Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jun 27, 2017 19:42:13 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jun 27, 2017 19:42:13 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
Details Edit
Large TB;
Entry# 1383009-0

12845/Bhubaneswar - Bengaluru Cantt. SF Express (PT)
ଭୁବନେଶ୍ଵର - ବେଂଗାଲୁରୁ ସେନାନୀବାସ ଏକ୍ସପ୍ରେସ     भुवनेश्वर - बैंगलूरु छावनी एक्सप्रेस

BBS/Bhubaneswar --> BNC/Bengaluru Cantt. (Bangalore)

Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✕ E-Catering
Latest News
(You need to double-check/verify this info yourself)
Running with SE1 (duration unknown). Ref: https://indiarailinfo.com/pnr/post/1924709
Sat Jul 23, 2016 (11:06PM)
Updated: May 10 2017 (06:24) by Jay Shah*^~
Change Departure Station:
Change Arrival Station:
RSA - Rake Sharing
12829/12830bhubaneshwar Chennai Superfast
Rating: 3.9/5 (52 votes)
cleanliness - good (9)
punctuality - excellent (10)
food - good (8)
ticket avbl - average (10)
u/r coach - average (3)
railfanning - excellent (7)
safety - good (8)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
S11
  5
S10
  6
 S9
  7
 S8
  8
 S7
  9
 S6
 10
 S5
 11
 PC
 12
 S4
 13
 S3
 14
 S2
 15
 S1
 16
 B3
 17
 B2
 18
 B1
 19
 A2
 20
 A1
 21
GEN
 22
GEN
 23
SLR
VSKP
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Pics    

Train Forum

Page#    478 blog entries  next>>
  
★★  General Travel
Feb 10 2016 (10:16)   VSKP/Visakhapatnam Junction (8 PFs)
 

Mangalagiri   341 blog posts
Entry# 1734723            Tags   Past Edits
Time has come for VSKP to say Good bye to ECoR ..
Announcement on Vizag zone after Union Budget, says Sujana
: Chief Minister N. Chandrababu Naidu has requested the Railway Ministry to take an expeditious decision on the creation of Visakhapatnam railway zone.
The Chief Minister, accompanied by Union Minister Y.S. Chowdary and P. Ashok Gajapati Raju, called on Railway Minister Suresh Prabhu
...
more...
in New Delhi on Tuesday. Mr. Naidu submitted representation seeking speedy completion of pending works in the State, including connectivity between Amaravati and major cities in the south through high-speed trains.
He wanted the Railway Ministry to make sufficient budgetary allocations for the completion of the Kakinada-Pithapuram, Nadikudi-Srikalahasti and Guntukal-Srikalahasti lines besides requesting the Centre to hand over maintenance of the old bridge at Rajahmundry to the State Government. The State emphasised the need for ensuring that the allocations were made in the upcoming railway budget.
Mr. Chowdary said the Centre had given in-principle clearance for the railway zone in Visakhapatnam and the zone would be announced after the Union Cabinet formally gives its nod.
Development package
Creation of the special railway zone was part of the special development package assured to the State post bifurcation.
The State had also sought the Ministry to take up works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada. The Ministry was requested to consider the proposal for laying third line between Visakhapatnam and Chennai besides examining the proposals for development of infrastructure at important railway stations through joint ventures.
The Railway Minister, he said, positively responded to the representation and promised that surveys would be undertaken on the proposals submitted by the State Government as well as the MPs from the State.
Thrust areas
Sufficient budgetary allocations for completion of Kakinada-Pithapuram, Nadikudi-Srikalahasti, Guntukal-Srikalahasti lines
Commencement of works on feeder line connecting the new capital Amaravati with Guntur and Vijayawada
Third line sought between Visakhapatnam and Chennai
click here

22 posts - Wed Feb 10, 2016

66 posts - Thu Feb 11, 2016

  
67818 views
Feb 11 2016 (18:15)
LHB Coromandal A Dream^~   6677 blog posts   8511 correct pred (74% accurate)
Re# 1734723-106            Tags   Past Edits
Even if train got extended to BBS, still its going via VSKP city and catering to both cities.

