
PART 3:
The LP saw me taking a closer look and looked quizzingly. I said, I was checking the loco link and even provided him with info that ERS WDM 3A is the regular link it gets to which he replied that though this loco was the link, it sometimes changes last minute depending upto the loco that arrives with the other train. I presume he was talking about loco RSAs here. I asked him the speed and he said, he will take it at 110 kmph upto MAO which was his destination.
.
After GR wound its way out of UD, I was checking for some empty berth in nearby 3A coach which was already packed to capacity. The maintenance of the...
Read more... rake is not upto the mark. From the look, it didn’t seem to be POHed recently. Spotted some cracked window panes, rubber of the Glass door worn off and in most cases, the curtains were jammed. In our coach , the coach indicator installed near the door was not working (God knows, for what they were installed). It after all marked a perfect GARIB RATH. It was just like visiting a colony where GARIB people reside with the only remarkable difference that it was Centralized AC. Even SL coaches are better maintained.
.
I came back to my seat and noticed a few seats were empty. So from cramped 3 x 3 seats we relaxed ourselves to 2x 2 in the seats and soon with the tiredness dozed off. Meanwhile our GR was just speeding hazily. After an hour or two, I woke up to see we have skipped many stations in Dakshin Karnataka. I went to the foot board and our train was just screeching to an unscheduled halt at Murudeshwar. GR was running around 15 mins late. The Shiva temple and its lighted Gopuram can be clearly seen in the dark background. LP who had come down to attend his nature call, spotted me at the door and asked “abi tak soye nahi kya?”. I said, I will be alighting in an hour’s time and hence ok.
.
We had halted at Murudeshwar for crossing of Netravati Express, which was running an hour behind schedule. Once we got a clear go ahead signal and the WDM unleashed its beast within as if to cover up its lost time. The aggressive run by the beastie ensured we reached Madgaon dot on time @ 01.20 hours. LPs changed their duties. After a brief halt of about 10 minutes, GR left MAO. I was hoping that is soon reaches its next station – our destination so that I can have a good sleep at home as I had to report to work next day. But nothing happens as we plan.
.
GR left swiftly from Madgaon and reached Verna where it was given an unscheduled halt for a crossing. We waited and waited and waited for around 20 minutes still there was no sign of the train. Finally after half an hour, Mangalore bound Matsyagandha Express hauled by a WDP/G went speeding by. I was in no mood to shoot it, though the speed was awesome.
.
Finally, GR started for our last run to our destination station and reached around 40 minutes late. We got down at Karmali, walked almost half the length of platform and made our way to home. We reached home around 3.30am. I was wondering, had we got down at Madgaon, we could very well had reached home 45 mins early – an 45 minutes of extra sleep in my warm cozy bed……. I don’t remember when I drifted off to sleep….
Punctuality; 7/10
Coach condition: 4/10
Speed: 9/10