Disclaimer   
Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Apr 24, 2017 11:14:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Apr 24, 2017 11:14:30 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train PicAdvanced Search
Details Edit
Large TB;
Entry# 1326199-0

17618/Tapovan Express
तपोवन एक्सप्रेस     तपोवन एक्सप्रेस

NED/Hazur Sahib Nanded --> CSTM/Mumbai Chhatrapati Shivaji Terminus

Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✕ E-Catering
Latest News
(You need to double-check/verify this info yourself)
1st coach is SLRD with UR compartment is reserved for RMS & last coach is SLR with UR compartment is reserved for ladies. Augmented with...
more...
one AC Chair Car Coach (CE1) from 1st march to 31st may 2017; attached between C1 & D1.
Fri Mar 17, 2017 (01:40PM)
Updated: Mar 05 2017 (00:35) by system
Change Departure Station:
Change Arrival Station:
RSA - Rake Sharing
17617/17618/ 17687/ 17688 has RSA.
Rating: 3.8/5 (36 votes)
cleanliness - good (6)
punctuality - good (6)
food - good (6)
ticket avbl - good (6)
u/r coach - average (4)
railfanning - good (6)
safety - good (6)
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 UR
  3
 UR
  4
 C1
  5
 D1
  6
 D2
  7
 PC
  8
 D3
  9
 D4
 10
 D5
 11
 D6
 12
 D7
 13
 D8
 14
 D9
 15
D10
 16
 UR
 17
SLR
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Pics    

Train Forum

Page#    449 blog entries  next>>
  
Predictions: 8
confirm: 8
rac: 0
wl: 0
Journey: Fri Apr 21, 2017 @ 09:50
Class: Chair Car - CC   |   Tot Seats: Avbl 52
Travel: NK/Nasik Road   to   AWB/Aurangabad   |   186 km / 606 km
17617/Tapovan Express
Entry# 2241815

Posted by: JGT~   494 blog posts   3116 correct pred (80% accurate)
PNR: 875-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Apr 19 2017 (13:04)
Passenger 1: Waitlist# 34 (Booking Status: W/L 52,GNWL)
Passenger 2: Waitlist# 35 (Booking Status: W/L 53,GNWL)
Total Fare:  650
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 20 2017 (21:35)
Passenger 1: C1,7 [AS] (Booking Status: W/L 52,GNWL)
Passenger 2: CE1,24 [MS] (Booking Status: W/L 53,GNWL)
Total Fare:  650
Chart PREPARED

Full PNR Status History (5 statuses)
Status as of: Apr 20 2017 (21:35)
Passenger 1: C1,7 [AS] (Booking Status: W/L 52,GNWL)
Passenger 2: CE1,24 [MS] (Booking Status: W/L 53,GNWL)
Total Fare:  650
Chart PREPARED

Status as of: Apr 20 2017 (20:26)
Passenger 1: Waitlist# 27 (Booking Status: W/L 52,GNWL)
Passenger 2: Waitlist# 28 (Booking Status: W/L 53,GNWL)
Total Fare:  650
Chart NOT Prepared

Status as of: Apr 20 2017 (10:50)
Passenger 1: Waitlist# 31 (Booking Status: W/L 52,GNWL)
Passenger 2: Waitlist# 32 (Booking Status: W/L 53,GNWL)
Total Fare:  650
Chart NOT Prepared

Status as of: Apr 20 2017 (08:12)
Passenger 1: Waitlist# 33 (Booking Status: W/L 52,GNWL)
Passenger 2: Waitlist# 34 (Booking Status: W/L 53,GNWL)
Total Fare:  650
Chart NOT Prepared

Status as of: Apr 19 2017 (13:04)
Passenger 1: Waitlist# 34 (Booking Status: W/L 52,GNWL)
Passenger 2: Waitlist# 35 (Booking Status: W/L 53,GNWL)
Total Fare:  650
Chart NOT Prepared


  
248 views
Apr 20 2017 (21:35)
SRG*^~   35394 blog posts   163155 correct pred (76% accurate)
Re# 2241815-1            Tags   Past Edits
  
Predictions: 4
confirm: 1
rac: 0
wl: 3
Journey: Sun Apr 16, 2017 @ 11:15
Class: 2nd Sitting - 2S   |   Tot Seats: Avbl 851
Travel: MMR/Manmad Junction   to   PBN/Parbhani Junction   |   291 km / 606 km
17617/Tapovan Express
Entry# 2236555