  
68305 views
Feb 11 2016 (18:23)
LHB Coromandal A Dream^~   6677 blog posts   8511 correct pred (74% accurate)
Re# 1734723-107            Tags   Past Edits
#moderator
#system
#FM
Bashing is going on on full height against a specific Zone and State.
Kindly Lock this blog.

  
Feb 11 2016 (18:28)
South East Coast Railway SECoR™   501 blog posts   449 correct pred (59% accurate)
Re# 1734723-108            Tags   Past Edits
how come it is catering both the cities
quota for VSKP had been decreased by ECoR, infact BBS has more quota than VSKP, for its extended trains - isn't true?
new coaches allotted to WAT are replaced by old coaches within weeks of their inauguration - isn't true?
new trains proposed for VSKP are rejected by ECoR stating irrelevant reasons and the same
...
more...
trains are lobbied to start from BBS - isn't true
trains running from BBS are given proper/effecient TT, while that of VSKP are given TT full of slacks or less TAT - isn't true?

  
67671 views
Feb 11 2016 (18:28)
kalingaUtkal   224 blog posts
Re# 1734723-109            Tags   Past Edits
Yes, you are right.
Nothing has happen till now. But so many bashings are going on. First Rly. Ministry will discuss with Odisha Govt. as per the demands in this reagard, than any fruitful news may come for A.P peoples.

  
Feb 11 2016 (18:30)
system   939 blog posts
Re# 1734723-110            Tags   Past Edits
Auto-Archived due to Objections.
  
★★  Rail Fanning
May 10 2016 (19:53)   12137/Punjab Mail (PT) | CSTM/Mumbai Chhatrapati Shivaji Terminus (18 PFs)
 

अमरावती सुपरफास्ट~   587 blog posts   18 correct pred (72% accurate)
Entry# 1840655            Tags   Past Edits
LIST OF THE OLDEST TRAINS FROM EACH ZONE:
The first long distance train started in each zone. The oldest and historic one.
1. CR: 12137/8 Punjab Mail (Yr. 1929 as The Punjab Limited between Bombay & Lahore) and 12123/4 Deccan Queen Express (Yr. 1930 as Deccan Queen)
2. ECoR: 12845/6 Bhubaneswar - Bengaluru Cantt. SF Express (01.04.2003) Previously, 8415/6 BBS-YPR Express (As per
...
more...
reply to RTI by ECoR)
3. ECR: 12391/2 Shramjeevi Express (1991) OR 12553/4 Vaishali Express
4. ER: 12311/2 Kalka Mail (Yr. 1866 as the East Indian Railway Mail)
5. KR: 10111/2 Konkan Kanya Express (Yr. 1998)
6. NCR (2002): 12451/2 Shram Shakti Express (01.09.2002) and 14115/Allahabad - Haridwar Express (16.02.2004) (As per 2 different replies to RTI by NCR)
7. NER:
8. NFR: 15909/10 Avadh Assam Express (Yr. 1960/1961 as the 1/2 Avadh Tirhut Mail)
9. NR: 14055/6 Brahmaputra Mail (Yr. 1972 as Tinsukia Mail) (Reply to RTI by NR: No such information is available)
10. NWR (10.2002): 1JS/2JS, 3JS/4JS Jaipur Jodhpur Passenger (As per reply to RTI by NWR)
11. SCR: 17031/2 Mumbai - Hyderabad Express (Yr. 1962)
12. SECR: 405B/406B Bilaspur - Bishrampur Express (01.07.2003) (As per reply to RTI by SECR).
18235/6 Bhopal - Bilaspur Express (1964) OR 18237/8 Chhattisgarh Express (Yr. 1977) OR 18233/4 Narmada Express
13. SER: 12859/60 Geetanjali Express (Yr. 1977) OR 12809/10 Mumbai - Howrah Mail
14. SWR: 12657/8 Chennai Central - KSR Bengaluru Mail (Yr. 1864)
15. SR: 12601/2 Chennai - Mangaluru Mail (Yr. 1884) OR 12839/40Chennai - Howrah Mail (Yr. 1900) OR 12615/6 Grand Trunk (GT) Express (Yr. 1928)
16. WCR: 12189/90 Mahakaushal Express (as 1449/50 Qutub Express)
17. WR: 12903/4 Golden Temple Mail (Yr. 1928) OR 19165/6 Sabarmati Express

31 posts - Wed May 25, 2016

  
39707 views
May 25 2016 (13:36)
Praveen Srivastva SSM~   325 blog posts   18 correct pred (72% accurate)
Re# 1840655-33            Tags   Past Edits
I don't know about oldest train of ECoR zone but Neelanchal exp is older than Purushottam exp.

  
39005 views
May 27 2016 (00:49)
LHB Coromandal A Dream^~   6677 blog posts   8511 correct pred (74% accurate)
Re# 1840655-34            Tags   Past Edits
oops..Sorry..My Mistake...I misunderstood you as the original blogger who post this list above...Sorry for this misunderstanding...
Thanks for correcting....:)

  
38937 views
May 27 2016 (00:51)
LHB Coromandal A Dream^~   6677 blog posts   8511 correct pred (74% accurate)
Re# 1840655-35            Tags   Past Edits
I think Neelachal was introduced somewhat near about in the time span of 1985-1990.....But Purushottam was introduced in 1980..This is confirmed...

  
39082 views
May 27 2016 (00:51)
LHB Coromandal A Dream^~   6677 blog posts   8511 correct pred (74% accurate)
Re# 1840655-36            Tags   Past Edits
Its your blog, so your decision to decide the criteria but i just wish inform you that if you are making any Zone Wise Oldest train, then You CAN NOT consider the zone allocation to the respective train at time of inaugration. You HAVE to consider the PRESENT zone allocation like Chennai Mail while at start was under SR, but you have to tag it under SER only. Same is with Kalka Mail. While at the start it was under GIBR , So that doesnt means you will tag kalka mail under GIBR. You have to tag it under ER only.
Similarly at the start Purushottam exp was under SER, but you CAN NOT tag it under SER. You have to
...
more...
tag it under ECoR only.

  
36274 views
Jun 08 2016 (10:15)
Prakhar*^~   4215 blog posts   412 correct pred (82% accurate)
Re# 1840655-37            Tags   Past Edits
Interesting blog.
.
Waise I think Prayagraj wud b d olest train of NCR.
.
However this may b d Case dat PR wud hav been xfer to NCR after SS introduction.
  
General Travel
0 Followers
730 views
May 05 2017 (22:21)   12845/Bhubaneswar - Bengaluru Cantt. SF Express (PT)

utkal andhra~   781 blog posts
Entry# 2264817            Tags   Past Edits
B4 is highly necessary to provide extra facility for passengers and to increase income for Railway

11 posts - Sun Dec 11, 2016 - are hidden. Click to open.

4 posts - Mon Dec 12, 2016 - are hidden. Click to open.

4 posts are hidden. Click to open.

  
3577 views
Dec 12 2016 (09:10)
SCR Godavari Express~   2599 blog posts   11 correct pred (92% accurate)
Re# 2087806-17            Tags   Past Edits
at WFD/Whitefield
Arrived...

  
3416 views
Dec 12 2016 (09:57)
SCR Godavari Express~   2599 blog posts   11 correct pred (92% accurate)
Re# 2087806-18            Tags   Past Edits
Started from Whitefield after 40 mins halt.

  
3480 views
Dec 12 2016 (10:09)
deepakyerr~   934 blog posts
Re# 2087806-19            Tags   Past Edits
It I'll reach KJm at 1010 and arrive BNC at 1030 still 20mins ahead of schedule.

  
3428 views
Dec 12 2016 (10:09)
SCR Godavari Express~   2599 blog posts   11 correct pred (92% accurate)
Re# 2087806-20            Tags   Past Edits
TRIP HAS ENDED.
Reached KJM..alighting here..

