Trains: 9
Number of Terminating Trains: 9
Rating: 3.5/5 (57 votes)
cleanliness - good (8)
porters/escalators - average (6)
food - good (7)
transportation - good (7)
lodging - average (7)
railfanning - good (6)
sightseeing - good (8)
safety - good (8)

Nearby Stations

SLJ/Sakrigali 8 km     SGK/Sakrigali Ghat 9 km     KRMA/Karamtola 9 km     MJP/Maharajpur 14 km     MZC/Mirza Cheuki 15 km     AMPL/Ammapali 19 km     KPTO/Karanpur Ato 21 km     PPT/Pirpainti 24 km     TLJ/Taljhari 28 km     LKB/Lakshmipur Bhorang 30 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 10 of 67 blog entries  next>>
  
Rail Anecdote/Joke
0 Followers
537 views
Yesterday (09:42)   MGR/Munger (2 PFs)

Himanshu~   164 blog posts   90 correct pred (77% accurate)
Entry# 2288923            Tags   Past Edits
JOKE RELATED TO MUNGER BRIDGE .Y line complete hone ke baad ispe jo pehli train chalegi Vo hogi . Sonpur-malda town samjhauta express

5 posts - Yesterday

  
411 views
Yesterday (11:07)
यन्त्रविन्यासYantravinyas   19739 blog posts   427 correct pred (89% accurate)
Re# 2288923-6            Tags   Past Edits
Change category to Jokes

  
412 views
Yesterday (11:08)
Himanshu~   164 blog posts   90 correct pred (77% accurate)
Re# 2288923-7            Tags   Past Edits
BHAI MUNGER BRIDGE ECR KE ANDAR HAI . ECR APNA KAAM COMPLETE KAR CHUKA HAI . ER WAALE ISKO IMPORTANCE NAHIN DE RAHE . KABHI Y LEG KA BAHANA TO KABHI JMP ME NO OF PLATFORM KAM HONE KA BAHANA .

  
401 views
Yesterday (11:14)
Rahul K😎🚂~   2199 blog posts   2042 correct pred (77% accurate)
Re# 2288923-8            Tags   Past Edits
Wahi to strange aur sochne ki baat hai..
Bridge pe train movement start hua to sabse jyada faayda ER ke MGR, JMP, BGP ko hoga.. But still they're not taking any action

  
358 views
Yesterday (11:30)
amishkumar48~   70 blog posts   26 correct pred (69% accurate)
Re# 2288923-9            Tags   Past Edits
Par Jo v CHL rhi ER ki service hi h or proposed me v 2 er ki ek ner. Ecr passenger Chala ke sf chrge krta h😂. Wo v talkal service h pata nhi kb band kr de...

  
183 views
Yesterday (22:29)
Himanshu~   164 blog posts   90 correct pred (77% accurate)
Re# 2288923-10            Tags   Past Edits
Pata nahin asal me kis jone Ki problem hai
  
★★★  General Travel
0 Followers
5151 views
Apr 27 2017 (03:15)   14055/Brahmaputra Mail (PT) | DBRG/Dibrugarh (4 PFs) | SGUJ/WDG-4D/70647

mksald123   564 blog posts   6 correct pred (58% accurate)
Entry# 2252182            Tags   Past Edits
Brahmaputra mail arrived GHY at 1245 hrs and departed at 1302 hrs by SGUJ WDG 4D 70647 on 26.04.17

6 posts - Thu Apr 27, 2017

1 posts - Fri Apr 28, 2017

  
4118 views
Apr 28 2017 (09:12)
mksald123   564 blog posts   6 correct pred (58% accurate)
Re# 2252182-9            Tags   Past Edits
First time Brahmaputra Mail 14055 enters Platform 1 of Ald just after LHB Purushottam departed.
The credit goes to first ER who is completely following RM remarks, not to delay trains and the completing sahibganj loop is helping in this.
Second ECR who rcvd it right time at Kiul and only delayed it 40 minutes till MGS arrival
The Purushottam and Brahmaputra entered MGS
...
more...
same time but as Purushottam was right time, a superfast and LHBfied so it was left before from MGS.
Third NCR who gave the trains nice priority and the two riders entered the station after a huge long time, without humiliating stops and crawling run from Naini to Ald and at outer.
Great Day.
Everyone likes his her own child more than others.
So what happens is when trains get late, in one of busiest section like naini ald, Purushottam, Mahabodhi, Rewa, Brahmaputra etc all line up at Naini.
As prayagraj is own child of my zone and it starts from ald so it is made stand at PL1 from 2030 hrs, 01 hour before scheduled departure.
platform 2-6 also remain busy by down and other up trains.
So above mentioned trains if reach Naini after 2030 hrs, they generally enters ald at 2130 hrs crawling 1 hour from Naini to outer.

