Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Apr 25, 2017 05:00:05 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Apr 25, 2017 05:00:05 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
Details Edit
Close-up; Front-facing; Large TB; UnReserved; Outside of Train; Standing;
Entry# 1542818-0
Details Edit
Large TB;
Entry# 1704016-0
Details Edit
Close-up; Front-facing; Small TB; 2 AC; Outside of Train; Standing at Station;
HDR
Entry# 2246820-0
Details Edit
Medium; Small TB; 2 AC; Outside of Train; Standing at Station;
Entry# 2246820-0

14257/Kashi Vishwanath Express
کاشی وشوناتھ ایکسپریس     काशी विश्वनाथ एक्सप्रेस

BSB/Varanasi Junction --> NDLS/New Delhi

Inaugural Run
Sun Aug 01, 1976
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✓ E-Catering
Latest News
(You need to double-check/verify this info yourself)
.
Wed May 11, 2016 (09:34PM)
Updated: Oct 01 2016 (17:20) by UP 72 AND HR 29*^~
Change Departure Station:
Change Arrival Station:
RSA - Rake Sharing
NIL, An ISO certified train; 2 dedicated rakes with CBC Couplings
Rating: 4.2/5 (124 votes)
cleanliness - good (21)
punctuality - excellent (22)
food - good (21)
ticket avbl - good (21)
u/r coach - good (7)
railfanning - good (20)
safety - excellent (19)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
GEN
  3
GEN
  4
HA1
  5
 A1
  6
 B1
  7
 B2
  8
 B3
  9
 PC
 10
 S1
 11
 S2
 12
 S3
 13
 S4
 14
 S5
 15
 S6
 16
 S7
 17
 S8
 18
 S9
 19
S10
 20
S11
 21
GEN
 22
GEN
 23
SLR
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Pics    

Train Forum

Page#    767 blog entries  next>>
  
General Travel
0 Followers
188 views
Apr 23 2017 (17:38)   14258/Kashi Vishwanath Express (PT)

Tushar Rai   6 blog posts
Entry# 2247412            Tags   Past Edits
In sleeper class in kashi vishwanath express from ndls to bsb if you have RAC then do you have to share seats in side lower or you get individual seats??

  
149 views
Apr 23 2017 (17:41)
ధూమ శకటం~   227 blog posts   3 correct pred (60% accurate)
Re# 2247412-1            Tags   Past Edits
Share with another passenger

  
165 views
Apr 23 2017 (17:42)
Abhishek Jaiswal   45561 blog posts   18454 correct pred (69% accurate)
Re# 2247412-2            Tags   Past Edits
Share.!

  
127 views
Apr 23 2017 (17:53)
Vote for Durg HumSafar Vs BSP Rajdhani^~   80628 blog posts   5098 correct pred (78% accurate)
Re# 2247412-3            Tags   Past Edits
If your RAC don't clear then you have to share seat.
  
★★  Rail Fanning
0 Followers
539 views
Apr 23 2017 (10:16)   14258/Kashi Vishwanath Express (PT) | GZB/Ghaziabad Junction (6 PFs) | TKD/WDP-4D/40252

mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Entry# 2246820            Tags   Past Edits
*****Varanasi-Kharagpur Trip****turned out to be****Varanasi-Ghazipur Trip******
___Last Chapter___
Includes Various Random Pics which were left for the upload.
1 & 2. TKD 4D hauling Legendary Kashi V. Express arriving PF-2 of Ghaziabad Jn.
3,4
...
more...
& 5. The Legendary Kashi V. Express standing on PF-2 of Ghazibad Jn.
6. Almost completed electrification work between Aunrihar Jn. and Ghazipur City. Pic taken from road crossing at Saheri. The work over left is at station and pit lines only. Rest completed.
7. 3 in 1 frame at Ghazipur City. Ballia-Varanasi Passanger on PF-1, Ghazipur-Varanasi DEMU via Jaunpur on Main Line, Lucknow-Chhapra Express which arrived bang on time at PF-2.
8 & 9. Lucknow-Chhapra Express hauled by Gonda Smoking Hunk waiting for departure signal at PF-2 Ghazipur City.
10. Incredible India coach with #TB the Freeholder of Ghazipur "SuhaldevSuperfast" at PF-1.
11. A night scene at Ghazipur City with LED paletes still work under process. (Final touch before inaugration).
Pic Courtesy: Younger Bro. (for pic 7,8,9 &10)
Rest all clicked by me. Still some are remaining for upload. will upload it as random when free.
till than do enjoy this blog. and do not forget to rate if you liked it.... :) :D
copyright Mr. Wayne