  
3510 views
Dec 12 2016 (10:10)
K K   13643 blog posts   20331 correct pred (66% accurate)
Re# 2087806-21            Tags   Past Edits
Hj bro..
  
Predictions: 9
confirm: 9
rac: 0
wl: 0
Journey: Tue Dec 06, 2016 @ 08:25
Class: Sleeper - SL   |   Tot Seats: Avbl 362
Travel: BNC/Bengaluru Cantt. (Bangalore)   to   BBS/Bhubaneswar   |   1511 km / 1511 km
12846/Bengaluru Cantt. - Bhubaneswar SF Express
Entry# 2070463

PNR: 474-xxxxxxx   |   Similar PNRs
Posted Status as of: Nov 25 2016 (00:05)
Passenger 1: RAC 92 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.
Posted thru RailCal

Latest Status as of: Dec 06 2016 (22:32)
Passenger 1: SE1,22 [UB] (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart PREPARED

Full PNR Status History (38 statuses)
Status as of: Dec 05 2016 (22:44)
Passenger 1: SE1,22 [UB] (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart PREPARED

Status as of: Dec 05 2016 (21:04)
Passenger 1: SE1,22 [UB] (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart PREPARED

Status as of: Dec 05 2016 (14:52)
Passenger 1: RAC 40 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 05 2016 (14:12)
Passenger 1: RAC 42 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 05 2016 (12:47)
Passenger 1: RAC 46 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 05 2016 (09:04)
Passenger 1: RAC 47 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 05 2016 (08:59)
Passenger 1: RAC 47 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 04 2016 (22:14)
Passenger 1: RAC 48 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 04 2016 (20:46)
Passenger 1: RAC 48 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 04 2016 (17:41)
Passenger 1: RAC 54 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 04 2016 (15:09)
Passenger 1: RAC 54 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 04 2016 (12:53)
Passenger 1: RAC 57 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 04 2016 (12:10)
Passenger 1: RAC 58 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 03 2016 (22:40)
Passenger 1: RAC 60 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 03 2016 (17:11)
Passenger 1: RAC 61 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 03 2016 (15:39)
Passenger 1: RAC 62 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 03 2016 (12:44)
Passenger 1: RAC 64 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 02 2016 (10:04)
Passenger 1: RAC 65 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 01 2016 (22:15)
Passenger 1: RAC 67 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 01 2016 (22:13)
Passenger 1: RAC 69 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 01 2016 (20:52)
Passenger 1: RAC 70 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 01 2016 (19:06)
Passenger 1: RAC 71 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Dec 01 2016 (10:12)
Passenger 1: RAC 74 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 30 2016 (16:09)
Passenger 1: RAC 75 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 29 2016 (10:14)
Passenger 1: RAC 80 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 28 2016 (14:19)
Passenger 1: RAC 82 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 27 2016 (12:35)
Passenger 1: RAC 86 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 26 2016 (13:40)
Passenger 1: RAC 88 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 26 2016 (09:48)
Passenger 1: RAC 89 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 25 2016 (23:07)
Passenger 1: RAC 90 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 25 2016 (10:02)
Passenger 1: RAC 91 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 25 2016 (01:14)
Passenger 1: RAC 91 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 24 2016 (04:40)
Passenger 1: RAC 92 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 22 2016 (18:13)
Passenger 1: RAC 93 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 21 2016 (21:14)
Passenger 1: RAC 94 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 21 2016 (15:29)
Passenger 1: RAC 97 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 16 2016 (23:37)
Passenger 1: RAC 107 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared

Status as of: Nov 16 2016 (01:21)
Passenger 1: RAC 108 (Booking Status: W/L 14,GNWL)
Total Fare:  625
Chart NOT Prepared


  
2956 views
Dec 05 2016 (21:48)
Jai Ho ™^~   12067 blog posts   119060 correct pred (75% accurate)
Re# 2070463-1            Tags   Past Edits
Page#    478 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.