Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Fri Apr 19 04:24:00 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Close-up; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 2418290-0
Scenic; Close-up; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3764515-2


12713/Satavahana SF Express
शातवाहन सुपरफास्ट एक्सप्रेस

WL/Warangal --> SC/Secunderabad Junction

Latest News
(You need to double-check/verify this info yourself)
🔹Train no. 12713/Satavahana SF Express JCO 07/12/2023 and 10/12/2023 to 18/12/2023 will be fully cancelled.
Sun Dec 03, 2023 (12:36PM)
News History
🔹 Train no. 12713/Satavahana SF Express JCO 21/05/2023 to 07/06/2023 will be fully cancelled.
Fri May 19, 2023 (04:39PM)
🔹 JCO 21.03.2023 and 22.03.2023 are fully cancelled.
Mon Mar 20, 2023 (09:06PM)
Permanent Augmentation of 12713 Vijayawada - Secunderabad Express with Additional 1 Chair Car Coach JCO 12.09.2022
Thu Sep 01, 2022 (05:49PM)
📢⚟ JCF 24/08/2021 DL1-DL2 Would Act As UR Coach
Mon Aug 23, 2021 (10:07PM)
0 Follows
Bedroll/Linen: NOT Available change
Inaugural Run
Wed Jul 01, 1992
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
E-Catering is Only Available at BZA, WL, KZJ & SC.
Updated: Mar 14 (09:23) by KarnavatiExpress^~
Dep:
Arr:
RSA - Rake Sharing
NO RSA. Single Dedicated Rake with PM @ BZA.
Rating: 4.8/5 (183 votes)
cleanliness - excellent (31)
punctuality - good (31)
food - excellent (31)
ticket avbl - excellent (31)
u/r coach - excellent (23)
railfanning - excellent (29)
safety - excellent (30)
ICF-CBC Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 GS
  5
 GS
  6
 GS
  7
 GS
  8
 GS
  9
 GS
 10
 D1
 11
 D2
 12
 D3
 13
 PC
 14
 D4
 15
 D5
 16
 D6
 17
 C1
 18
 C2
 19
 GS
 20
 GS
 21
 GS
 22
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    427 blog entries  next>>
General Travel
387343 views
4

Jan 21 (11:26)   17229/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
guest
Entry# 5948250            Tags   Past Edits
can i know what all Trains that are up for LHB in 2024-25 in SCR Division..?
expecting to see some good trains with LHB
Translate to English
Translate to Hindi

More Posts
0
updating ...
4 wishes
Happy Journey ನಿಮ್ಮ ಪ್ರಯಾಣ ಸುಖಕರವಾಗಿರಲಿ शुभ यात्रा Happy Journey
going back to Home....

100 Posts

FmtBlog
7183 views
0

Jan 04 (23:00)
_V_K_^~
_V_K_^~   58344 blog posts
Re# 5931574-101            Tags  
Satavahana SF Express   Vijayawada Jn  
@BZA   50m late
@BZA: Vijayawada Jn &13 km/h #12714: Satavahana SF Express 22511 BZA WAP 4 on pf 4
Translate to English
Translate to Hindi

More Posts
Poll
177675 views
13 votes
0

Dec 29 2023 (20:20)   12933/Karnavati Express
Dr.AtulSinha~   4165 blog posts
Entry# 5926878            Tags   Past Edits
INTERCITY EXPRESS POPULARITY CONTEST - Vote for your favourite named intercity train of Indian Railways.
Translate to English
Translate to Hindi
ENDED
NO vote
12933/34 Karnavati Express
0%
0
12157/58 Hutatma Express
0%
0
12337/38 Shantiniketan Express
0%
0
12279/80 Taj Express
0%
0
12813/14 Steel Express
15%
2
12635/36 Vaigai Express
15%
2
12341/42 Agnibina Express
0%
0
12675/76 Kovai Express
0%
0
12123/24 Deccan Queen
23%
3
12605/06 Pallavan Express
0%
0
12607/08 Lalbagh Express
8%
1
12605/06 Pallavan Express
8%
1
12347/48 Sahid Express
0%
0
12711/12 Pinakini Express
0%
0
12497/98 Shan-e-Punjab Express
8%
1
12639/40 Brindavan Express
0%
0
12713/14 Satavahana Express
0%
0
12717/18 Ratnachal Express
0%
0
12883/84 Rupasi Bangla Express
0%
0
12821/22 Dhauli Express
0%
0
12871/72 22861/62 Ispat Express
0%
0
12725/26 Siddhaganga Express
8%
1
12339/40 Coalfield Express
8%
1
12921/22 Flying Ranee
0%
0
12419/20 Gomti Express
8%
1
22479/80 Sarbat da Bhala Express
0%
0
12747/48 Palanadu Express
0%
0
Any other train (in comments)
0%
0
General Travel
31994 views
0

Dec 14 2023 (10:17)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
NaagendraV
NaagendraV   286 blog posts
Entry# 5910612            Tags  
విశాఖపట్నం కేంద్రంగా దక్షిణ కోస్తా రైల్వే జోన్‌ ఏర్పాటు కొలిక్కి రాకపోవడంతో ఏపీలోని రైల్వేశాఖకు చెందిన వివిధ విభాగాల కార్యాలయాలు సికింద్రాబాద్‌కు తరలిపోతున్నాయి.

విజయవాడ, తిరుపతిలో రైల్వే కన్‌స్ట్రక్షన్‌ అకౌంట్స్‌ కార్యాలయాల మూసివేత

...
more...


ఈనాడు, అమరావతి: విశాఖపట్నం కేంద్రంగా దక్షిణ కోస్తా రైల్వే జోన్‌ ఏర్పాటు కొలిక్కి రాకపోవడంతో ఏపీలోని రైల్వేశాఖకు చెందిన వివిధ విభాగాల కార్యాలయాలు సికింద్రాబాద్‌కు తరలిపోతున్నాయి. దక్షిణ మధ్యరైల్వే ప్రధాన కేంద్రమైన సికింద్రాబాద్‌కు ఒక్కో విభాగాన్ని విలీనం చేస్తూ, ఇక్కడి కార్యాలయాలను మూసివేస్తున్నారు. విజయవాడ, తిరుపతిలో ఉన్న రైల్వే కన్‌స్ట్రక్షన్‌ అకౌంట్స్‌ కార్యాలయాలను మూసివేసి వాటిని ప్రధాన కేంద్రంలో విలీనం చేసేలా ఉన్నతాధికారులు ఆదేశాలిచ్చారు. ఈనెలాఖరుకు ఈ ప్రక్రియ పూర్తికావాలని, జనవరి ఒకటి నుంచి వీటి కార్యకలాపాలు సికింద్రాబాద్‌ నుంచే జరగాలని కొద్దిరోజుల కిందట జారీచేసిన ఆదేశాల్లో పేర్కొంది. విజయవాడ, గుంటూరు, గుంతకల్‌ డివిజన్లలో జరిగే రైల్వే నిర్మాణ పనులు అన్నింటికీ.. కన్‌స్ట్రక్షన్స్‌ అకౌంట్స్‌ విభాగం నుంచి చెల్లింపులు జరిపేందుకు గతంలో విజయవాడ, తిరుపతిలో కార్యాలయాలు ఏర్పాటు చేశారు. నిర్మాణ పనుల బిల్లులను ఈ కార్యాలయాలకు ఆన్‌లైన్‌లో పంపిస్తే, వాటిని పరిశీలించి చెల్లింపులు చేస్తుంటారు. ఇప్పుడు ఈ రెండు కార్యాలయాలు మూసివేయడంపై ఉద్యోగులు విస్తుపోతున్నారు.

source : click here

#SCOR #andhrarailinfra #southcoastrailwayzone #BZA #GNT #GTL

Translate to English
Translate to Hindi
General Travel
53163 views
7

Nov 25 2023 (11:34)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
NaagendraV
NaagendraV   286 blog posts
Entry# 5893062            Tags   Past Edits
1 compliments
Useful
List of new railway line/ routes at various states in SCR 2023-24.
-----------------------------------------------------------------------------------------------------------------------
SCR - Andhra Pradesh*************************

Preliminary Engineering cum Traffic Survey for byepass line connecting Vijayawada-Machilipatnam
section
...
more...
to (Vijayawada--Gudur section for Visakhapatnam traffic bound for Chennai and viceversa and thus avoiding Vijayawada Jn. (49 km)

Reconnaissance Engineering cum Traffic Survey for new line between Darsi and Narsaraopet (65 km)
Reconnaissance Engineering cum Traffic Survey for new line between Narsapur-Machhlipatnam ( 85km )
Reconnaissance Engineering cum Traffic Survey for Dharmavaram-Bellari new line (120 km)
Reconnaissance Engineering cum Traffic Survey for Mantralayam Road-Kurnool new line (110 km)

