Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sat Apr 20 08:03:42 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

47151/Umdanagar - Lingampalli MMTS
उमदानगर - लिंगमपल्ली एमएमटीएस

FM/Falaknuma --> SC/Secunderabad Junction

Latest News
(You need to double-check/verify this info yourself)
Cancelled on 12.05.2019 Due to Traffic Block.
Sun May 12, 2019 (12:43AM)
News History
0 Follows
Bedroll/Linen: NOT Available
Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✕ E-Catering
Updated: Oct 01 2023 (00:02) by TRG
Dep:
Arr:
RSA - Rake Sharing
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Loco
ICF Rake

Rake/Coach Position

News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    4 blog entries  
General Travel
239967 views
4

Apr 02 2022 (16:18)   47151/Umdanagar - Lingampalli MMTS | SC/Secunderabad Junction (10 PFs)
Sheikkaleemmaulali~
Sheikkaleemmaulali~   806 blog posts
Entry# 5264301            Tags   Past Edits
The sad and pathetic state of suburban travel(mmts) in Hyderabad
*See the below image for example
The old train was running with 1hr 30min for a distance of 38km (25kmph)
The new time table which shows further delay by 20 min(38km in 2hr ~20kmph)
Plus
...
more...
we can regularly see delay of 10 mins
lol atleast by road or cycle would seem better
Hyderabad metro with frequent stops(every 1km) give 36kmph
There is a lack of frequency too on secunderabad lingampalli route (24 services with mostly a service every 1 hour and scr lacks the rush hour logic 😂(same 1 local for hour
Scr always wants to push every long distance train to Secunderabad and also the demand from ap and Maharashtra people that every express train needs to pass by lingampalli..at cost of suffering of daily commuters of Hyderabad.. every time scr is diverting train through lpi ..one mmts service is getting delayed or cancelled
At secunderabad station to cross 2 km strech it will take 10-20 min..

On the other end bus transport (tsrtc) has multiple services (every 30 secs approx ) from secunderabad to pathancheru (near to lpi)(30km in 2hrs 15kmph speed ticket is 35rs but running in profit (it has peak ridership)
Since tsrtc has hiked bus ticket there will be sharp shift towards mmts and metro ... even if scr wants to increase ticket from (10 to 20rs it won't effect ridership)

A daily commuters knows the pain of Begumpet-secunderabad bus route (5km will take 30min daily and 1hr during monsoon) only metro and mmts are at rescue

Plus mmts phase 2 whose ghatkesar,ramachandrapuram,umdanagar(near to airport) will be hit from day 1 itself , medchal line (would gain ridership if trains run regularly at bodhan , nizamabad,medak, siddipet (Karimnagar)

There is rapid growth of population in Hyderabad like it hub at medchal in North,
Cherlapally railway terminal , Infosys (ghatkesar), industrial and it hub at cherlapally(which is already running ) and huge townships at cherlapally, ghatkesar, bhongir , boduppal, yadagirigutta temple at bhongir

Dont know how secunderabad will be handled without extra platforms what i guess scr will 5 services on each section and wipe out its hands

With the ongoing tussle bw scr and Telangana government about mmts phase 2 project where scr needs to deposit 2/3 of 900 crores
It would be hard for new project's ..
Initially when mmts phase was developed using states partnership all single lines were doubled and promise was made that mmts will be given priority over express , now the result is opposite..
Mmts phase 1 was planned without future prediction ... lack of platform at Begumpet junction and kacheguda (new pfs came around 2016)

All network around india are bieng quadrapled or 6/8 lines , but secunderabad bieng a junction of around 20 national lines (i mean routes) still a double line section

My current demand if phase 2 is introduced will be
1) lingampalli falaknuma mmts train needs to be eliminated and run as lingampalli secunderabad and secunderabad falaknuma section
2) No phase 2 trains passing through secunderabad must run upto lingampalli.Instead run as seperately bw
i) Hyderabad-lingampally/pathancheru
ii) secunderabad-pathancheru
iii) secunderabad- ghatkesar via malkajgiri or maulali based on slot available
iv)secunderabad-bolarum-medchel-manoharabad
(iv) secunderabad-falaknuma-umdanagar
(v) ghatkesar /cherlapally - lingampalli/sanathnagar

What my future demand is that with priority in order the following works needs to be executed
1) Begumpet lingampalli quadrapling in 2 phases
Phase A : lingampalli - sanathnagar could be easily executed by railway because of land availability
Phase B: sanathnagar- Begumpet must be executed by state (giving land for free because state is already widening roads and flyovers .. Begumpet railway station could be eliminated fully or partially due to land problems
2)trains should be run between lingampalli-neclace road(hussain sagar) by creating terminating platform later could be executed upto khairtabad (if land from maqta basti is taken)