2 posts - Sun Apr 23, 2017

  
337 views
Apr 23 2017 (11:20)
Going to travel in Nzm Durg HumSafar on 26 April^~   33093 blog posts   25878 correct pred (77% accurate)
Re# 2246820-6            Tags   Past Edits
Arj- bsb electrification ka kya status h

  
329 views
Apr 23 2017 (11:32)
mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Re# 2246820-7            Tags   Past Edits
ARJ to SRNT poles are placed...wiring remaining... as doubling is completed... while placement of poles is being done between BCY-SRNT on a slow pace... with no sign of doubling between Sarnath-Varanasi City. as observed. and from Varansi City to Varansi Jn. no sign of doubling as well as electrification. The third line which underpasses Varuna Brigde is Single BG.

  
316 views
Apr 23 2017 (11:35)
Going to travel in Nzm Durg HumSafar on 26 April^~   33093 blog posts   25878 correct pred (77% accurate)
Re# 2246820-8            Tags   Past Edits
Bsb to srnt will take some times uske lund block Lena padega NER Ko, baaki srnt to get electrification is diwaali to ho Jana chahiye, gct to Ballia ka kya haal h?

  
309 views
Apr 23 2017 (11:35)
Going to travel in Nzm Durg HumSafar on 26 April^~   33093 blog posts   25878 correct pred (77% accurate)
Re# 2246820-9            Tags   Past Edits
Aur gct to bui doubling ka??

  
304 views
Apr 23 2017 (11:47)
mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Re# 2246820-10            Tags   Past Edits
down side kami koi info nai h... may be under process h shayad electrification.
TRIP HAS ENDED.
Blog  Time-Table

  
250 views
Apr 20 2017 (07:50)
Trains At Glance~   613 blog posts   4 correct pred (100% accurate)
Re# 2237461-1            Tags   Past Edits
Any Chance for confirmation..?
Departure: Mon Apr 17 2017 @ 12:20
14258/Kashi Vishwanath Express (PT)
Trip# 107117    Traveller: mr wayne ®©~    Linked PNR Entry# 2237138
Class: AC 2-tier - 2A
From: GZB/Ghaziabad Junction
To: BSB/Varanasi Junction
19 wishes
HJ HJ HJ HJBW HJ HJ HJ HJ HJ HJ HJ HJ HJ HJ bhai HJ HJ HJ HJ HJ
TRIP HAS ENDED.
Blog  Time-Table

1 posts - Sun Apr 16, 2017 - are hidden. Click to open.

60 posts - Mon Apr 17, 2017 - are hidden. Click to open.

  
1446 views
Apr 17 2017 (21:17)
mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Re# 2237138-63            Tags   Past Edits
Dehradun Update....
17th April-22th May these pair of 8 trains will short terminate at Haridwar Jn insted of Dehradun due to station refurbishment.
here is the list. yesterday only news came to me but was not confirmed.
List of Affected Trains
New
...
more...
Delhi-Dehradun Shatabdi
Dehradun-New Delhi Shatabdi
Indore-Dehradun Express
Dehradun-Indore Express
Dehradun-Okha Uttaranchal Express
Okha-Dehradun Uttaranchal Express
Dehradun-Kochiveli Express
Kochiveli-Dehradun Express
Dehradun-Ujjain Ujjaini Express
Ujjain-Dehradun Ujjaini Express
Madurai- Dehradun Superfast Express
Dehradun-Madurai Superfast Exp
Source: E-Uttaranchal

  
1387 views
Apr 17 2017 (21:24)
mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Re# 2237138-64            Tags   Past Edits
NV Casserole Meal @130
and its my fav from past 10-11 years...
missed this NV meal of KV Express....yummy..!!

  
1097 views
Apr 18 2017 (06:27)
mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Re# 2237138-65            Tags   Past Edits
SWPR/Sewapuri 5 km<-->1 km CHH/Chaukhandi: 2h 37m late
good morning guys.... about to reach destination stopped at chaukhandi for suregnal clearance

  
1036 views
Apr 18 2017 (07:34)
mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Re# 2237138-66            Tags   Past Edits
TRIP HAS ENDED.
sorry forgot to end it...
reached varanasi @6:41
reached BHU Campus.....
bye folks...pics will be uploaded later....!!!!
😊😊😊😊

  
1037 views
Apr 18 2017 (07:35)
mr wayne ®©~   1765 blog posts   124 correct pred (77% accurate)
Re# 2237138-67            Tags   Past Edits
thanks everyone for wishes....!!!!
  