  
4045 views
Apr 28 2017 (18:04)
Baadshaho~   72 blog posts
Re# 2252182-10            Tags   Past Edits
This jamalpur tunnel doubling work project is 6-7 years old project.another tunnel was to be made for doubling process between jamalpur ana ratanpur.now the 2nd jmp tunnel might be ready by end of 2018 according to DRM malda .

  
4016 views
Apr 28 2017 (18:07)
Baadshaho~   72 blog posts
Re# 2252182-11            Tags   Past Edits
That third line is constructed between barh and bakhtiyarpur for coal linkage to Ntpc barh.

  
3664 views
Apr 30 2017 (03:34)
mksald123   564 blog posts   6 correct pred (58% accurate)
Re# 2252182-12            Tags   Past Edits
But as per speed, looking difficult.

  
3716 views
Apr 30 2017 (03:38)
mksald123   564 blog posts   6 correct pred (58% accurate)
Re# 2252182-13            Tags   Past Edits
But old projects are also mentioned in pink book.
All projects started, running and finished is mentioned in pink book, till the time account is closed in book (each rupee is paid or 100% payment done to company/ agency)
  
★  Info Update
0 Followers
8609 views
Mar 25 2017 (07:07)   15620/Kamakhya-Gaya Weekly Express | KYQ/Kamakhya Junction (4 PFs)

4πu¶am*^~   5836 blog posts   42341 correct pred (87% accurate)
Entry# 2209959            Tags   Past Edits
Temporary Augmentation in NFR trains

  
8318 views
Mar 25 2017 (09:47)
बरौनी लखनऊ एक्सप्रेस~   8577 blog posts   119 correct pred (74% accurate)
Re# 2209959-1            Tags   Past Edits
Temporary nahi permanent hona chahiye

  
6178 views
Apr 01 2017 (11:09)
Rahul K😎🚂~   2199 blog posts   2042 correct pred (77% accurate)
Re# 2209959-2            Tags   Past Edits
2 more 3AC Coaches required in 15621/2
  
★★  Rail Fanning
0 Followers
9072 views
Nov 19 2016 (12:40)   53063/Barddhaman - Barharwa Passenger (UnReserved) | BWN/Barddhaman Junction (8 PFs) | BWN/WDM-3A/16402

SBG Loop~   530 blog posts   10 correct pred (50% accurate)
Entry# 2064909            Tags   Past Edits
Journey in SBG loop section from BWN to SBG on BWN-BHW passenger and MLDT-NDLS Express. As a loco fan have snapped some pics of locos in the section. Now e-locos can also be seen in KAN-RPH section. Following are some of the images.
PIC 1 : BWN's WDM-3A 16402 on PF 6 at BWN with 53063 (BWN-BHW pass) along with TATA's WAG-5 23390 with 53061 (BWN-HTE pass) on PF 7.
PIC 2 : On going construction of ROB towards Khana side. Similarity can be seen with Chiraiyatand flyover at Patna.
PIC
...
more...
3 : Changing tracks near BWN
PIC 4 : TKD's WAG-7 27318 with BCNA rack.
PIC 5 : BIA's WAG-7 27818 with BCNA rack.
PIC 6 : HWH WAP-4 22289 with 12352 RJPB-HWH Express
PIC 7 : BWN's WDM-3A 14141 with 12378 Padatik Express
PIC 8 : ASN's WAG-5A 23077 with 13132/PNBE - KOAA Express
PIC 9 : Curving out of mail line on to SBG loop near Khana Jn, while 53044 Rajgir - Howrah Fast Passenger awaits at Call in Signal.
PIC 10: Curving out of mail line on to SBG loop near Khana Jn.
PIC 11: UDL's WDG-4 12888 with BOXN rake at Jhapater Dhal
PIC 12: HWH WAP-4 22412 with 53048/Viswabharati Fast Passenger
PIC 13: Morning mist in Gangetic plains.
PIC 14: TATA's WAG-5 23550 with 53070 RPH-BWN Passenger
PIC 15: Passengers in SLR of 53070 RPH-BWN Passenger
PIC 16: UDL's WDG-3A 13001 with BOXN rake
PIC 17: HWH's WDM-3D 11498 with 13012 MLDT - HWH ICE
PIC 18: 73012 Rampurhat - Barddhaman DEMU
PIC 19: Jhal Moodi a must have in the section.
PIC 20: A special arrangement for OHE cables under low hight ROB at Santhia.
PIC 21: A special arrangement for OHE cables under low hight ROB at Santhia.
PIC 22: Under construction bridge for third line on Mayurakshi river at Santhia
PIC 23: UDL's WDG-3A 13189 with flat beds
PIC 24: UDL's WDG-3A 13189 with BCNA rack
PIC 25: Progress of Under construction and electrification of third line between RPH and SNT.
PIC 26: Progress of Under construction and electrification of third line between RPH and SNT.
PIC 27: Progress of Under construction and electrification of third line between RPH and SNT.
PIC 28: JMP's WDG-4 12982 with BOXN rake
PIC 29: HWH's Wappie at RPH
PIC 30: Abandoned East Cabin RPH.
PIC 31: Surprised as PUNE's WDG-4 122445 lying idle at RPH
PIC 32: HWH's WDM-3A 16331R with 13028 Kaviguru Express
PIC 33: BWN's WDM-3A 16638R with 53074 SBG-RPH Passenger
PIC 34: BWN's WDM-3A 18819R with 13162 Tebhaga Express
PIC 35: Away from home KTE's WDG-4 12818 with BOXN rake
PIC 36: SGUJ WDG-4 12489 with BTPN rake.
PIC 37: BWN's WDM-3A 16461R with 53042Jaynagar - Howrah (Dhuliyan) Passenger
PIC 38: Sick line shed at Pakur
PIC 39: Goods yard at Pakur now a den of D-locos
PIC 40: SGUJ WDG-4 12154 with BOXN rake
PIC 41: Fresh modified TKD's WDM-3A 14015R with 14004 MLDT-NDLS Express.
PIC 42: Green Rajmahal hills over looking SBG loop section.
PIC 43: And the Ganga Mata at Maharajpur
PIC 44: Abandoned cabin at Sakigali now ex-Junction

  
8743 views
Nov 19 2016 (16:22)
IR no more Safe^~   21664 blog posts   97596 correct pred (75% accurate)
Re# 2064909-1            Tags   Past Edits
Jhal Muri is must. :D
& now slowly add the Loco pics.

  
8635 views
Nov 19 2016 (18:35)
SBG Loop~   530 blog posts   10 correct pred (50% accurate)
Re# 2064909-2            Tags   Past Edits
Yes, there were hardy any passengers who did not have the crunching moment :P
I have added all loco pics but only 12 got updated. I do not know the reason.

  
8548 views
Nov 19 2016 (21:53)
Guest: 7e4b6a96   show all posts
Re# 2064909-3            Tags   Past Edits
nice pics !!

  
8554 views
Nov 20 2016 (00:40)
AP™^~   1487 blog posts   373 correct pred (93% accurate)
Re# 2064909-4            Tags   Past Edits
Liked all of them, but just loved the Pic No 19. :)
Aha, I just miss them here in Bangalore.
  
Social
0 Followers
1156 views
Feb 05 2017 (11:43)   SBG/Sahibganj (3 PFs)

12312 Kalka Mail   171 blog posts   4 correct pred (44% accurate)
Entry# 2152217            Tags   Past Edits
New DEMU maintenance shed.
  
Rail Fanning
0 Followers
2320 views
Jan 30 2017 (17:59)   13414/Farakka Express (via Sultanpur) | SBG/Sahibganj (3 PFs)

MirzaRa1~   543 blog posts   463 correct pred (76% accurate)
Entry# 2145950            Tags   Past Edits
Late arrival of 13414 farakka exp @sbg
  
General Travel
0 Followers
7283 views
Oct 22 2016 (13:48)   BGP/Bhagalpur Junction (6 PFs)
 

SBG Loop~   530 blog posts   10 correct pred (50% accurate)
Entry# 2032503            Tags   Past Edits
Another tender wrt electrification of BHW-SBG-JMP-KIUL section. Hopefully, everything ends as per schedule.
  
Poll
0 Followers
6297 views
30 votes
Nov 13 2016 (12:46)   22323/Shabd Bhedi SF Express | GAYA/Gaya Junction (9 PFs)

Sealdah Jammu HumSafar should get JRC Stoppage*^~   8947 blog posts   1 correct pred (33% accurate)
Entry# 2058326            Tags   Past Edits
Which Route do you prefer for the running of Kolkata - Ghazipur Shabd Bhedi Express ?
Dhanbad - Gaya - Varanasi - Aunrihar83%25
Madhupur - Patna - Varanasi - Aunrihar3%1
Bolpur - SBJ Loop3%1
Add your choice10%3

3 posts - Sun Nov 13, 2016

5 posts - Mon Nov 14, 2016

  
4594 views
Nov 14 2016 (12:38)
12952 नई दिल्ली मुंबई राजधानी Left IRI~   6507 blog posts   343 correct pred (78% accurate)
Re# 2058326-9            Tags   Past Edits
Lamba route to IR ne kiya h ise via BSB dekar. Shortest to via CPR padta . Isliye mene majak me wo route likha.

  
4538 views
Nov 14 2016 (12:39)
12952 नई दिल्ली मुंबई राजधानी Left IRI~   6507 blog posts   343 correct pred (78% accurate)
Re# 2058326-10            Tags   Past Edits
Usse GCT wale khush ho jaege ki unko adi ki train mil jaegi.

  
4541 views
Nov 14 2016 (12:52)
12165 Ratnagiri Superfast Express~   2145 blog posts   13 correct pred (56% accurate)
Re# 2058326-11            Tags   Past Edits
bahot lamba route banaya mumbai adi nagpur or bhi bhot jagah ki ek sath train mil jayegi

  
4689 views
Nov 14 2016 (19:26)
12238 Begampura Express~   913 blog posts   32 correct pred (74% accurate)
Re# 2058326-13            Tags   Past Edits
That was sarcastic comment sir.

  
4065 views
Nov 17 2016 (17:39)
Stepping ahead   332 blog posts   1 correct pred (33% accurate)
Re# 2058326-14            Tags   Past Edits
Patna jhajha route the danapur division will make it passenger
  
Social
0 Followers
9072 views
Oct 25 2016 (08:39)   12367/Vikramshila Express | BGP/Bhagalpur Junction (6 PFs)
 

SBG Loop~   530 blog posts   10 correct pred (50% accurate)
Entry# 2035458            Tags   Past Edits
ER's GM visit to BGP station.

  
8736 views
Oct 25 2016 (09:22)
return of the legend 12367 Vikramshila Superfast   30 blog posts
Re# 2035458-1            Tags   Past Edits
I am happy becoz this time GM behaved and responded realistically. He didn't bragged about things and didn't made unreasonable and fake announcement. At least people get to know the real situation regarding issues and they don't get excited only to get ditched later on when demands are not met.
Thank you Sir

  
8363 views
Oct 26 2016 (02:06)
Jeetendra Kumar   147 blog posts
Re# 2035458-2            Tags   Past Edits
He assured nothing and committed nothing.It is a very bad work culture. We need all project done within time frame. If senior officer will not reply related to timing it's a joke in the system.
We have right to ask question. Govt is not give him salary to create never ending process.
  
General Travel
0 Followers
1876 views
Oct 23 2016 (12:20)   SBG/Sahibganj (3 PFs)
 

Aditya*^~   4346 blog posts   2413 correct pred (70% accurate)
Entry# 2033363            Tags   Past Edits
Many times rail cum road bridge is constructed by Indian railway due to pressure of state government.
Now jharkhand govt & NHAI is collaborating for 4 lane road bridge over Ganga connecting Sahibganj & manihari (Katihar).
Now IR should demand that alongwith road bridge, rail bridge should be constructed so that sahibganj & manihari (katihar) gets rail connection also.
click here
Page#    Showing 1 to 10 of 67 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site