Disclaimer   
PNR Super Search
 ♦ 
×
HashTag:
PNR Number:
Train Type:
Train:
From Station:
To Station:
Train Class:
2SSLCCEx3AFC2A1A3E
WL Quota:
DOJ From:
DOJ To:
Blogger:
Traveller:
Predictor:
Prediction:
WLRACConf
Stamper:
Final:
WLRACConfVoidQ-ConfUnStamped
Status:
Reaction:

Search
  Go  
 
Sun Jun 26, 2016 15:29:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jun 26, 2016 15:29:51 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipModify Search
Refresh Live Status (not updated)
Train Board
Latest...
.
Sun Jan 10, 2016 (07:48PM)

84370⇒14370-Slip/Bareilly - Barwadih Triveni Link Express
     बरेली-बरवाडीह त्रिवेणी लिंक एक्सप्रेस

Time-Table HAS CHANGED. Show Changes
Updated: Jan 10 2016 (7:46PM) by Vaibhav Agarwal*^
Change Departure Station:
Change Arrival Station:
RSA - Rake Sharing
Loco
PTRU WDM-3A
Rating: /5 (0 votes)
cleanliness - n/a (0)
punctuality - n/a (0)
food - n/a (0)
ticket avbl - n/a (0)
u/r coach - n/a (0)
railfanning - n/a (0)
safety - n/a (0)
Pantry/Catering
✕ Pantry Car
✓ On-board Catering
✕ E-Catering
ICF Rake
  0
 GS
  1
SLR
  2
 S6
  3
 S5
 ALD
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Boards    

PNR Analysis

Top Predictors for this Train: Sabyasachi*^~ ★★★ 4/100%,     Md Tabrez Alam*^ 4/66%,     *^~ ★★★ 3/100%,     Dipyaman Basu*^~ 3/60%,     Rang De Basanti*^ 3/60%,    

Page#    Showing 1 to 7 of 7 PNR entries  
Predictions: 9
confirm: 8
rac: 1
wl: 0
Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Journey: Mon Mar 21, 2016 @ 16:10
Class: Sleeper - SL
Travel: LKO/Lucknow Charbagh NR   to   RNQ/Renukut   |   466 km / 861 km
14370-Slip/Bareilly - Barwadih Triveni Link Express
Entry# 1771075

PNR: 221-xxxxxxx (E-Ticket)   |   Similar PNRs
Posted Status as of: Mar 18 2016 (11:31AM)
Passenger 1: Waitlist# 18 (Booking Status: W/L 22,RLGN)
Passenger 2: Waitlist# 19 (Booking Status: W/L 23,RLGN)
Chart NOT Prepared
Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Mar 21 2016 (12:15PM)
Passenger 1: Waitlist# 14 (Booking Status: W/L 22,RLGN)
Passenger 2: Waitlist# 15 (Booking Status: W/L 23,RLGN)
Chart PREPARED

Show Full PNR Status History (4 statuses)
Status as of: Mar 21 2016 (12:15PM)
Passenger 1: Waitlist# 14 (Booking Status: W/L 22,RLGN)
Passenger 2: Waitlist# 15 (Booking Status: W/L 23,RLGN)
Chart PREPARED

Status as of: Mar 21 2016 (10:53AM)
Passenger 1: Waitlist# 14 (Booking Status: W/L 22,RLGN)
Passenger 2: Waitlist# 15 (Booking Status: W/L 23,RLGN)
Chart NOT Prepared

Status as of: Mar 20 2016 (7:14PM)
Passenger 1: Waitlist# 16 (Booking Status: W/L 22,RLGN)
Passenger 2: Waitlist# 17 (Booking Status: W/L 23,RLGN)
Chart NOT Prepared

Status as of: Mar 18 2016 (11:32AM)
Passenger 1: Waitlist# 18 (Booking Status: W/L 22,RLGN)
Passenger 2: Waitlist# 19 (Booking Status: W/L 23,RLGN)
Chart NOT Prepared

Predictions: 22
confirm: 22
rac: 0
wl: 0
Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Journey: Fri Sep 26, 2014 @ 21:20
Class: Sleeper - SL
Travel: ALD/Allahabad Junction   to   DTO/DaltonGanj   |   398 km / 861 km
14370-Slip/Bareilly - Barwadih Triveni Link Express
Entry# 1223457
 

Posted by: NISHEETH SINGH*^   3905 blog posts   1714 correct pred (83% accurate)
PNR: 283-xxxxxxx    |   Similar PNRs
Posted Status as of: Sep 25 2014 (8:25AM)
Passenger 1: RAC 3 (Booking Status: RAC 5,RLGN)
Passenger 2: RAC 4 (Booking Status: RAC 6,RLGN)
Passenger 3: RAC 5 (Booking Status: RAC 7,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Sep 26 2014 (5:37PM)
Passenger 1: S5,61/Coach Position:1 (Booking Status: RAC 5,RLGN)
Passenger 2: S5,62/Coach Position:1 (Booking Status: RAC 6,RLGN)
Passenger 3: S5,71/Coach Position:1 (Booking Status: RAC 7,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart PREPARED
Predictions: 0
confirm: 0
rac: 0
wl: 0
Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Journey: Fri Nov 08, 2013 @ 21:20
Class: Sleeper - SL
Travel: ALD/Allahabad Junction   to   DTO/DaltonGanj   |   398 km / 861 km
14370-Slip/Bareilly - Barwadih Triveni Link Express
Entry# 883955
 

Posted by: pandeyg846   163 blog posts   12 correct pred (60% accurate)
PNR: 245-xxxxxxx    |   Similar PNRs
Posted Status as of: Oct 22 2013 (3:46PM)
Passenger 1: Confirmed (Booking Status: S5,18,GN)
Passenger 2: Confirmed (Booking Status: S5,17,GN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 09 2013 (8:38AM)
Passenger 1: S5,18/Coach Position:1 (Booking Status: S5,18,GN)
Passenger 2: S5,17/Coach Position:1 (Booking Status: S5,17,GN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart PREPARED
Predictions: 0
confirm: 0
rac: 0
wl: 0
Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Journey: Wed Sep 25, 2013 @ 16:10
Class: Sleeper - SL
Travel: LKO/Lucknow Charbagh NR   to   DTO/DaltonGanj   |   599 km / 861 km
14370-Slip/Bareilly - Barwadih Triveni Link Express
Entry# 859442
 

Posted by: CrUeL InTeNtIoNs*^~   4228 blog posts   42644 correct pred (92% accurate)
PNR: 261-xxxxxxx    |   Similar PNRs
Posted Status as of: Sep 24 2013 (3:39PM)
Passenger 1: Confirmed (Booking Status: S6,42,GN)
Passenger 2: Confirmed (Booking Status: S6,43,GN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Sep 24 2013 (3:39PM)
Passenger 1: Confirmed (Booking Status: S6,42,GN)
Passenger 2: Confirmed (Booking Status: S6,43,GN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared
Predictions: 26
confirm: 1
rac: 0
wl: 25
Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Journey: Fri Jun 28, 2013 @ 21:20
Class: Sleeper - SL
Travel: ALD/Allahabad Junction   to   DTO/DaltonGanj   |   398 km / 861 km
14370-Slip/Bareilly - Barwadih Triveni Link Express
Entry# 794327
 

Posted by: pandeyg846   163 blog posts   12 correct pred (60% accurate)
PNR: 224-xxxxxxx    |   Similar PNRs
Posted Status as of: Jun 27 2013 (9:36PM)
Passenger 1: Waitlist# 16 (Booking Status: W/L 24,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 28 2013 (11:14PM)
Passenger 1: Waitlist# 13 (Booking Status: W/L 24,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart PREPARED

1870 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Jun 27 2013 (9:38PM)
pandeyg846   163 blog posts   12 correct pred (60% accurate)
Re# 794327-1            Tags   Past Edits
This feature shows the full history of past edits to this Blog Post.
PLZ PREDICT

1871 views

Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Jun 27 2013 (9:38PM)
pandeyg846   163 blog posts   12 correct pred (60% accurate)
Re# 794327-2            Tags   Past Edits
This feature shows the full history of past edits to this Blog Post.
PLZ
Predictions: 23
confirm: 15
rac: 8
wl: 0
Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Journey: Wed Jun 12, 2013 @ 21:20
Class: Sleeper - SL   |   Tot Seats: Avbl >33
Travel: ALD/Allahabad Junction   to   RNQ/Renukut   |   265 km / 861 km
14370-Slip/Bareilly - Barwadih Triveni Link Express
Entry# 780070
 

PNR: 261-xxxxxxx    |   Similar PNRs
Posted Status as of: Jun 11 2013 (9:38AM)
Passenger 1: RAC 7 (Booking Status: RAC 7,RLGN)
Passenger 2: RAC 8 (Booking Status: RAC 8,RLGN)
Passenger 3: RAC 9 (Booking Status: RAC 9,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Jun 12 2013 (5:46PM)
Passenger 1: RS5 15/Coach Position:1 (Booking Status: RAC 7,RLGN)
Passenger 2: RS5 23/Coach Position:1 (Booking Status: RAC 8,RLGN)
Passenger 3: RS5 23/Coach Position:1 (Booking Status: RAC 9,RLGN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart PREPARED
Predictions: 0
confirm: 0
rac: 0
wl: 0
Enter ChatRoom
You need to be logged in to enter ChatRooms. Please click here to sign up.
Journey: Wed Nov 28, 2012 @ 21:35
Class: Sleeper - SL
Travel: NYN/Naini Junction   to   RNQ/Renukut   |   258 km / 861 km
14370-Slip/Bareilly - Barwadih Triveni Link Express
Entry# 593955
 

PNR: 250-xxxxxxx    |   Similar PNRs
Posted Status as of: Nov 26 2012 (8:11PM)
Passenger 1: Confirmed (Booking Status: S5,13,GN)
Passenger 2: Confirmed (Booking Status: S5,14,GN)
Passenger 3: Confirmed (Booking Status: S5,16,GN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status as of: Nov 29 2012 (12:50AM)
Passenger 1: S5,13/Coach Position:1 (Booking Status: S5,13,GN)
Passenger 2: S5,14/Coach Position:1 (Booking Status: S5,14,GN)
Passenger 3: S5,16/Coach Position:1 (Booking Status: S5,16,GN)
* Please Note that in case the Final Charts have not been prepared, the Current Status might upgrade/downgrade at a later stage.
Chart PREPARED
Page#    Showing 1 to 7 of 7 PNR entries  

Scroll to Top
Scroll to Bottom


Go to Mobile site