Posted by: JGT~   494 blog posts   3116 correct pred (80% accurate)
PNR: 841-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Apr 15 2017 (13:48)
Passenger 1: Waitlist# 262 (Booking Status: W/L 359,GNWL)
Total Fare:  115
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Apr 15 2017 (21:04)
Passenger 1: D2,31 [WS] (Booking Status: W/L 359,GNWL)
Total Fare:  115
Chart PREPARED

Full PNR Status History (3 statuses)
Status as of: Apr 15 2017 (21:04)
Passenger 1: D2,31 [WS] (Booking Status: W/L 359,GNWL)
Total Fare:  115
Chart PREPARED

Status as of: Apr 15 2017 (16:16)
Passenger 1: Waitlist# 255 (Booking Status: W/L 359,GNWL)
Total Fare:  115
Chart NOT Prepared

Status as of: Apr 15 2017 (13:48)
Passenger 1: Waitlist# 262 (Booking Status: W/L 359,GNWL)
Total Fare:  115
Chart NOT Prepared


  
405 views
Apr 15 2017 (21:05)
जय हो ™^~   11810 blog posts   113679 correct pred (75% accurate)
Re# 2236555-1            Tags   Past Edits
How many extras are there?
  
General Travel
0 Followers
504 views
Apr 10 2017 (09:46)   17617/Tapovan Express

BJ~   2111 blog posts
Entry# 2229147            Tags   Past Edits
Aaj mumbai se chutney wali gaadi me CE1 coach bhi hai aage se 4th position CE1 5th position C1 and then D 10 onwards

  
490 views
Apr 10 2017 (09:52)
BJ~   2111 blog posts
Re# 2229147-1            Tags   Past Edits
Aur is gaadi ka rake sharing marathwada express se hai...train board laga hua hau
  
★  General Travel
1 Followers
10999 views
Jan 22 2017 (07:58)   17617/Tapovan Express | AWB/Aurangabad (5 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Entry# 2135504            Tags   Past Edits

29 posts - Fri Jan 27, 2017

  
6510 views
Jan 27 2017 (13:54)
108 years of Electric operations on IR~   2512 blog posts
Re# 2135504-30            Tags   Past Edits
Part of the problem with SCR is that they prefer ease of operations than connectivity ( not in a discriminatory way, but it ends up having the same effect). All their choice of starting points for trains are either terminal stations like COA,MTM, NS or major cities like SC/BZA/TPTY etc. Because of this, many major places like HX/ATP/OGL/AWB/NLR end up depending on passing trains and do not have any originating traffic.
While it is definitely a good idea to start trains in this manner, in most areas this is becoming a problem because, other than the Godavari and Krishna districts, the other areas in SCR have no terminal stations and many of the important places are
...
more...
just passing stations ( not even major junctions). This is leading to the idea back-firing a lot and SCR has no answer right away as it has followed the same development strategy from the time of it's formation and they are unwilling to adapt to a different style of operations.
But SCR is a decent zone. It has the usual problems at the border regions, but they are not very ugly or discriminatory and the problems are mostly due to laziness in operations and a resistance to change. A dynamic leadership and the correct political pressure can help set things on the right path for SCR.

  
6487 views
Jan 27 2017 (13:56)
108 years of Electric operations on IR~   2512 blog posts
Re# 2135504-31            Tags   Past Edits
But then, wasn't CR handling the portions I mentioned earlier? Is it that, instead of splitting the entire work into two portions, they just combined it under one project and put it under one of the two zones involved?

  
6794 views
Jan 27 2017 (13:56)
Venkat వెంకట్   2741 blog posts
Re# 2135504-32            Tags   Past Edits
total project is under SCR as its decided decades back. Its SCR responsibility to complete the Doubling and electrification untill DD. SCR done its job quicker in its area.
There are many SCR project running at snail pace. Nizamabad to Karimanagar to Peddapalli project is couple of decades old not completed.
Just 50 km single line project Jagayyapeta to Vishnupuram which is pending from past 10 years in SCR.
Nadyal
...
more...
- Yerraguntla project takes several decades
Gadwal - Raichur also many years its taken. Even after opening not used effectively.
EVery zone has positives and negatives.

  
6472 views
Jan 27 2017 (13:59)
Venkat వెంకట్   2741 blog posts
Re# 2135504-33            Tags   Past Edits
zonal railways wont handle projects, they contract to some agency. Zones are responsible for review and fund generation majorly.
This total project is given to SCR at the time formation i think. As its a big project SCR funding became major problem

  
Mar 05 2017 (09:19)
Rizwan NZB Jn~   263 blog posts   1 correct pred (50% accurate)
Re# 2135504-34            Tags   Past Edits
NZB-PDPL via KRMR is ready for operations now.
  
General Travel
1 Followers
6492 views
Jan 21 2017 (07:57)   17623/Hazur Sahib Nanded - Bikaner Weekly Express | HNL/Hingoli Deccan (2 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Entry# 2134515            Tags   Past Edits
Extra coaches in TAPOVAN,BIKANER,SHIRDI,Express

  
6110 views
Jan 21 2017 (09:21)
AurngabadPurnaAkolaNagpur~   665 blog posts   1 correct pred (20% accurate)
Re# 2134515-1            Tags   Past Edits
तपोवन में स्थायी रूप से ऐसी चेयर कर का डब्बा बढ़ाना चाहिए

  
6128 views
Jan 21 2017 (10:50)
🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Re# 2134515-2            Tags   Past Edits
Aurangabad-Nagpur Daily S.F.Intercity exp chalana chahiye via,Purna-Akola

  
5860 views
Jan 22 2017 (09:48)
AurngabadPurnaAkolaNagpur~   665 blog posts   1 correct pred (20% accurate)
Re# 2134515-3            Tags   Past Edits
में तो इस बारे पचासों ट्विट किया हु ,आप भ अपने एरिया के पत्रकार/नेता को इस बारे में जागरूक करो
  
General Travel
0 Followers
4078 views
Jan 04 2017 (20:50)   17617/Tapovan Express | HNL/Hingoli Deccan (2 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Entry# 2116190            Tags   Past Edits
HNL/Hingoli
  
★★  General Travel
0 Followers
12354 views
Dec 13 2016 (13:35)   17057/Devagiri Express (PT) | PBN/Parbhani Junction (3 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Entry# 2089618            Tags   Past Edits
Images of Parbhani-Mudkhed doubling

5 posts - Wed Dec 14, 2016

  
10586 views
Dec 14 2016 (13:50)
Rizwan NZB Jn~   263 blog posts   1 correct pred (50% accurate)
Re# 2089618-6            Tags   Past Edits
When do you think new line would be ready for use ?

  
10346 views
Dec 15 2016 (18:56)
Mazi IRI   672 blog posts
Re# 2089618-7            Tags   Past Edits
good news....

  
9916 views
Dec 20 2016 (12:22)
🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Re# 2089618-8            Tags   Past Edits
#doubling of PBN/Parbhani-MUE/Mudkhed section

  
9170 views
Dec 23 2016 (22:17)
Ruchir Sharma~   681 blog posts   1 correct pred (100% accurate)
Re# 2089618-9            Tags   Past Edits
Nice pics. Timely gauge conversion of Mhow-Khandwa-Akola will lead to this useful Ratlam-Akola-Kacheguda route. It will be a boon for North-South trains, along with Jabalpur-Gondia conversion....

  
Jan 04 2017 (09:05)
kmukya   44 blog posts
Re# 2089618-10            Tags   Past Edits
As per M K sinha, parbhani mirkhel section would open in tHis month
  
General Travel
0 Followers
9272 views
Dec 04 2016 (08:15)   11401/Nandigram Express | PBN/Parbhani Junction (3 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Entry# 2079796            Tags   Past Edits
दिल्ली के जंतर मंतर मैदाण पर २ दिवसीय धरना आंदोलन ।
  
General Travel
0 Followers
4343 views
Dec 03 2016 (07:54)   17617/Tapovan Express | AWB/Aurangabad (5 PFs)

🚂अलविदा खंडवा मिटरगेज🙋🙋~   628 blog posts
Entry# 2078865            Tags   Past Edits
Aurangabad News
  
Rail Fanning
0 Followers
4196 views
Nov 23 2016 (08:53)   17618/Tapovan Express | ODHA/Odha (2 PFs)

PixelTrailzDotCom*^~   1747 blog posts   51 correct pred (78% accurate)
Entry# 2068515            Tags   Past Edits
Mobile Users : click here
.
Mumbai bound Tapovan express from Aurangabad rips through Odha. The run from Manmad to Nasik was an absolute ripper.
.
Please subscribe for more videos : click here
Page#    449 blog entries  next>>

Scroll to Top
Scroll to Bottom


Go to Mobile site