Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Sep 25, 2017 13:32:32 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Sep 25, 2017 13:32:32 IST
PostPostPost Trn TipPost Trn TipPost Stn TipPost Stn TipAdvanced Search
Filters:

Page#    308277 Blog Entries  next>>
  
** Itarsi - Jabalpur Electrification Detailed Update **
1. Itarsi- Pipariya (67 KMS): Double Electric Line. Electric locos already plying.
2. Pipariya-Salichauka Road (36 KMS):- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
3. Salichauka Road - Bohani (27 KMS):- Poles erected. Clippers installed. Catenary wire along with contact wire installed, except in few patches.
...
more...
Tightening still needs to be done. Masts at Gadarwara are erected and clippers are yet to be installed. (60 % Completed)
4. Bohani - Narsinghpur (31 KMS) :- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
5. Narsinghpur - Bheraghat (62 KMS):- Poles erected. Clippers installed. Catenary along with contact wire installed. Tightening done. Work at stations done. (Completed)
__________________________________________________ __________________________________________________ ____________________________
In other words, just a small patch of 27 KMS bw SCKR and BHN is under construction. It's just a one month work. Apart from that everything is done. Major work left is Electrifying Jabalpur City, PFs and Yard. It'll take arounf 2 months or so, I guess. According to me, November could mark the entry of E-locos in JBP is work goes at decent pace.
#ETALDElectrification
#JBPNews
P.S: Apologies for the poor quality of pics. I was not feeling like going out and taking pictures while doorplating. So I took the pictures from inside.

10 posts - Yesterday

  
218 views
Yesterday (23:17)
King in the North~   1772 blog posts   78 correct pred (65% accurate)
Re# 2418293-14            Tags   Past Edits
Katni side bhi kaam tezi se ho rha h. March 2018 me JBP-KTE bhi electric ho jayega.

  
203 views
Yesterday (23:18)
King in the North~   1772 blog posts   78 correct pred (65% accurate)
Re# 2418293-15            Tags   Past Edits
Agar CORE change toh 1 month is enough for electrifying JBP yard and station. But I guess jab tak pressure nahi padega, kaam delay hoga. That's why I said 2 months after taking some margin.

  
200 views
Yesterday (23:21)
★★★BRC WAP 7😎 AtBEAWAR~   1931 blog posts   2093 correct pred (89% accurate)
Re# 2418293-16            Tags   Past Edits
jbp nzm sf exp and seb ka RSA q kiya gaya thaa ?

  
192 views
Yesterday (23:24)
King in the North~   1772 blog posts   78 correct pred (65% accurate)
Re# 2418293-17            Tags   Past Edits
So that agar ek ko LHB mile toh dono ko laabh mile.

  
168 views
Yesterday (23:58)
Waiting for eloco CRS in PPIJBP section😌~   86 blog posts
Re# 2418293-18            Tags   Past Edits
Nice updates... I think by this pace of work we can see elocos in PPI-JBP section by december 2017 or in december ending (maximum extension). Thanks for the updates.
0d 6h 17m remaining for Trip Start.
Live logging for this trip will be enabled Today @ 17:50.
Blog  Time-Table
  
★  General Travel
0 Followers
586 views
Yesterday (21:17)   12156/Shaan E Bhopal SF Express | HBJ/Bhopal HabibGanj (5 PFs) | TKD/WAP-7/30361

Arpan Pal   777 blog posts   1 correct pred (100% accurate)
Entry# 2418455            Tags   Past Edits
5 compliments
Happy journey शुभ यात्रा Happy journey Happy Journey Happy Journey
On Board 12156 Shaan E Bhopal Superfast Express with TKD Bazigar 30361. My Coach S2 is 2016 made. Clean as per SEB standard. Currently crossing Okhla.

57 posts - Yesterday

3 posts - Today

  
69 views
Today (12:30)
Arpan Pal   777 blog posts   1 correct pred (100% accurate)
Re# 2418455-68            Tags   Past Edits
Some pics of The journey.
Pic1: SEB running on 3rd line at MPS.
Pic2: Coach Number and Time Table.
Pic3: SEB negotiating curve with TKD Baazigar 30361
Pic4: New Station building and platform of Sorai,
...
more...
Vidisha under construction.
Pic 5: 3rd line action at Sukhisewania.
Pic 6: Nishatpura Yard
Pic 7: Approaching Habibganj ET WAP 4 seen departing from Hbj pf 1 hauling BSP-INDB Narmada Express.
Pic 8: RDSO Oscillohraph Inspection Rake at HBJ PF 2 with ET WDP 4B duo. Also it has an ET WAP 4 attached at other end but i do not have pic of that one.

  
54 views
Today (12:48)
VaRuन⛱   5324 blog posts
Re# 2418455-69            Tags   Past Edits
Very Good..Bahut ache👏

  
44 views
Today (12:51)
VaRuन⛱   5324 blog posts
Re# 2418455-70            Tags   Past Edits
Late kidhar hui?

  
28 views
Today (13:08)
Arpan Pal   777 blog posts   1 correct pred (100% accurate)
Re# 2418455-71            Tags   Past Edits
Ye dhyaan nhi h. Bina hi 5:12 aayi thi. Uske baad halt jada h fir bhi 7:25 pe BPL aa gyi thi mtlb almost 70 ki avg speed thi bina-bpl section me with 2 halts and numerous TSR. So a Decent Run by WCR Legend.

  
1 views
Today (13:31)
VaRuन⛱   5324 blog posts
Re# 2418455-72            Tags   Past Edits
You enjoyed it na bas... that's important
  
General Travel
0 Followers
4 views
Today (13:31)  

mrmritunjaytiwary   0 blog posts
Entry# 2425986            Tags   Past Edits
October se banega #bihar ke madhepura me #railengine for further updates follow me on twitter
click here
0d 6h 17m remaining for Trip Start.
Live logging for this trip will be enabled Today @ 17:50.
Blog  Time-Table
Page#    308277 Blog Entries  next>>

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Oct 5
Trains with ARP 15 Dep on: Tue Oct 10
Trains with ARP 30 Dep on: Wed Oct 25
Trains with ARP 120 Dep on: Tue Jan 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2418661
    Today (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.