Now speed this train up in SDAH-AUB section. 517.2 kms can easily be covered in 9 hrs 15 mins. SDAH 20.30; BWN 22.12/14; BHP 23.04/06; SNT 23.36/38; RPH 00.05/10; PKU 01.10/12; NFK 01.51/56; MLDT 02.35/45; BOE 04.13/15; KNE 05.10/15; AUB 05.45/47; SGUJ 07.10/25; APDJ 11.10|| In return:- APDJ 16.15; SGUJ 20.00/15; AUB 21.35/37; KNE 22.07/12; BOE 23.07/09; MLDT 00.44/54; NFK 01.27/32; PKU 02.10/12; RPH 03.12/17; SNT 03.45/47; BHP 04.17/19; BWN 05.16/18; SDAH 07.05|| 755 kms in 14 hrs 45 mins @ 51 kph.