Final Location Survey for new line between Vijayawada- Guntur via Amaravati (106 km)
Final Location Survey for Doubling of Dharmavaram – Pakala – Katpadi (290 Km)
Final Location Survey for Doubling of Guntur – Bibinagar (248 Km)
RET survey for Muddanuru-Mudigubba new line (65Km)
Final Location Survey for doubling of Gooty-Pendakallu line (29 Km)
Final Location Survey for doubling of Pakala-Tirupatiline (42 Km)
Final Location Survey for proposed tripling bet. OBVP GTL
Final Location Survey for tripling between Renigunta-Gudur
Final location survey for tripling between Samalkot and Nidadavolu (72 Km)
Final Location Survey for 3rd line between BZA-NDD
Final Location Survey for Doubling Nallapadu-Krishna Canal (3rd and 4th Line) (33.62 kms.)
Final Location Survey for 3rd line between Vijayawada and Duvvada (335 km)

-----------------------------------------------------------------------------------------------------------------------------

SCR -Telangana: ************************************
1.Preliminary Engineering cum Traffic Survey for new line betwen Bodhan-Bidar (100 km)
2.Preliminary Engineering cum Traffic survey for third line between Secunderabad-Kazipet (134 km)
3.Preliminary Engineering cum Traffic Survey for doubling of Parbhani to Parli (67 km)
4.Preliminary Engineering cum Traffic Survey for byepass line at Purna (3 km)
5.Preliminary Engineering cum Traffic Survey for doubling of Secunderabad- Mudkhed- Adilabad (420km)
6.Preliminary Engineering cum Traffic Survey for Balharshah-Kazipet 4th line (234 km)
7.Preliminary Engineering cum Traffic Survey for Kazipet- Vizayawada 4th line (219 km) --

8.Reconnaissance Engineering cum Traffic Survey for Siddipet - Akkanapet (50 km)
9.Reconnaissance Engineering cum Traffic Survey for new line between Mancherail - Adilabad via Utrfoor (186 km)
10.Reconnaissance Engineering cum Traffic Survey for new line of Dornakal - Miryalguda (133 km)
11.Reconnaissance Engineering cum Traffic Survey for new line between Ghanpur and Surya via Palakutri, Kodakandla (170 km)
12.Reconnaissance Engineering cum Traffic Survey for new line between Kothagudem and Kirandul (180 km)
13.Reconnaissance Engineering cum Traffic Survey for new line between Bodhan - Biloli- Mudkhed-Jalkot- Latur Road (130 km)
14.Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantiji, Pandharkavadan, Chankha (100 km)
15.Reconnaissance Engineering cum Traffic Survey for new line between Patancheru - Sangareddy - Jogipet - Medak (95 km)
16.Reconnaissance Engineering cum Traffic Survey for new line between Nizamabad-Nirmal-Adilabad (125 km)
17.Reconnaissance Engineering cum Traffic Survey for new line between Manakondur - Huzurabad and Elkaturchi (60 km)
18.Reconnaissance Engineering cum Traffic Survey for new line between Karkheli-Narsi (30 km)
19.Reconnaissance Engineering cum Traffic Survey for new line between Bijapur and Warangal (288 km)
20Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantji- Pandharkavda-Chanakha (100 km)

