Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 25, 2017 07:53:32 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 25, 2017 07:53:32 IST

Blog Entry# 1056322
Posted: Apr 13 2014 (17:20)

3 Responses
Last Response: Apr 13 2014 (17:39)
  
Rail News
0 Followers
959 views
Commentary/Human Interest
Apr 13 2014 (15:11)   Indian Railways cross freight target in 2013-14

rdb*^   132881 news posts
Entry# 1056322   News Entry# 173696         Tags   Past Edits
Business Line reported that the Indian Railways carried 1,053.54 million tonne of cargo in 2013-14, up 4.3% against the traffic moved in 2012-13. The growth in fiscal 2013-14 is higher than the annual growth of 4.13% seen in fiscal 2013 and is registered on a higher base.
With this, the Railways has crossed the upward revised target to move 1,052 million tonne of freight set in the interim Budget.
Mr Devi Prasad Pande Member Traffic, Railway Board said that “The sharpest incremental growth was seen in non traditional commodities, such as cement, and
...
more...
other commodities such as onion, sugar and de oiled cakes.”
The growth is also supported by commodities such as coal, petroleum products, steel and fertiliser. Higher loading by Railways which moves coal to power plants, iron and steel to factories and other cargo from port is good news, as it indicates economic activity.

  
2029 views
Apr 13 2014 (17:20)
priyankar.bagde   5 blog posts
Re# 1056322-1            Tags   Past Edits
Plz confirm me that how long it's take to get my pnr no 4608411745 to be confirmed

  
2130 views
Apr 13 2014 (17:30)
Sujit Roy   37 blog posts   183 correct pred (66% accurate)
Re# 1056322-2            Tags   Past Edits
Post your pnr in pnr forum

  
2083 views
Apr 13 2014 (17:39)
Sujit Roy   37 blog posts   183 correct pred (66% accurate)
Re# 1056322-3            Tags   Past Edits
Post your pnr in pnr forum

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 5
Trains with ARP 15 Dep on: Sun Dec 10
Trains with ARP 30 Dep on: Mon Dec 25
Trains with ARP 120 Dep on: Sun Mar 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.