Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Feb 25, 2017 12:55:17 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Feb 25, 2017 12:55:17 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
Details Edit
Large TB;
Entry# 1661712-0
Details Edit
Large TB;
Entry# 1661712-0
Details Edit
Large TB;
Entry# 1661712-0

15661/Ranchi - Kamakhya Express
রাঁচি - কামাখ্যা এক্সপ্রেস     राँची - कामाख्या एक्सप्रेस

RNC/Ranchi Junction --> KYQ/Kamakhya Junction

Refresh Live Status (not updated)
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✓ E-Catering
Recently added in the IRCTC E-Catering list
Latest News
(You need to double-check/verify this info yourself)
.
Sat Jul 06, 2013 (09:10PM)
Updated: Oct 03 2016 (18:50) by Long leave^~
Change Departure Station:
Change Arrival Station:
RSA - Rake Sharing
No RSA
Rating: 2.5/5 (16 votes)
cleanliness - average (3)
punctuality - average (4)
food - poor (2)
ticket avbl - average (3)
u/r coach - poor (2)
railfanning - average (2)
safety - good (2)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GS
  3
 GS
  4
 GS
  5
 S6
  6
 S5
  7
 S4
  8
 S3
  9
 S2
 10
 S1
 11
 B2
 12
 B1
 13
 A1
 14
 GS
 15
SLR
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Boards    

Train Forum

Page#    176 blog entries  next>>
  
Rail Fanning
0 Followers
1912 views
Dec 08 2016 (10:38)   15662/Kamakhya - Ranchi Express | RNC/Ranchi Junction (6 PFs)

I wish RNC NLP Exp   538 blog posts   10125 correct pred (76% accurate)
Entry# 2083936            Tags   Past Edits
My first proposal agreed & initiated by CRB & RailMinIndia - the RNC 15661 KYQ 15662 RNC Express
crossing NaraNarayan Setu, a Rail+Road Bridge # 355 on River Bramhaputra @ 50.21 River Level with different span sizes
Naranarayan Setu (Assamese: নৰনাৰায়ণ সেতু) (IPA - nɑ:rəˈnərɑ:jənə/nɑ:rəˈnəraɪjənə ˈseɪtu:) is the third bridge to have been constructed over the Brahmaputra River in Assam, India. It is a double-deck bridge with a railway track on the lower deck and a road on the upper deck. It has a length of 2.284 kilometres and connects Jogighopa, a town
...
more...
of Bongaigaon District on the north with Pancharatna, a town of Goalpara District on the south. The bridge was inaugurated on April 15, 1998 by Atal Bihari Vajpayee, the Prime Minister of India at that time. Construction was carried out by the consortium of The Braithwaite Burn and Jessop Construction Company Limited(BBJ).The approximate cost of construction of this bridge is Rs. 301 crore. Courtesy Wikipedia
  
Rail Fanning
0 Followers
1901 views
Dec 07 2016 (18:32)   15662/Kamakhya - Ranchi Express | KYQ/Kamakhya Junction (4 PFs)

I wish RNC NLP Exp   538 blog posts   10125 correct pred (76% accurate)
Entry# 2083478            Tags   Past Edits
My first proposal agreed & initiated by CRB & RailMinIndia - the RNC 15661 KYQ 15662 RNC Express
crossing NaraNarayan Setu, a Rail+Road Bridge # 355 on River Bramhaputra @ 50.21 River Level with different span sizes
Naranarayan Setu (Assamese: নৰনাৰায়ণ সেতু) (IPA - nɑ:rəˈnərɑ:jənə/nɑ:rəˈnəraɪjənə ˈseɪtu:) is the third bridge to have been constructed over the Brahmaputra River in Assam, India. It is a double-deck bridge with a railway track on the lower deck and a road on the upper deck. It has a length of 2.284 kilometres and connects Jogighopa, a town
...
more...
of Bongaigaon District on the north with Pancharatna, a town of Goalpara District on the south. The bridge was inaugurated on April 15, 1998 by Atal Bihari Vajpayee, the Prime Minister of India at that time. Construction was carried out by the consortium of The Braithwaite Burn and Jessop Construction Company Limited(BBJ).The approximate cost of construction of this bridge is Rs. 301 crore. Courtesy Wikipedia