Travel Question
0 Followers
1639 views
Mar 31 2017 (10:39)   14257/Kashi Vishwanath Express | BE/Bareilly Junction (4 PFs)

Going to travel in Nzm Durg HumSafar on 26 April^~   33093 blog posts   25878 correct pred (77% accurate)
Entry# 2216865            Tags   Past Edits
DOJ 3/04/2017
Kashi Vishwanath Express from Bareilly to New Delhi
In Sleeper with RLWL28
Cnf chances?

  
1419 views
Mar 31 2017 (10:48)
Going to travel in Nzm Durg HumSafar on 26 April^~   33093 blog posts   25878 correct pred (77% accurate)
Re# 2216865-2            Tags   Past Edits
Anyone

  
1399 views
Mar 31 2017 (11:02)
GKP LKO Section 120kmph Sucessful Trail Done~   3095 blog posts   5 correct pred (100% accurate)
Re# 2216865-3            Tags   Past Edits
muskil hai meri 3Ac ki 4 remote location waiting clear nahi hua tha porabiya exp me BE to Gkp

  
1448 views
Mar 31 2017 (11:04)
★When Journey matters more than the Destination★^~   5213 blog posts   12 correct pred (100% accurate)
Re# 2216865-4            Tags   Past Edits
Tough Chances. . . Check the history /pnr

  
1397 views
Mar 31 2017 (11:05)
IR no more Safe^~   20854 blog posts   96001 correct pred (75% accurate)
Re# 2216865-5            Tags   Past Edits
na ho paye.
tatkal try karo.
  
Predictions: 10
confirm: 9
rac: 0
wl: 1
Journey: Mon Mar 27, 2017 @ 21:50
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 20   |   Charting: < 17:45
Travel: LKO/Lucknow Charbagh NR   to   BSB/Varanasi Junction   |   301 km / 792 km
14258/Kashi Vishwanath Express (PT)
Entry# 2211698

Posted by: Amit Singh   67 blog posts   1260 correct pred (85% accurate)
PNR: 255-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 26 2017 (18:35)
Passenger 1: Waitlist# 17 (Booking Status: W/L 18,RLGN)
Total Fare:  345
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 27 2017 (07:02)
Passenger 1: B1,17 [LB] (Booking Status: W/L 18,RLGN)
Total Fare:  345
Chart NOT Prepared

Full PNR Status History (3 statuses)
Status as of: Mar 27 2017 (07:02)
Passenger 1: B1,17 [LB] (Booking Status: W/L 18,RLGN)
Total Fare:  345
Chart NOT Prepared

Status as of: Mar 26 2017 (21:37)
Passenger 1: Waitlist# 16 (Booking Status: W/L 18,RLGN)
Total Fare:  345
Chart NOT Prepared

Status as of: Mar 26 2017 (18:38)
Passenger 1: Waitlist# 17 (Booking Status: W/L 18,RLGN)
Total Fare:  345
Chart NOT Prepared


  
1336 views
Mar 26 2017 (20:30)
Amit Singh   67 blog posts   1260 correct pred (85% accurate)
Re# 2211698-1            Tags   Past Edits
Ck available 41
  
Rail Fanning
0 Followers
1442 views
Mar 19 2017 (20:35)   14258/Kashi Vishwanath Express (PT)

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   12923 blog posts   3042 correct pred (65% accurate)
Entry# 2203275            Tags   Past Edits
  
Site-Related
0 Followers
2508 views
Apr 09 2016 (18:41)   14258/Kashi Vishwanath Express (PT)
 

Trip in 12275 soon^~   9058 blog posts   421 correct pred (74% accurate)
Entry# 1796687            Tags   Past Edits
1 compliments
Hahahahahahahahahahahahahahahaha!☺
Trip from 1970... OMG!!
  
Predictions: 6
confirm: 5
rac: 0
wl: 1
Journey: Thu Mar 23, 2017 @ 20:45
Class: Sleeper - SL   |   Tot Seats: Avbl 86   |   Charting: < 16:45
Travel: LKO/Lucknow Charbagh NR   to   NDLS/New Delhi   |   491 km / 792 km
14257/Kashi Vishwanath Express
Entry# 2203881

PNR: 281-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 20 2017 (14:02)
Passenger 1: Waitlist# 22 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.
Posted thru RailCal

Latest Status as of: Mar 23 2017 (23:38)
Passenger 1: RS10 47/Coach Position:19 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart PREPARED

