Disclaimer   
Gallery Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jan 19, 2017 05:49:50 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jan 19, 2017 05:49:50 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Entry# 1430457-0
Entry# 1625821-0
Entry# 1687822-0
Entry# 2012301-0

PTA/Patiala (4 PFs)
ਪਟਿਆਲਾ     पटियाला

Track: Construction - Doubling+Electrification

Opposite PRTC State bus terminal , Patiala. Tel: 0175-2309178
State: Punjab

Elevation: 256 m above sea level
Zone: NR/Northern   Division: Ambala
No Recent News for PTA/Patiala
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 4
Number of Halting Trains: 22
Number of Originating Trains: 1
Number of Terminating Trains: 1
Rating: 4.1/5 (81 votes)
cleanliness - excellent (12)
porters/escalators - good (11)
food - good (10)
transportation - good (11)
lodging - good (9)
railfanning - good (10)
sightseeing - excellent (9)
safety - good (9)

Nearby Stations

DMWP/DMW Halt Patiala 3 km     PTE/Patiala Cantt. 4 km     DOC/Daun Kalan 9 km     DBN/Dhablan 12 km     KLI/Kauli 14 km     KLMJ/Kalhe Majra 18 km     RPJ/Rajpura Junction 25 km     NBA/Nabha 25 km     KKRL/Kakrala 31 km     SBJ/Sarai Banjara 34 km    
Departures    Arrivals    Station Map    Forum    News    Gallery    Timeline    RailFan Club    Station Pics    

Picture & Video Gallery

Page#    Showing 1 to 50 of 625 Pic/Video Blogs  next>>

PTA/Ptl
Status ss of 30/11/2016
×

PTA/Ptl
As in Press Information Bureau
×

11058/Amrtsr Mmb PTA/Ptl
11058 ASR CSTM Exp full departure show from Patiala!
Date...
×

PTA/Ptl
A TKD WAG9 reached Patiala
×

PTA/Ptl
Sh.S.K.Luthra CAO/R flagging off 1st Rebuilt WDP1 Loco by DMW ...
×

11058/Amrtsr Mmb PTA/Ptl
Taken from inside of A1, while departing..
Date...
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Resting towards ramp siding at Patiala , waiting for entry into...
×

PTA/Ptl
Now a routine crossings here. the containers cross regularly through PTA....
×

PTA/Ptl
An AC fitted, twin CAB, Gonda hunk with BOXN coal coming...
×

PTA/Ptl
Twin PTRU WDG4 9000hp ,with BCNA on toe, waiting for starter...
×

PTA/Ptl
Clearing some doubts of people who think Rajpura-Patiala-Dhuri-Bathinda is not an...
×

PTA/Ptl
Today , cabinet committee approved the final leg for Rajpura-Patiala-Bathinda rail...
×

11058/Amrtsr Mmb PTA/Ptl
11058 ASR CSTM Exp full departure show from Patiala!
Date...
×

PTA/Ptl
Today
×

PTA/Ptl
Sh.S.K.Luthra CAO/R flagging off 1st Rebuilt WDP1 Loco by DMW ...
×

11058/Amrtsr Mmb PTA/Ptl
Taken from inside of A1, while departing..
Date...
×

PTA/Ptl
Tender
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Resting towards ramp siding at Patiala , waiting for entry into...
×

PTA/Ptl
Now a routine crossings here. the containers cross regularly through PTA....
×

PTA/Ptl
For S&T works.
×

PTA/Ptl
Tender for extension of PF 1 at Patiala is out.
×

PTA/Ptl
Concor have started coming to Patiala
×

PTA/Ptl
Today , cabinet committee approved the final leg for Rajpura-Patiala-Bathinda rail...
×

PTA/Ptl
An Erode and BKSC arrived as MUed at Patiala
×

PTA/Ptl
News
×

PTA/Ptl
Sh.S.K.Luthra CAO/R flagging off 1st Rebuilt WDP1 Loco by DMW ...
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
Space is being cleared along side the track between Patiala Rajpura...
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Resting towards ramp siding at Patiala , waiting for entry into...
×

PTA/Ptl
Tender for work on bridges between Rajpura Patiala Dhablan in c/w...
×

PTA/Ptl
A monsoon soaked PTA station when TSR was being carried out...
×

PTA/Ptl
Station Board
×

PTA/Ptl
Concor have started coming to Patiala
×

PTA/Ptl
Today , cabinet committee approved the final leg for Rajpura-Patiala-Bathinda rail...
×

PTA/Ptl
Photo of event at BTI during foundation stone ceremony of RPJ-BTI...
×

PTA/Ptl
The flyover at Bahadurgarh.
×

PTA/Ptl
I am seeing the same..Screenshot Attached.
Plz...
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
Space is being cleared along side the track between Patiala Rajpura...
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Resting towards ramp siding at Patiala , waiting for entry into...
×

PTA/Ptl
Patiala SB.
×

PTA/Ptl
Another visitor so far away from home, resting on the yard...
×

PTA/Ptl
Station Board
×

PTA/Ptl
Concor have started coming to Patiala
×

PTA/Ptl
Today , cabinet committee approved the final leg for Rajpura-Patiala-Bathinda rail...
×

PTA/Ptl
A TKD WAG9 reached Patiala
×

PTA/Ptl
Forest Clearance for Rajpura Bathinda Doubling.
×

PTA/Ptl
Patiala!!
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
Station Board
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Landed at PTA with damaged face, for to be repaired at...
×

PTA/Ptl
Information
×

PTA/Ptl
Another visitor so far away from home, resting on the yard...
×

PTA/Ptl
CEA Approved RPJ-BTI Doubling... Congratulations to All Rbr Fans.
×

PTA/Ptl
Today , cabinet committee approved the final leg for Rajpura-Patiala-Bathinda rail...
×

PTA/Ptl
A TKD WAG9 reached Patiala
×

PTA/Ptl
Wishing all IRI members a very Happy and Prosperous Diwali !!!
×

PTA/Ptl
Patiala!!
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
BCBFG "Adani Rake" crossing Patiala with Twin SBI hunks
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Station board.
×

PTA/Ptl
DLMW update.
×

PTA/Ptl
Twin PTRU WDG4 9000hp ,with BCNA on toe, waiting for starter...
×

PTA/Ptl
PTA station to go cashless.
×

PTA/Ptl
Today , cabinet committee approved the final leg for Rajpura-Patiala-Bathinda rail...
×

PTA/Ptl
A TKD WAG9 reached Patiala
×

PTA/Ptl
Soil testing going on for bridges work on Patiala Kauli section...
×

PTA/Ptl
Patiala!!
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
BCBFG "Adani Rake" crossing Patiala with Twin SBI hunks
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Its at Dhandari Kalan , near LDH. the containers come...
×

PTA/Ptl
A good news for Patiala.
×

PTA/Ptl
Twin PTRU WDG4 9000hp ,with BCNA on toe, waiting for starter...
×

PTA/Ptl
As posted by RM on his page.
×

PTA/Ptl
Today , cabinet committee approved the final leg for Rajpura-Patiala-Bathinda rail...
×

PTA/Ptl
A TKD WAG9 reached Patiala
×

PTA/Ptl
First WDP1 ( now WDP1M) , Rebuilt at DLMW Patiala, dispatched...
×

PTA/Ptl
Way away from home..!
The...
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
BCBFG "Adani Rake" crossing Patiala with Twin SBI hunks
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Now a routine crossings here. the containers cross regularly through PTA....
×

PTA/Ptl
An AC fitted, twin CAB, Gonda hunk with BOXN coal coming...
×

PTA/Ptl
Twin PTRU WDG4 9000hp ,with BCNA on toe, waiting for starter...
×

PTA/Ptl
In The Tribune today.
×

PTA/Ptl
In the news today
×

PTA/Ptl
A TKD WAG9 reached Patiala
×

PTA/Ptl
Sh.S.K.Luthra CAO/R flagging off 1st Rebuilt WDP1 Loco by DMW ...
×

PTA/Ptl
Now corrected.
In...
×

PTA/Ptl
Electrification work in progress near Kauli.
×

PTA/Ptl
BCBFG "Adani Rake" crossing Patiala with Twin SBI hunks
×

PTA/Ptl
Lot of works are going on at Patiala, TSR of entire...
×

PTA/Ptl
Now a routine crossings here. the containers cross regularly through PTA....
×

PTA/Ptl
An AC fitted, twin CAB, Gonda hunk with BOXN coal coming...
×

PTA/Ptl
Twin PTRU WDG4 9000hp ,with BCNA on toe, waiting for starter...
×
Scroll to Top
Scroll to Bottom


Go to Mobile site