21.Final Location Survey for new line between Bidar and Nanded (155 km)
22.Final Location Survey for doubling of Moulali-Sanathnagar line (21 Km)
23.Final Location Survey for doublin of Motamari- Vishnupuram line (89 Km)
24.Final Location Survey for Doubling of Dornakal-Manuguru line (104 Km)
25.Final Location Survey for Doubling betwwen Aurangabad and Ankai (98 Km) with bypass at Ankai
26.Final Location Survey for Doubling Secunderabad (SC)-Sanathnagar (S.NoF) 3rd line (19.18 kms.)
27.Final Location Survey for Doubling Secunderabad - Kazipet (85.48 kms.
28.Final Location Survey for Doubling Shankarpalli- Chittaguda (3rd and 4th Line) (19.22 kms.)
29.Final Location Survey for Doubling Sulehalli-Malkhaidroad (3rd and 4th Line) (17.18 kms.)
30.Final Location Survey for Doubling Tandur-Nawandgi(3rd and 4th Line) (18.95 kms.)
31.Final Location Survey for Doubling Vikarabad-Dharur (3rd and 4th Line) (22.27 kms.)
32.Final Location Survey for new line between Manuguru -Ramagundam
33.Final Location Survey for Bodhan-Bidar via Banswada New Line (138 Km)
34.Final Location Survey for Bye-pass line at Purna Jn to connect Purna-Akola line to Manmad-SC line (3.05 km)
35.Final Location Survey between Gangakher -Vadaganilla (DL)
36.Final Location Survey between Parbhani - Pokarni narasimha (DL)
37.Final Location Survey between Pokarni narasimha -Gangakher(DL)
38.Final Location Survey between Vadaganilla - Parli(DL)
39.Final Location Survey for 3rd line between SC-KZJ
40.Final Location Survey for 3rd line between SC-Wadi
41.Final Location Survey for 3rd line between SLODuvvada
42.Final Location Survey for Doubling Bhongir (BG)-Bibinagar (BN) 3rd Line (15 kms.)
43.Final Location Survey for Doubling Bhongir-Aler (3rdand 4th Line) (24.4 kms.)
44.Final Location Survey for Doubling Chitgidda (CTF) -Vikarabad (VKB) 3rd Line (9.93 kms.)
45.Final Location Survey for Doubling Dharur (DRR) -Tandur (TDU) 3rd Line (20.64 kms.)
46.Final Location Survey for Doubling Ghanpur-Raghunathpalli (3rd and 4th Line) (17.2 kms.)
47.Final Location Survey for Doubling Ghatkesar- Bibinagar (3rd and 4th Line) (14.25 kms.)
48.Final Location Survey for Doubling Kazipet-Ghanpur(3rd and 4th Line) (21.25 kms.)
49.Final Location Survey for Doubling Lingampalli-Shankarpalli (3rd and 4th Line) (22.29 kms.)
50.Final Location Survey for Doubling Nawandgi (NAW)- Malkhaid Road (MQR) 3rd Line (29.5 kms.)
51.Final Location Survey for Doubling Nizamabad Station(8 kms.)
52.Final Location Survey for Doubling Raghunathpalli(RGP)-Aler (ALER) 3rd Line (28 kms.)
53.Final Location Survey for Doubling Sanathnagar(S.NoF) -Lingampalli (LPI) 3rd Line (14.12 kms.)
54.Final Location Survey for Doubling of Akola – Dhone
via Purna, Mudhkhed, Secunderabad, Mehboobnagar
excluding Purna – Mudkhed and Bolarum –
Mehboobnagar including Dhone bye-pass (626 Km)

#Scr #SCRrailway #scrinfra
Please find the source as an attachment.

Translate to English
Translate to Hindi

6 Posts

23830 views
2

Nov 26 2023 (05:38)
NaagendraV
NaagendraV   286 blog posts
Re# 5893062-7              
Bro, e document financial year(2023-24) starting lo prepare chesindhi anukunta. document mottam lo Revised estimates unnai. pls see the attachment.
Translate to English
Translate to Hindi

19558 views
0

Nov 26 2023 (06:32)
NaagendraV
NaagendraV   286 blog posts
Re# 5893062-8               Past Edits
No.we are lived in such assumptions till now. since 1966 onwards importance/high priority given to Hyd,SC and nanded division, jurisdiction only and their needs. Requesting you to go through the previous railway budgets and proposal from SCR.
Translate to English
Translate to Hindi

19959 views
0

Nov 26 2023 (06:35)
NaagendraV
NaagendraV   286 blog posts
Re# 5893062-9              
if you considered high priority given to Andhrapradesh then from 1966 to till now under BZA,GTL why SCR constructed only one new lines. Krishnapatnam port to obulavaripalle, this project progress tracked by venkaiah naidu as a vice president. this track is used for goods transport now. except this i don't see any new routes/tracks/railwaylines.
Translate to English
Translate to Hindi

26069 views
1

Nov 26 2023 (10:37)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5893062-10              
SCR should have more accurate.
25. Tenders allocation is in process for Aurangabad-Ankai doubling work.
# Final Location Survey is going for Aurangabad-Parbhani doubling.
Translate to English
Translate to Hindi

16645 views
0

Nov 26 2023 (11:24)
NaagendraV
NaagendraV   286 blog posts
Re# 5893062-11               Past Edits
This document may prepared beginning of the financial year 2023-24 post budget allocation. now almost, we are in last quarter of the financial year so might not have the latest Status.
Translate to English
Translate to Hindi
Page#    427 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy