Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 25, 2017 02:08:27 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 25, 2017 02:08:27 IST

Blog Entry# 1061879
Posted: Apr 18 2014 (07:46)

33 Responses
Last Response: May 22 2014 (12:06)
  
★★  Rail Fanning
0 Followers
5007 views
Apr 18 2014 (07:46)   12533/Pushpak Express (PT) | LJN/Lucknow Junction NER (6 PFs)
 

Prakhar*^~   4334 blog posts   414 correct pred (82% accurate)
Entry# 1061879            Tags   Past Edits
Presenting
12533 LJN-CSTM Pusphak Express with BSL WAP4 on 13 Apr' 14, Sun
on 14 Apr' 14 Mon 12534 also came with BSL WAP 4

28 posts - Sun Apr 20, 2014

  
456 views
Apr 20 2014 (22:04)
Stand Alone~   3027 blog posts   17872 correct pred (93% accurate)
Re# 1061879-29            Tags   Past Edits
sir in CR AC power till ltt only cstm-kurla is still under DC power so trains from cstm are running with wcam 3 n have loco change at IGP

  
1393 views
Apr 21 2014 (08:40)
☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   15592 blog posts   3090 correct pred (65% accurate)
Re# 1061879-30            Tags   Past Edits
jhs may loco change ki jarurat kya h..end 2 end de de

  
1035 views
Apr 21 2014 (18:42)
Prakhar*^~   4334 blog posts   414 correct pred (82% accurate)
Re# 1061879-31            Tags   Past Edits
it was scheduled to get e.loco but didnt. :-)

  
1282 views
Apr 21 2014 (18:43)
Prakhar*^~   4334 blog posts   414 correct pred (82% accurate)
Re# 1061879-32            Tags   Past Edits
probably now dere is now loco change at JHS. but end to end not pos due DC traction of CSTM.

  
1464 views
May 22 2014 (12:06)
shahkalam   175 blog posts
Re# 1061879-33            Tags   Past Edits
ok I understand that because of single line between Jhansi and Kanpur it delays but then also it reaches Kanpur on time, but what happened between Kanpur and Lucknow junction as the train gets delayed between cnb and ljn itself.
anyone has any idea?

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 5
Trains with ARP 15 Dep on: Sun Dec 10
Trains with ARP 30 Dep on: Mon Dec 25
Trains with ARP 120 Dep on: Sun Mar 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.