Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Nov 24, 2017 05:46:15 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Nov 24, 2017 05:46:15 IST

Blog Entry# 1053690
Posted: Apr 11 2014 (13:49)

8 Responses
Last Response: Apr 14 2014 (14:14)
  
Rail News
0 Followers
1372 views
Other NewsKR/Konkan  -  
Apr 11 2014 (13:46)   Konkan Railway plans to lay Second Line in plains
 

Jayashree ❖ Amita*^   38182 news posts
Entry# 1053690   News Entry# 173494         Tags   Past Edits
Mumbai:  In what should be good news for lakhs of travellers on the Konkan Railway, an initial study has concluded that it would be feasible to lay a second line on sections of the route that run on the plains.
“We are planning to go for patch doubling (railway lingo for laying new tracks on sections where it is possible) and the initial estimate for the work is being worked out,” said Vaishali Patange, chief spokesperson of the Konkan Railway.
The 741 km single-line Konkan Railway route was opened in 1998 and has
...
more...
become one of the busiest in the country within a decade and a half, compelling the authorities to consider augmenting the track capacity. But the geographical aspect and the huge cost this would entail have restricted any progress so far.
According to a study conducted over the past few months, doubling the track is possible on about 300 km that runs on the plains. For example, the 47km from the starting point at Roha to Veer. The 60km stretch between Udupi and Mangalore is another stretch. There are several other patches in between, officials said.
The route is very popular among those headed to Goa or Mangalore and even further south to Kerala.
According to the officials, the other stretches, particularly between Veer and Udupi have cuttings and tunnels through hills and this poses a big technical and ecological challenge.
But they believe that even the part track doubling would considerably help to increase track capacity which would allow for more trains on the route.
The Konkan Railway operates 78 trains daily which carry about 35 million passengers annually. But there is always a long waiting list of passengers hoping to travel on these trains and it is almost impossible to run any more services with the existing track capacity.
Between January and December 2013, 844 special trains were operated on the route to clear the rush, up from the 537 trains run in the corresponding period in 2012. The Konkan Railway also added a whopping 1,734 coaches to existing trains to manage the demand.
“All these extra trains carried 1,2 million people, but it still couldn’t satisfy the demand. It is this lack of capacity that is allowing the private bus operators on the route make a killing year after year,” a senior official said.
In October, officials estimated the cost of laying a new line in the region at Rs.15,000 crore which would require financing from an institution like the World Bank. This is mainly because the Konkan Railway balance sheet is not too good.
At the end of September 2013, Konkan Railway had a revenue of Rs.1,085 crore and expenditure of Rs.1,066 crore, leaving it with almost nothing to plough back.
“All the participant states in the Konkan Railway, namely Maharashtra, Goa, Karnataka, Kerala, should act quickly to finish the doubling of the route so people can get relief,” the official said.
Numbers matter Route length : 741 km Feasibility of track doubling : 300 km Number of trains daily : 78 services up and down Special trains between Apr and Dec 2013 : 844 Extra coaches coupled to regular trains between Apr and Dec 2013 : 1,724

2 posts - Fri Apr 11, 2014

1 posts - Sun Apr 13, 2014

  
625 views
Apr 13 2014 (15:16)
date1984   40 blog posts
Re# 1053690-4            Tags   Past Edits
Are bhai KR electrification ke grievence ka kya hua?

  
577 views
Apr 13 2014 (15:30)
▅ ▆ ▇ █★KR ♥ Lover ♥ Forever★█ ▇ ▆ ▅~   10367 blog posts   3405 correct pred (57% accurate)
Re# 1053690-5            Tags   Past Edits
KR se hi puch lo
But Doubling is more necessary than Electrification

  
476 views
Apr 13 2014 (20:09)
date1984   40 blog posts
Re# 1053690-6            Tags   Past Edits
Are bhai KR electrification ke grievence ka kya hua?

  
860 views
Apr 14 2014 (09:23)
date1984   40 blog posts
Re# 1053690-7            Tags   Past Edits
Are bhai KR electrification ke grievence ka kya hua?

  
779 views
Apr 14 2014 (14:14)
▅ ▆ ▇ █★KR ♥ Lover ♥ Forever★█ ▇ ▆ ▅~   10367 blog posts   3405 correct pred (57% accurate)
Re# 1053690-8            Tags   Past Edits
No news till now..........

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 4
Trains with ARP 15 Dep on: Sat Dec 9
Trains with ARP 30 Dep on: Sun Dec 24
Trains with ARP 120 Dep on: Sat Mar 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.