  
1687 views
Dec 08 2016 (07:47)
12817 Jharkhand Swarna Jayanti 12818~   1265 blog posts   43 correct pred (73% accurate)
Re# 2083478-1            Tags   Past Edits
Thats great
  
★★★  General Travel
0 Followers
6185 views
Jun 27 2016 (22:20)   15661/Ranchi - Kamakhya Express | SNT/Sainthia Junction (4 PFs)
 

4πu¶am*^~   5668 blog posts   42281 correct pred (87% accurate)
Entry# 1909330            Tags   Past Edits
My train 15661 Ranchi-Kamakhya Express at Sainthia
Pic 1. Quadruple tracks at Sainthia east outer, two from hwh side, and two on left from Siuri side.
Pic 2. Entering Platform. Note there is no OHE below bridge above tracks.
Pic 3. Some boards on OHE indicating 'raise pantograph'.
Pic
...
more...
4. Howrah end view.
Pic 5. Board on OHE indicating 'Lower pantograph'
Pic 6. West side of sainthia.

5 posts - Mon Jun 27, 2016

16 posts - Tue Jun 28, 2016

  
4678 views
Jun 28 2016 (13:59)
A good day ahead~   2339 blog posts
Re# 1909330-22            Tags   Past Edits
The OHE portion is disconnected. You can see in pic 3 that there is a cable from the OHE wire to the three wires above. After that connection, the OHE wire terminates at the bridge. In pic 4, the OHE wire ( the one that contacts the pantograph) is terminating at the bridge. Basically, on both sides of the bridge, a small portion of the OHE is neutral. And the three wires passing under the bridge sort of bypass the neutral section and connect the OHE on both sides of the bridge.

  
4624 views
Jun 28 2016 (15:01)
Vinay Kumar~   15471 blog posts   361 correct pred (78% accurate)
Re# 1909330-23            Tags   Past Edits
Yes, its not gonna raise cz if it has to, it would hav gt done b4 electrification, as FOB crosses complete Junction, nt just PF!!
The series whch pass-thru direct below bridge is the one kept AC flow live, while Bridge attachment is to offer wire alignment @ mid for the side wires to take over later on!!
I guess, the Jn will b kept @ PSR & pass-thru train will surely lower the panto while enter station premise n will raise whn cross premise (starter)..while stoppage train will lower the same while
...
more...
entering station premise, as mostly Loco applies brake to adjust speed to retain stoppage @ proper point in even gradient & non-heavy junction points!! Stopping freight may would work like lower back panto n raise front, with quite less speed or stop even!!

  
4588 views
Jun 28 2016 (15:32)
4πu¶am*^~   5668 blog posts   42281 correct pred (87% accurate)
Re# 1909330-24            Tags   Past Edits
That's what I said from the beginning. :)
BTW that's ROB & not station FOB.

  
4580 views
Jun 28 2016 (15:36)
4πu¶am*^~   5668 blog posts   42281 correct pred (87% accurate)
Re# 1909330-25            Tags   Past Edits
I don't think its neutral at any point, as in pic 4, the wires are alligned to the bridge, with the help of an insulator,

  
4487 views
Jun 28 2016 (17:17)
A good day ahead~   2339 blog posts
Re# 1909330-26            Tags   Past Edits
In pic 3, you can see that just before the OHE pole with the 'Rise Pantograph' sign, there are a few criss-cross connections on the catenary. Usually such connections are done just before neutral or dead sections where the subsequent section of wire is insulated from the previous section.( In pic 5, you can see this from the other side). The OHE carries power till this pole, and there, it switches to the 3 cables to go to the other side of the bridge. The short section from this OHE pole till the bridge is insulated and separated from the remaining part. It is present to give mechanical continuity to the pantograph.
  
Predictions: 6
confirm: 6
rac: 0
wl: 0
Journey: Tue Jun 28, 2016 @ 21:10
Class: Sleeper - SL   |   Tot Seats: Avbl >54
Travel: SGUJ/Siliguri Junction   to   DHN/Dhanbad Junction   |   585 km / 1197 km
15662/Kamakhya - Ranchi Express
Entry# 1871825

PNR: 655-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: May 30 2016 (19:01)
Passenger 1: Waitlist# 5 (Booking Status: W/L 12,GNWL)
Total Fare:  410
Chart NOT Prepared
KOJ kokrajhar se quota
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 27 2016 (23:04)
Passenger 1: SE1,38 [UB] (Booking Status: W/L 12,GNWL)
Total Fare:  410
Chart PREPARED

Full PNR Status History (5 statuses)
Status as of: Jun 27 2016 (19:55)
Passenger 1: SE1,38 [UB] (Booking Status: W/L 12,GNWL)
Total Fare:  410
Chart PREPARED

Status as of: Jun 27 2016 (13:09)
Passenger 1: RAC 48 (Booking Status: W/L 12,GNWL)
Total Fare:  410
Chart NOT Prepared

Status as of: Jun 25 2016 (10:35)
Passenger 1: RAC 51 (Booking Status: W/L 12,GNWL)
Total Fare:  410
Chart NOT Prepared

Status as of: Jun 07 2016 (18:30)
Passenger 1: RAC 72 (Booking Status: W/L 12,GNWL)
Total Fare:  410
Chart NOT Prepared

Status as of: May 30 2016 (19:00)
Passenger 1: Waitlist# 5 (Booking Status: W/L 12,GNWL)
Total Fare:  410
Chart NOT Prepared


  
3320 views
Jun 27 2016 (23:03)
डस्टर द राॅयल^~   829 blog posts   38355 correct pred (84% accurate)
Re# 1871825-1            Tags   Past Edits
  
★  General Travel
0 Followers
4599 views
Jun 24 2016 (08:12)   15661/Ranchi - Kamakhya Express | MLV/Mallarpur (3 PFs)
 

4πu¶am*^~   5668 blog posts   42281 correct pred (87% accurate)
Entry# 1905273            Tags   Past Edits
Progress of third line work on Sainthia-Nalhati route.
Pic 1. Just after departing Sainthia, mighty Saraighat crosses us with identifiable EMD link. You can spot OHE poles roughly erected with no tracks beneath.
Pic 2. When nearing Gadadharpur, I spotted that most of the small bridges & LCs work is completed except only a few still pending.
Pic 3 & 4. When we crossed
...
more...
Gadadharpur, we saw the work was almost complete for that part till Mallarpur, when an unknown Intercity train crossed us.
If you need some more info about third line work progress on this section, then feel free to ask me, I will try to answer it.

  
4423 views
Jun 24 2016 (10:10)
Katni Grade Separator~   1735 blog posts   3539 correct pred (85% accurate)
Re# 1905273-1            Tags   Past Edits
The UDL-Siuri electrified line has been opened till now ?

  
4401 views
Jun 24 2016 (12:13)
4πu¶am*^~   5668 blog posts   42281 correct pred (87% accurate)
Re# 1905273-3            Tags   Past Edits
Opened in which sense ?
If you mean electric locomotives plying, then NO.
  
General Travel
0 Followers
3733 views
Jun 21 2016 (12:33)   15662/Kamakhya - Ranchi Express | KYQ/Kamakhya Junction (4 PFs)
 

I wish RNC NLP Exp   538 blog posts   10125 correct pred (76% accurate)
Entry# 1902342            Tags   Past Edits
15662 KYQ RNC EXP -Not yet started but in this site (Live Status) it has already crossed CGON. How is it possible?!?
  
Predictions: 10
confirm: 2
rac: 0
wl: 8
Journey: Sun Jun 05, 2016 @ 20:40
Class: AC 3-tier - 3A   |   Tot Seats: Avbl 61   |   Charting: < 18:00
Travel: RNC/Ranchi Junction   to   NJP/New Jalpaiguri Junction   |   744 km / 1197 km
15661/Ranchi - Kamakhya Express
Entry# 1880487

PNR: 625-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Jun 05 2016 (08:07)
Passenger 1: Waitlist# 6 (Booking Status: W/L 13,CK)
Passenger 2: Waitlist# 7 (Booking Status: W/L 14,CK)
Total Fare:  2700
Chart NOT Prepared
3AC
Tatkal
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 05 2016 (15:58)
Passenger 1: BE1,7 [SL] (Booking Status: W/L 13,CK)
Passenger 2: BE1,53 [MB] (Booking Status: W/L 14,CK)
Total Fare:  2700
Chart PREPARED

Full PNR Status History (3 statuses)
Status as of: Jun 05 2016 (15:57)
Passenger 1: BE1,7 [SL] (Booking Status: W/L 13,CK)
Passenger 2: BE1,53 [MB] (Booking Status: W/L 14,CK)
Total Fare:  2700
Chart PREPARED

Status as of: Jun 05 2016 (13:29)
Passenger 1: Confirmed (Booking Status: W/L 13,CK)
Passenger 2: Waitlist# 1 (Booking Status: W/L 14,CK)
Total Fare:  2700
Chart NOT Prepared

Status as of: Jun 05 2016 (08:07)
Passenger 1: Waitlist# 6 (Booking Status: W/L 13,CK)
Passenger 2: Waitlist# 7 (Booking Status: W/L 14,CK)
Total Fare:  2700
Chart NOT Prepared


  
3858 views
Jun 05 2016 (17:46)
rdb*^   30576 blog posts   359804 correct pred (80% accurate)
Re# 1880487-1            Tags   Past Edits
  
General Travel
0 Followers
3925 views
Jun 04 2016 (13:05)   15662/Kamakhya - Ranchi Express | KYQ/Kamakhya Junction (4 PFs)
 

I wish RNC NLP Exp   538 blog posts   10125 correct pred (76% accurate)
Entry# 1879415            Tags   Past Edits
Is there any information of extra coaches (AC & SL) added with 15661 / 15662?
  
Info Update
0 Followers
6568 views
May 07 2016 (02:35)   13053/Howrah - Siuri Intercity Express | KNRI/Kunuri (4 PFs)
 

Vaibhav Agarwal*^   6114 blog posts   2568 correct pred (95% accurate)
Entry# 1836003            Tags   Past Edits
Traffic and Power block between Kunuri - Sainthia for placement of RCC boxes and slabs for LHSon 8/5/16
  
Predictions: 0
confirm: 0
rac: 0
wl: 0
Journey: Sun Apr 24, 2016 @ 20:40
Class: Sleeper - SL   |   Tot Seats: Avbl 213   |   Charting: < 18:00
Travel: RNC/Ranchi Junction   to   MLDT/Malda Town   |   508 km / 1197 km
15661/Ranchi - Kamakhya Express
Entry# 1822014

PNR: 665-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Apr 27 2016 (07:41)
Passenger 1: SE1,63 [SL] (Bo oking Status: W/L 66,GNWL)
Total Fare:  300
Chart PREPARED
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 27 2016 (07:41)
Passenger 1: SE1,63 [SL] (Booking Status: W/L 66,GNWL)
Total Fare:  300
Chart PREPARED

  
3826 views
Apr 27 2016 (07:43)
Soumitra Chawathe*^~   30224 blog posts   98197 correct pred (72% accurate)
Re# 1822014-1            Tags   Past Edits
Page#    176 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site