Full PNR Status History (32 statuses)
Status as of: Mar 23 2017 (11:00)
Passenger 1: RS10 47/Coach Position:19 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart PREPARED

Status as of: Mar 23 2017 (10:56)
Passenger 1: RS10 47/Coach Position:19 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart PREPARED

Status as of: Mar 23 2017 (10:37)
Passenger 1: RS10 47/Coach Position:19 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart PREPARED

Status as of: Mar 23 2017 (10:36)
Passenger 1: RS10 47/Coach Position:19 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart PREPARED

Status as of: Mar 23 2017 (08:34)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (08:31)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (08:20)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (05:58)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (05:56)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (03:57)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (03:56)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (03:45)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (01:05)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 23 2017 (00:55)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (17:34)
Passenger 1: Waitlist# 3 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (15:30)
Passenger 1: Waitlist# 4 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (14:25)
Passenger 1: Waitlist# 6 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (11:24)
Passenger 1: Waitlist# 7 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (09:11)
Passenger 1: Waitlist# 9 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (08:53)
Passenger 1: Waitlist# 10 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (07:51)
Passenger 1: Waitlist# 11 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 22 2017 (03:48)
Passenger 1: Waitlist# 11 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (21:36)
Passenger 1: Waitlist# 11 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (17:26)
Passenger 1: Waitlist# 15 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (14:10)
Passenger 1: Waitlist# 16 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (09:46)
Passenger 1: Waitlist# 20 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (08:43)
Passenger 1: Waitlist# 21 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (05:40)
Passenger 1: Waitlist# 21 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (05:26)
Passenger 1: Waitlist# 21 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 21 2017 (03:55)
Passenger 1: Waitlist# 21 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 20 2017 (14:28)
Passenger 1: Waitlist# 21 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared

Status as of: Mar 20 2017 (14:01)
Passenger 1: Waitlist# 22 (Booking Status: W/L 39,GNWL)
Total Fare:  310
Chart NOT Prepared


  
1290 views
Mar 23 2017 (06:24)
rdb*^   31068 blog posts   368391 correct pred (80% accurate)
Re# 2203881-1            Tags   Past Edits
SE1 is there or not?
  
Predictions: 16
confirm: 6
rac: 10
wl: 0
Journey: Sun Mar 19, 2017 @ 15:13
Class: Sleeper - SL   |   Tot Seats: Avbl 72   |   Charting: < 07:30
Travel: MB/Moradabad Junction   to   BSB/Varanasi Junction   |   627 km / 792 km
14258/Kashi Vishwanath Express (PT)
Entry# 2201986

Posted by: Gaya Jn🚅🚄~   1799 blog posts   13 correct pred (82% accurate)
PNR: 265-xxxxxxx    |   Similar PNRs
Posted Status as of: Mar 18 2017 (16:41)
Passenger 1: RAC 62 (Booking Status: RAC 74,GNWL)
Total Fare:  400
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 19 2017 (06:59)
Passenger 1: S11,17 [LB] (Booking Status: RAC 74,GNWL)
Total Fare:  400
Chart PREPARED

Full PNR Status History (3 statuses)
Status as of: Mar 19 2017 (06:59)
Passenger 1: S11,17 [LB] (Booking Status: RAC 74,GNWL)
Total Fare:  400
Chart PREPARED

Status as of: Mar 18 2017 (22:06)
Passenger 1: RAC 61 (Booking Status: RAC 74,GNWL)
Total Fare:  400
Chart NOT Prepared

Status as of: Mar 18 2017 (16:41)
Passenger 1: RAC 62 (Booking Status: RAC 74,GNWL)
Total Fare:  400
Chart NOT Prepared


  
2158 views
Mar 18 2017 (16:42)
Gaya Jn🚅🚄~   1799 blog posts   13 correct pred (82% accurate)
Re# 2201986-1            Tags   Past Edits
Ye tho cnf ho jana chaiye....:)

  
2164 views
Mar 18 2017 (22:08)
Durg Humsafar Coming Soon🙆~   498 blog posts   19247 correct pred (89% accurate)
Re# 2201986-2            Tags   Past Edits
Ho jayega!

  
Mar 18 2017 (23:23)
adityak888ak   7 blog posts   666 correct pred (73% accurate)
Re# 2201986-3            Tags   Past Edits
100℅ CNF
TQ 48 & PT 19 AVL

  
1928 views
Mar 19 2017 (07:21)
Gaya Jn🚅🚄~   1799 blog posts   13 correct pred (82% accurate)
Re# 2201986-4            Tags   Past Edits
Ho Gaya bhai...Thanks
Page#    767 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site