Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Wed Apr 24 18:14:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

14707/Ranakpur Express (PT)
राणकपुर एक्सप्रेस

ADI/Ahmedabad Junction --> ANND/Anand Junction

Latest News
(You need to double-check/verify this info yourself)
🔹गाडी संख्या 14707/14708, बीकानेर- दादर-बीकानेर रेलसेवा में बीकानेर से दिनांक 01.08.23 से 31.08.23 तक एवं दादर से दिनांक 02.08.23 से 01.09.23 तक 03 द्वितीय शयनयान श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Sun Jul 30, 2023 (05:48AM)
News History
🔹Train No. 14708/14707 Dadar – Bikaner augmented with o­ne additional AC 3-Tier coach and three Sleeper Class coaches. Ex Dadar from 2nd March,to 1st April 2023 and Ex Bikaner from 1st March to 31st March, 2023.
Tue Feb 28, 2023 (07:58PM)
गाडी संख्या 14707 / 14708, बीकानेर-दादर-बीकानेर रेलसेवा में बीकानेर से दिनांक 01. 02.23 से 28.02.23 तक एवं दादर से दिनांक 02.02.23 से 01.03.23 तक 01 थर्ड एसी व 02 द्वितीय शयनयान श्रेणी डिब्बो की अस्थाई बढोतरी की जा रही है।
Mon Jan 30, 2023 (03:36PM)
गाड़ी संख्या 14707, बीकानेर-दादर रेलसेवा दिनांक 02.01.23 को बीकानेर से प्रस्थान करने वाली परिवर्तित मार्ग लूणी- भीलडी - पाटन - मेहसाना होकर संचालित की जाएगी।
Mon Jan 02, 2023 (12:15PM)
गाड़ी संख्या 14707, बीकानेर-दादर रेलसेवा दिनांक 02.01.23 को बीकानेर से प्रस्थान करने वाली परिवर्तित मार्ग नूनी-श्रीमही पाटन मेहसाना होकर संचालित की जाएगी।
Mon Jan 02, 2023 (09:34AM)
गाडी संख्या 14707 / 14708, बीकानेर-दादर-बीकानेर रेलसेवा में बीकानेर से दिनांक 01.08.22 से 31.08.22 तक एवं दादर से दिनांक 02.08.22 से 01.09.22 तक 01 थर्ड एसी व 04 द्वितीय शयनयान श्रेणी डिब्बो की अस्थाई बढोतरी की जा रही है।
Fri Jul 29, 2022 (03:56PM)
गाडी संख्या 14707 / 14708, बीकानेर - दादर - बीकानेर रेलसेवा में बीकानेर से दिनांक - 11.06.22 से 14.06.22 तक एवं दादर से दिनांक 12.06.22 से 15.06.22 तक 01 द्वितीय शयनयान श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Sat Jun 11, 2022 (11:55AM)
गाडी संख्या 20971/20972, उदयपुर सिटी-शालीमार- उदयपुर सिटी रेलसेवा में उदयपुर सिटी से दिनांक 04.06.22 से 25.06.22 तक एवं शालीमार से दिनांक 05.06.22 से 26.06.22 तक 01 द्वितीय साधारण श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Sat May 28, 2022 (10:26PM)