3) secunderabad - lalaguda section must be made a clear 7-8 line section..
(3/4 for kzj , 2 for bolarum/mkj,2 for kcg Bound train's)
currently it is 5 line section (3 fully dedicated to kzj other 2 bieng shared by kcg /bolarum line

4)if possible in future seperate terminal (6pf) at secunderabad chilalguda side
Which must be used for emu /demu/memu trains combinedly (in future small towns Like nzb gajwel, siddipet, mahbubnagar will be connected with memus
land is fully available with the demolition of staff quarters (roads needs to be redesigned)

5)3/4 line section bw malkajgiri - sitaphalmandi bypass section so that bypass trains pass without hassle
Eventhough metro has parallel lines but mmts can also give tough competition considering the geography of Hyderabad and person traveling bw opposite directions will always opt mmts ( north south, north east , east west) and for ppl boarding long distance trains will opt mmts only coz it would comfortable
Don't know what be the future but atleast a strong planning and design should be made

Translate to English
Translate to Hindi

10 Posts

30176 views
0

Apr 03 2022 (09:41)
VivekSingh~
VivekSingh~   1745 blog posts
Re# 5264301-11              
It's not impossible, IR has done this kind of exercise when they expanded the Aishbagh Lucknow City line under the Rakabganj bridge to set as per the norms of BG.

But it amount of land in question here is higher and it will take solid amount of time and effort + financial aspects. Not to mention the support from the State govt.
Translate to English
Translate to Hindi

27849 views
0

Apr 03 2022 (10:08)
UTTARANDHRARAILSEVA~
UTTARANDHRARAILSEVA~   1838 blog posts
Re# 5264301-12              
33 km stretch between BZA & GNT takes around one hour to cover even after doubling and electrification.
Translate to English
Translate to Hindi

26562 views
0

Apr 03 2022 (16:27)
Sheikkaleemmaulali~
Sheikkaleemmaulali~   806 blog posts
Re# 5264301-13              
In my post i already mentioned Begumpet railway station to be totally eliminated
Instead necklace road (for Nampally bound trains) and sanjevayya park station for secunderabad bound trains can be used both stations can reclaim hussain sagar land
Or nature hospital station (both Nampally and sc bound trains) land can be bought from Hyderabad public school
And also if speed is good the
...
more...
need of Begumpet station can also be eliminated (lpi and sc/hyb can be used) in past many stations are eliminated if coming in traffic zone
When apartments and bastis are bieng demolished for road building works why cant same be done for railways
A metro city like Hyderabad needs strong intercity rail network , some hard work is needed , compare metro cities like delhi , mumbai (bandra terminus is almost in inaccessible area)

Translate to English
Translate to Hindi

26418 views
0

Apr 03 2022 (16:31)
Sheikkaleemmaulali~
Sheikkaleemmaulali~   806 blog posts
Re# 5264301-14              
Opposite secunderabad railway station at bhoiguda chilalguda side there were railway quarters which are totally demolished and staying vacant
The total measuring area is 1km long and 0.5 km width
Parking and station building can be made and platform need to connected using foot over bridges
Translate to English
Translate to Hindi

27923 views
0

Apr 03 2022 (16:37)
Sheikkaleemmaulali~
Sheikkaleemmaulali~   806 blog posts
Re# 5264301-15              
Sc Begumpet quadrapling can be highly costly and not be needed in near future also
But Begumpet lpi quadrapling is very much needed
Translate to English
Translate to Hindi
Info Update
18587 views
0

Feb 18 2022 (23:30)   47151/Umdanagar - Lingampalli MMTS | FM/Falaknuma (3 PFs)
Snehashish_railfan^~
Snehashish_railfan^~   24979 blog posts
Entry# 5222074            Tags  
Change in Train Timings
Translate to English
Translate to Hindi

More Posts
Rail Fanning
15547 views
0

Feb 03 2019 (07:52)   47151/Umdanagar - Lingampalli MMTS | SC/Secunderabad Junction (10 PFs)
jaganadhamrajesh~
jaganadhamrajesh~   1013 blog posts
Entry# 4216513            Tags  
SC Arriving Falaknuma Lingampalle MMTS
Translate to English
Translate to Hindi
General Travel
250056 views
0

Jan 11 2017 (14:11)   47149/Falaknuma - Lingampalli MMTS | FM/Falaknuma (3 PFs)
12723_AP_12724^~
12723_AP_12724^~   20577 blog posts
Entry# 2123471            Tags   Past Edits
What is the status of MMTS Phase-II?
I tweeted to DRM SCR a long ago, but didn't got a single reply from them.
I have seen some works going at Umdanagar Station and NPA Shivrampally Station.
Few works near Ghatkesar.
What
...
more...
is the status of it?
When it is expected on track?

Translate to English
Translate to Hindi
Page#    4 blog entries  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy