Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jun 29, 2017 11:20:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jun 29, 2017 11:20:51 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Details Edit
Large Station Board;
Entry# 1461248-0
Details Edit
Large Station Board;
Entry# 1946586-0
Details Edit
Large Station Board;
Entry# 2145623-0

SCC/Sitapur Cantt. (2 PFs)
سیتاپور کینٹ.     सीतापुर छावनी

Track: Construction - Electric-Line Doubling

Sitapur National Highway 24, Avas Vikas Colony, Sitapur
State: Uttar Pradesh

Elevation: 142 m above sea level
Zone: NER/North Eastern   Division: Lucknow NER
No Recent News for SCC/Sitapur Cantt.
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 2
Number of Halting Trains: 33
Number of Originating Trains: 5
Number of Terminating Trains: 5
Rating: 3.7/5 (23 votes)
cleanliness - good (3)
porters/escalators - good (3)
food - good (3)
transportation - good (3)
lodging - average (3)
railfanning - excellent (2)
sightseeing - good (3)
safety - good (3)

Nearby Stations

STRK/Sitapur Cutchery 1 km     SPC/Sitapur City Junction 4 km     KB/Khairabad Awadh 6 km     BUGN/Bhurjiha Baragn 9 km     TKUR/Tappa Khajuria Halt 10 km     KATA/Katili 12 km     JKP/Jharekapur 14 km     BJLP/Barai Jalalpur 16 km     PSN/Parsendi 16 km     HMP/Hempur 16 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Station Forum

Page#    Showing 1 to 5 of 70 blog entries  next>>
  
★  Info Update
0 Followers
249 views
Jun 27 2017 (15:04)   STP/Sitapur (3 PFs)

shuk RAILWAY is my first crush~   621 blog posts   321 correct pred (56% accurate)
Entry# 2334402            Tags   Past Edits
On 25-Jun-2017 visited Sitapur junction (STP) and tried to detail the ASH-STP GC status report :
Track : 84 out of 86 km track laying has been completed however rest 2km pending track is from Lucknow area. Rail welding almost completed. Clipping is ongoing. Stone filling and finishing of track yet to start. At Sitapur railway station around 200 meters of track yet to get laid due to SCC-BUW single electric line which is operational. As on date no date been announced for taking mega block for laying 200 meters tracker (diamond crossing).
Signal
...
more...
: Cabling for signals has been almost completed for entire stretch however only couple of signals can be seen as on date. Couple of old MG signals still can be seen which either will be uprooted or may be updated.
Bridge : Construction or modification for all the major and minor bridges either been completed or almost completed. Gomti bridge which come in between Daliganj (DAL) and Lucknow city (LC) railway station is still under modification and expected to be completed by September 2017.
Buildings : Only 30 - 70% work has been completed for many railway stations which means many of the stations building might not be fully ready while CRS inspection or inauguration.
Overall status :
Aug;2017 - Track will be ready & light loco can run
Sep;2017 - Signal will be ready
Oct;2017 - Station basic infrastructure would be ready
Nov;2017 - CRS inspection can be requested
Dec;2017 - Section commencement can be expected
All above dates are tentative
  
★★★  Pic Upload
0 Followers
3367 views
Mar 14 2017 (01:19)   SCC/Sitapur Cantt. (2 PFs)

ak714525   6 blog posts
Entry# 2196664            Tags   Past Edits
Diamond crossing BG&MG
Pic clicked by Ayush Kumar Prajapati

2 posts - Tue Mar 14, 2017

  
2096 views
Mar 21 2017 (11:31)
रांची जयनगर एक्सप्रेस चालू करने उपाय बताइये~   8876 blog posts   119 correct pred (67% accurate)
Re# 2196664-3            Tags   Past Edits
Mavli me bhi aisa hai

  
1762 views
Mar 21 2017 (11:37)
AkashNER~   607 blog posts   69 correct pred (64% accurate)
Re# 2196664-4            Tags   Past Edits
According to railway terminology, Diamond crossing includes formation of 2 acute & 2 obtuse angles whereas in Nagpur it's more properly a Square crossing.

  
Mar 21 2017 (12:01)
Tabbys star and the Alien outpost~   2566 blog posts
Re# 2196664-5            Tags   Past Edits
Though it comes quite close to being square, the Nagpur crossing too is technically a diamond crossing ( the rails are not exactly at 90 degrees to each other). In addition, it is what is known as a one-way diamond crossing. The main line towards Gondia, does not have any gap in the rails, as is normally expected at diamond crossings. The freight yard line, run slightly elevated over the main line with a gap in it's rails. This allows the main line traffic to move at faster speeds over the crossing.

  
660 views
May 27 2017 (19:58)
Raja lare Raja se Praja jaye jaan se~   1514 blog posts   1 correct pred (100% accurate)
Re# 2196664-6            Tags   Past Edits
will be history

  
199 views
Jun 23 2017 (09:40)
ak714525   6 blog posts
Re# 2196664-7            Tags   Past Edits
Thanks
  
General Travel
0 Followers
587 views
Jun 15 2017 (15:09)   SCC/Sitapur Cantt. (2 PFs)

shuk RAILWAY is my first crush~   621 blog posts   321 correct pred (56% accurate)
Entry# 2321579            Tags   Past Edits
जुलाई 2017 के बाद लखनऊ-सीतापुर के बीच ट्रायल कराने की योजना
click here
लखीमपुर-खीरी हिन्दुस्तान संवादलखनऊ-मैलानी रेल प्रखंड पर जुलाई से बड़ी रेल लाइन का ट्रायल होना है। अभी 20 प्रतिशत काम बाकी है। लखनऊ-मैलानी के बीच आमान परिवर्तन के चल रहे काम में काफी तेजी आ गई है। कार्यदाई संस्था जुलाई के बाद सीतापुर मैलानी के बीच ट्रायल कराने की योजना तैयार कर रही है। वहीं लखनऊ-सीतापुर के बीच मानसून से पहले मेमू को चलाने की योजना बनाई गई है। ब्राडगेज के चल रहे काम में काफी तेजी आ गई है। आमान
...
more...
परिवर्तन का काम रही आरवीएनएल कार्यदाई संस्था ने सीतापुर-मैलानी के बीच मेन क्रासिंगों पर लाइन डालने का लगभग काम पूरा कर लिया है। महज चार जगहों पर लाइन डालने का काम बचा है। इनका भी काम जल्द पूरा कर लिया जाएगा।इसके साथ ही लखीमपुर रेलवे स्टेशन पर एक नंबर और दो नंबर प्लेटफार्म को बनाने के लिए लाइन डालने का काम किया जा रहा है। इसके लिए मिट्टी का पटान हो गया है। साथ ही स्टेशन की टीनसेट को उतार दिया गया है। साथ ही पुराने टिकट ¨वडो पर ही नई ग्रिल लगा दी गई है। ब्राडगेज की ट्रेनों के लिए यही से टिकट मिलेंगे। लखीमपुर में ब्राडगेज का काम देख रहे कार्यदाई संस्था के प्रोजेक्ट मैनजर आरिफ ने बताया कि आरवीएनएल जुलाई के बाद कभी भी सीतापुर-मैलानी के बीच ट्रायल लेने की योजना तैयार कर रहा है। वहीं लखनऊ-सीतापुर के बीच मानसून से पहले मेमो ट्रेनों को संचालित करने की तैयारी कर रहा है।
-
Thanks to Ehtram Husain/206964
  
Pic Upload
0 Followers
2096 views
Mar 15 2017 (12:47)   SCC/Sitapur Cantt. (2 PFs)

ak714525   6 blog posts
Entry# 2198391            Tags   Past Edits
Sitapur (MG) railway station's platform 2&3
Clicked by Ayush Prajapati

  
1861 views
Mar 15 2017 (21:51)
shuk RAILWAY is my first crush~   621 blog posts   321 correct pred (56% accurate)
Re# 2198391-1            Tags   Past Edits
WRONg INFO
Its STP/Sitapur junction's pic not SCC/Sitapur cantt.

  
1394 views
Mar 27 2017 (01:13)
alvida sitapur mg   4 blog posts
Re# 2198391-2            Tags   Past Edits
Wrong
It neither SCC nor sitapur city.
It is sitapur Mg.

  
443 views
May 27 2017 (19:58)
Raja lare Raja se Praja jaye jaan se~   1514 blog posts   1 correct pred (100% accurate)
Re# 2198391-3            Tags   Past Edits
STP will be another Jn.
  
Info Update
0 Followers
1423 views
May 26 2017 (11:21)   STP/Sitapur (3 PFs)

shuk RAILWAY is my first crush~   621 blog posts   321 correct pred (56% accurate)
Entry# 2293562            Tags   Past Edits
RVNL, which is responsible for Aishbagh (ASH) - Sitapur (STP) sections gauge conversion, misses another deadline to complete GC of ASH-STP section. Now new deadline is Oct;2017 or Nov;2017 and this means (just assumption) CRS might be requested in month of Nov;2017 or Dec;2017 so on and average one can expect first broad gauge train in month of Jan;2018.
-
Special thanks to "☆गोंडा इलेक्ट्रिक शेङ ■☆*^~" for providing news link to forum.
News
...
more...
Entry# 303584 Blog Entry# 2293227
Source : click here
Page#    Showing 1 to 5 of 70 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.