Search Trains
 ♦ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3E
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
2-month Availability Calendar
  Go  
Full Site Search
  Search  
 
Tue Jun 27, 2017 14:32:47 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jun 27, 2017 14:32:47 IST
PostPostPost Trn TipPost Trn TipUpload Train PicUpload Train Pic
Details Edit
Large TB;
Entry# 1325645-0
Details Edit
Large TB;
Entry# 1690093-0
Details Edit
Large TB;
Entry# 1988454-0

14553/Himachal Express (PT)
     हिमाचल एक्सप्रेस

DLI/Old Delhi Junction --> AADR/Amb Andaura

Pantry/Catering
✕ Pantry Car
✕ On-board Catering
✓ E-Catering
Latest News
(You need to double-check/verify this info yourself)
-
Fri Oct 28, 2016 (12:18AM)
Updated: Nov 10 2016 (13:01) by Ferroequinologist*^~
Change Departure Station:
Change Arrival Station:
RSA - Rake Sharing
RSA with 14555/14556
Rating: 3.4/5 (45 votes)
cleanliness - good (8)
punctuality - good (8)
food - average (6)
ticket avbl - good (8)
u/r coach - good (2)
railfanning - average (7)
safety - good (8)
Loco
TKD WDP3A
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
UR1
  3
UR2
  4
UR3
  5
UR4
  6
 B2
  7
 B1
  8
 A1
  9
 S2
 10
 S1
 11
UR5
 12
UR6
 13
UR7
 14
SLR
News    PNR    Forum    Time-Table    Availability    Fare Chart    Map    Arr/Dep History    Trips    Gallery    ΣChains    X/O    Timeline    Train Pics    

Train Travel Tips

Page#    2 travel tips  
06
Train Tip
General
0 Followers
5745 views
Oct 10 2014 (11:32)   14553/Himachal Express (PT) | AADR/Amb Andaura (2 PFs)

ashwaanirana   5 blog posts
Entry# 1241060            Tags   Past Edits
The platform at AMB ANDORA is too short that senior people face very difficulty while boarding/deboarding from sleeper coaches. it should be extended immediately to facilitate the passengers

3313 views
Oct 10 2014 (12:25)
rdb*^   31429 blog posts   378214 correct pred (80% accurate)
Re# 1241060-1            Tags   Past Edits
amb se aaage line kahhan tak pahunchi hai?

2693 views
Apr 18 2015 (10:54)
ALL TIME GREAT~   3154 blog posts   26 correct pred (67% accurate)
Re# 1241060-2            Tags   Past Edits
Kahi ni pohochi...

3094 views
Apr 18 2015 (10:56)
Railfan Z bids adieu to SR*^~   11513 blog posts   2583 correct pred (84% accurate)
Re# 1241060-3            Tags   Past Edits
What about status of UHL-AADR Electrification?

3000 views
Apr 18 2015 (10:58)
ALL TIME GREAT~   3154 blog posts   26 correct pred (67% accurate)
Re# 1241060-4            Tags   Past Edits
nothing...

2808 views
Apr 18 2015 (11:00)
ALL TIME GREAT~   3154 blog posts   26 correct pred (67% accurate)
Re# 1241060-5            Tags   Past Edits
I might be travelling on 27 April...will tell u the current scenario...

3285 views
Apr 29 2015 (20:02)
ALL TIME GREAT~   3154 blog posts   26 correct pred (67% accurate)
Re# 1241060-6            Tags   Past Edits
I travelled yesterday and there is no work going on for electrification...

3856 views
Apr 29 2015 (20:30)
ALL TIME GREAT~   3154 blog posts   26 correct pred (67% accurate)
Re# 1241060-7            Tags   Past Edits
I travelled yesterday and there is no work going on for electrification...

1025 views
May 27 2017 (18:36)
kbhardwaj1983   22 blog posts
Re# 1241060-8            Tags   Past Edits
Work is going on of Electrification............But I think spead is very slow.........
But as per railway sources will complete before end of Dec-2017 along with Completing Rail Track up to Daulatpur Chowk Station.

1111 views
May 27 2017 (18:36)
kbhardwaj1983   22 blog posts
Re# 1241060-9            Tags   Past Edits
Work is going on of Electrification............But I think spead is very slow.........
But as per railway sources will complete before end of Dec-2017 along with Completing Rail Track up to Daulatpur Chowk Station.

968 views
May 27 2017 (18:37)
kbhardwaj1983   22 blog posts
Re# 1241060-10            Tags   Past Edits
As per railway sources work will complete before end of Dec-2017 of Rail Track up to Daulatpur Chowk Station.

936 views
May 28 2017 (00:34)
ALL TIME GREAT~   3154 blog posts   26 correct pred (67% accurate)
Re# 1241060-11            Tags   Past Edits
I dont think so...definitely not upto daulatpur chowk...
02
Train Tip
Toilet/Water/Cleanliness
0 Followers
2005 views
May 06 2015 (12:38)   14553/Himachal Express (PT)

ALL TIME GREAT~   3154 blog posts   26 correct pred (67% accurate)
Entry# 1456926            Tags   Past Edits
AC coaches of the train are cleaned at Delhi Jn and boarding(AC coaches) is allowed only after 10:30 pm so plan accordingly...
Page#    2 travel tips  

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.