गाडी संख्या 14707 / 14708, बीकानेर-दादर- बीकानेर रेलसेवा में बीकानेर से दिनांक 21.05.22 से 31.05.22 तक एवं दादर से दिनांक 22.05.22 से 01.06.22 तक 01 द्वितीय शयनयान श्रेणी डिब्बे की अस्थाई बढोतरी की जा रही है।
Thu May 19, 2022 (10:51PM)
📢 दिनांक 01.04.2022 से 30.04.2022 तक बीकानेर से 1 तृतीय वातानुकूलित और 4 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Sun Apr 03, 2022 (03:29AM)
📢 दिनांक 01.03.2022 से 31.03.2022 तक बीकानेर से 1 तृतीय वातानुकूलित और 5 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Wed Mar 02, 2022 (03:02AM)
📢 Due to NI work in connection with doubling of Chandisar-Palanpur section of ADI Division, train no. 14707 will be diverted via Jodhpur-Bhildi-Patan-Mahesana on JCO 25.02.2022...
Fri Feb 25, 2022 (03:44AM)
📢 दिनांक 01.02.2022 से 28.02.2022 तक बीकानेर से 1 तृतीय वातानुकूलित और 5 द्वितीय शयनयान श्रेणी के डिब्बों की अस्थायी रूप से बढ़ोतरी की जा रही है।।।
Tue Feb 01, 2022 (03:40AM)
Train No. 14708/14707 Dadar – Bikaner augmented with an additional AC 3-Tier and 5 Sleeper Class coaches with immediate effect. Ex Dadar upto 1st January, 2022 and Ex Bikaner upto 31st December, 2021.
Mon Dec 06, 2021 (05:56AM)
Train Number 04708/04707 Dadar-Bikaner Special to run with an additional AC 3-Tier and two Sleeper Class coaches. The train will run from Dadar from 8 October 2021 to 1 December 2021 (on nominated days) and Bikaner from 7 October 2021 to 30 November 2021.
Mon Oct 11, 2021 (08:48AM)
4 Follows
Bedroll/Linen: AVAILABLE change
Inaugural Run
Sat Aug 15, 1998
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
Updated: Mar 17 (00:34) by Himanshu_372138^~
Dep:
Arr:
RSA - Rake Sharing
No RSA. 3 Dedicated Rakes. PM @BKN
Rating: 4.2/5 (59 votes)
cleanliness - good (11)
punctuality - excellent (11)
food - good (8)
ticket avbl - good (10)
u/r coach - average (8)
railfanning - excellent (9)
safety - good (10)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GN
  3
 GN
  4
 S1
  5
 S2
  6
 S3
  7
 S4
  8
 S5
  9
 S6
 10
 S7
 11
SE1
 12
SE2
 13
SE3
 14
 B1
 15
 B2
 16
 B3
 17
 B4
 18
 A1
 19
 GN
 20
 GN
 21
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    1420 blog entries  next>>
Travelogue
75256 views
12

★★
Feb 26 2022 (18:36)   14708/Ranakpur Express (PT) | BKN/Bikaner Junction (6 PFs)
Mehta_Udit^~
Mehta_Udit^~   20709 blog posts
Entry# 5229232            Tags  
One Last Time before the Electrification And doubling Work gets completed on the Branch Line of North western Railway.

For travelling to Bikaner, as always I booked my ticket in Ranakpur Express, And My Trip started on 4th of Feb from Mumbai in Ranakpur Express and I had around 20 days of stay in Bikaner and Return to Mumbai on 24th of Feb
...
more...

• The Trip to Bikaner
After 6 months was Boarding Ranakpur Express, Left for kandivali station at 11:45 from Home, After Reaching station had to wait for 15 mins as Virar local was sent ahead of Borivali (pf-2) Local this time. After Boarding the Local, Got down at Borivali station and Bgkt – dadar Express was departing from pf-7. Took the escalator and change the Platform. Had to walk down 10 coaches as my Coach was S6. After Reaching near my coach, Gzb wap7 with 12216 Bdts – Dee Garibrath Entered Bvi and Brc wap7 with Double Decker towards MMCT entered Bvi PF-7. And it was Time for GR to departed From Bvi, The lp gave the honk and train started moving and train halted and started honking as Chain pulling was done after resting the coach by staff it again it started moving but after picking up Speed again Cp happened , Meanwhile There was local bunching up on pf:-6, Controller diverted few locals to pf-5 and all locals were diverted to slow line from fast line as GR was stuck and there was a big bunching on UP line, After Resting the coach, Train started to move but again CP in same Coach, Trice Cp was done from The same coach but staff were unable to find the reason behind it . All the Fast locals were diverted to slow line. After 25 mins of Departing and Halting, GR finally cleared the turnout and made line clear. Brc wap7 with Up Tejas Express Entered Bvi and Also Brc wap7 with Bdts – Jsm Express entering Bvi pf-8, All Trains were almost late by 15-20 mins. Vtva 22356 with 14708 Ranakpur Express Entered Bvi pf-6 with a delay of 12 mins. Departed from BVI at 13:13. Picking up speed and Skipped Daishar at speed of 85 kmph speed. Ac Rake was broken in Virar Cs and on 2nd line Siemens Coaches were Mix with Ac Rake. Skipped Virar at 13:41. Pilling work of New Bridge at Vaitarna has started. Skip Vtn at Flat Mps. Land Leveling and Bridge work for Virar – Dahanu Quad Line has picked up speed land has been leveled between Kelve – palghar. Departed from palghar at 14:07. WDFC work has been progressing at a great speed, Track laying machine was at New Vangaon and also Poles were erected. New alignment work Between Vangaon and Dahanu Road has been completed just switch work is left. Skipped Dahanu Road at 14:30 and Vtva wap4 22052 with Drd – Brc was Standing on pf-3. WDFC work in Gujarat State at good speed. Track has been completed and also electric poles have been erected. Reached Vapi at 15:05 (7 mins BT). Wag 9 33335 with bcna on pf:-3 at Vapi. Wdfc Track work and Signaling Work Completed between Vapi – Valsad. Arrived Valsad at 15:33 (10 mins BT) Departed from BL at 15:40. WDFC work fully completed Between Valsad and Navsari. Arrived Navsari at 16:09 (Almost 18 mins BT). No Overtake of suryanagri and Pune – Nzm Duronto yet. Loop At Bhestan 16:30 running almost 25 mins BT as per WTT. After waiting for 15 Bl wap4 mid lamp 22075 with suryanagri overtakes Ranakpur at Bhestan. And after 5 mins Tkd wap7 39075 with pune- Nzm Duronto overtakes Ranakpur at Bhestan. After 21 mins of loop departed from Bhestan. The 3rd line work between Udhana and Surat is at decent speed. Land has been level and bridge work is at final stages. Reached Surat 1 min before time. Tkd wap1 with Ddn – Bdts Express was standing on pf-2. This time the journey Experience was almost different. Train was almost doing MPS in Brc division; Ranakpur was Loop at Lakodra Dethan for Schedule Overtake by 12933 Karnavati Express. After Departing from Brc Train was having a decent run. Ranakpur was Loop at Mahemdavad Kheda Road at 20:45. It was running before time as per WTT. 12931 MMCT – ADI Double decker Express Overtook at Flat 130km/h speed. After waiting for 15 mins 70625+12664/PA 20923 TEN-GIMB Humsafar also overtook us. A 100 kmph restricted train overtakes a 110 kmph train. After both Overtake we Departed. Was doing Flat mps till maninagar. After Crossing Maninagar train started to crawl. 40176, 11527, Vtva twins, 20077 + 40580, 40062 were At KK and 30499, 37032, 30523, Gzb p5, 22818, 30634 were at Adi Electric Trip shed. As we entered 20923 TEN-GIMB Humsafar was departing from Adi. Walked down the 11 coaches to see the loco change. Watching Loco change at ADI will soon be a history. Vtva wap4 was already uncoupled and was waiting for starter signal of switch track and make way for wdp4d. Bgkt wdp4d 40600 was the loco link from ADI. After loco change departed from ADI. Slowly picking up speed. Wr has completed Double line work till Dangarwa, From Dangarwa to palanpur its still single line. Crossed suryanagri at Chappi station. It was getting colder so went up the seat and took a nap.
Woke up and came down the seat, Train was at a halt. Went to the door and saw it was waiting at Jodhpur Outer. Reached Jodhpur at 6:38 am. Vtva Twins with Jammu tavi Express was standing on pf-2. Reached Metra Road 9:11 Delayed by 1 hrs +. My coach was almost empty hardly 10 people were in my coach. Bgkt 40583 with 14707 Ranakpur Express was waiting at nagaur station and now the whole coach was empty and I was left all alone till BKn. Reached Bikaner at 11:55 with a delay of 20 mins. Ldh twins with passenger was standing at Bkn pf-1 and Bgkt Wdp4d 40274 with Bkn - hwh express

Return Journey Blog Soon ....
From Running 2 hrs 45 mins to 5 mins Before time , NI work after Merta Road , Electrification Work after merta and wiring Work after jodhpur … and Many more updates coming in Next Blog soon…


Thanks for Reading ,
Udit Mehta

Translate to English
Translate to Hindi
Imaginary
5110 views
0

Apr 15 (17:34)   IMG14707-2130598/♥♥BIKANER DADAR WESTERN RANAKPUR SUPERFAST EXPRESS♥♥ | DDR/Dadar Western (7 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   71 img trains   0 popular
70 net green flags   2 green per Train
Entry# 6031458            Tags   Past Edits
Custom Ratings
Please rate my imaginary train and also make proposal to change the timings of this train as soon as possible and for further information refer to this blog - 6031428
Translate to English
Translate to Hindi
Imaginary
4707 views
1

Apr 15 (16:52)   IMG14708-2130598/♥♥DADAR WESTERN BIKANER RANAKPUR SUPERFAST EXPRESS♥♥ | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   71 img trains   0 popular
70 net green flags   2 green per Train
Entry# 6031428            Tags   Past Edits
Custom Ratings
Please rate my imaginary train and also make proposal to change the timings of this train as soon as possible and for further information refer to this blog - 6031458
Translate to English
Translate to Hindi
General Travel
9633 views
0

Apr 11 (20:29)   14708/Ranakpur Express (PT)
Mehta_Udit^~
Mehta_Udit^~   20709 blog posts
Entry# 6026898            Tags  
Ranakpur Express Train Board
Translate to English
Translate to Hindi
Poll
1958056 views
133 votes
2

May 27 2016 (19:42)   11077/Jhelum Express (PT) | PUNE/Pune Junction (6 PFs)
 
AmravatiSuperfast~
AmravatiSuperfast~   598 blog posts
Entry# 1867072            Tags   Past Edits
Here is the Zone-wise list of LONGEST ORDINARY DAILY MAIL/EXPRESS (not SF) trains. Which train is BETTER and has a fair/best speed, punctuality, cleanliness, coach condition, ticket availability, catering facilities despite their long journeys. And which zone you feel is better in management of these trains??
Translate to English
Translate to Hindi
NO vote
CR. 11077/8 Pune - Jammu Tawi Jhelum Express (2176 km)
26%
34
ECR. 13351/2 Dhanbad - Alappuzha Express (2537 km)
10%
13
ECoR. 18477/8 Puri - Haridwar Kalinga Utkal Express (2366 km)
2%
2
ER. 13151/2 Kolkata - Jammu Tawi Express (1986 km)
2%
3
NCR. 11123/4 Barauni - Gwalior Mail (1055 km)
3%
4
NER. 15017/8 LTT Mumbai - Gorakhpur Kashi Express (1710 km)
5%
7
NWR. 14707/8 Bikaner - Mumbai Bandra Ranakpur Express (1215 km)
4%
5
NFR. 15909/10 Dibrugarh - Lalgarh Avadh Assam Express (3118 km)
2%
3
NR. 14055/6 Dibrugarh - Old Delhi Brahmaputra Mail (2597 km)
2%
2
SCR. 17229/30 Trivandrum - Hyderabad Deccan Sabari Express (1577 km)
12%
16
SECR. 18237/8 Bilaspur - Amritsar Chhattisgarh Express (2012 km)
8%
11
SER. 18189/90 Tatanagar - Alappuzha Link Express (2362 km)
1%
1
SWR. 16593/94 HS Nanded - KSR Bengaluru Express (1030 km)
0%
0
SR. 16381/2 CST Mumbai - Kanniyakumari Jayanti Janta Express (2130 km)
0%
0
WCR. 11447/8 Jabalpur - Howrah Shaktipunj Express (1144 km)
12%
16
WR. 19023/4 Mumbai - Firozpur Janta Express (1773 km)
0%
0
KR. 10111/2 10103/4 CST Mumbai - Madgaon Konkan Kanya/Mandovi Express (581 km)
12%
16

More Posts
Page#    1420 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy