Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Jul 18 14:41:17 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 1061998
Posted: Apr 18 2014 (10:08)

5 Responses
Last Response: Apr 18 2014 (13:36)
  
Rail News
0 Followers
1282 views
Commentary/Human Interest
Apr 18 2014 (05:36)   The high-speed trains are coming
 

rdb*^   133332 news posts
Entry# 1061998   News Entry# 174031         Tags   Past Edits
With private participation, we can whizz along key metro corridors
The recent visit to China by a high-powered delegation could soon turn Indian Railways’ ‘high speed’ dreams into reality.The delegation, under the leadership of Montek Singh Ahluwalia, included the Chairman of the Railway Board, the Managing Director of the High Speed Rail Corporation, and others.
After meeting the Chinese Prime Minister, the team interacted with officials of the Chinese Railway Corporation.
Soon,
...
more...
a contract with them will usher in an era of long-term technical cooperation with the Chinese Railways, which already has more than 9,700 km of new track capable of running trains at 300 kmph and over 20,000 km of upgraded track fit for 200 kmph.
Feasibility studies Back home, over the last decade or so, each new railway minister has promised to build a high-speed corridor and, as a follow-up action, the Railway Board has been dutifully parcelling out pre-feasibility and other studies to various experts in the field and their reports have been carefully filed!
At the last count there are no less than seven of them, at various stages of deliberation, including the 450-km rail corridor of Delhi-Chandigarh-Amritsar, for which technical evaluation of offers from consultants have been completed and financial bids are being finalised.
Pune-Mumbai-Ahmedabad, a 650-km stretch, has been studied by Systra (France), Italferr (Italy), and RITES (India). A 991-km proposal for a highly ambitious Delhi-Agra-Lucknow-Varanasi-Patna has a feasibility report by Mott McDonald of the UK.
Mamata Banerjee’s pet project of a 135-km Howrah-Haldia line has been studied by Ineco, Prointec, and Ayesa of Spain, a 664-km section of Hyderabad-Dornakal-Vijayawada-Chennai studied by a consortium led by Parsons Brinckerhoff (India). Another ambitious 850-km stretch covering Chennai-Bangalore-Coimbatore-Ernakulum-Thiruvananthapuram has a report by a consortium led by JARTS (Japan Railway Technical Service) and Oriental Consultants. Last but not the least, for the 591-km Delhi-Jaipur-Ajmer-Jodhpur tenders for engaging consultants are reportedly being finalised.
Private participation In view of the high cost of nearly ₹200 crore per km for these projects — since such high speeds need an elevated corridor and even a new alignment with the added problem of acquisition of land the Railway Ministry has now opted for finding low cost solutions.
Hiking existing maximum speeds of some of its premier trains such as Rajdhani and Shatabdi from 130 kmph to a level of only 160 -200 kpmh could result in 15-30 per cent reduction in transit time, depending on how much of the track would be upgraded. Though cost of upgrading of the track, rolling stock, locomotives and signalling is expected to be much lower than the price tag for the 300 kmph plus variety, funds could still remain a constraint, and all corridors may not be financially viable.
Perhaps, the projects could perhaps be viewed as a socially desirable investments, and even end up decongesting Metros such as Delhi, Kolkata, Chennai, Hyderabad and Mumbai, by spurring development of Tier 2 and Tier 3 cities around them.
It would also help to save on the nation’s fuel bill, reduce air pollution with more fuel-efficient rail transport, reduce road congestion and connected accidents.
The reduction of commuter fatigue is perhaps is a single major factor behind the popularity of the high speed services of Japan, Europe and China. While in the US a number of projects are still on the drawing board, the booming Chinese economy has financed large scale upgradation of existing track to 200 kmph and construction of a number of high speed corridors with trains running at an optimum speed of 300 kmph.
A master plan envisages four corridors each on the north-south and east-west alignments to be completed by 2020, of which 1,433 km Beijing-Shanghai, 2,078 km Shanghai-Wuhan-Chengdu, 1,495 km Hangzhou-Shenzen, and the big daddy of them all, a 2,298 km line from Beijing to Guangzhou — equivalent to a Delhi-Bangalore trip — are already is service.
While the popularity of high-speed rail services can seldom be in doubt, only time will tell if they will prove to be financially viable. PPP initiatives in the past for Metro systems have seen some success stories and a couple of failures. A high-speed corridor on the Ahmedabad-Mumbai or Delhi-Chandigarh route with high enough volumes could prove attractive enough for some private players with deep pockets.
However, given the poor financial health of the Indian Railways, techno-economic considerations would undoubtedly have to be the deciding factor for the jump to 300 kmph. And a major hike in passenger tariff will be inescapable on such trains — a move that may be anathema to our netas!
The writer is former Member (Mechanical), Railway Board

5 Public Posts - Fri Apr 18, 2014

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jul 28
Trains with ARP 15 Dep on: Thu Aug 2
Trains with ARP 30 Dep on: Fri Aug 17
Trains with ARP 120 Dep on: Thu Nov 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3601043
    Jul 04 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
  • Entry# 3535285
    Jun 15 2018 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
  • Entry# 3444356
    May 23 2018 (12:09PM)


    @all: With the introduction of the pre-moderation scheme for new IDs described here Blog Entry# 3443990-1 and Entry# 3441062 , following is a summary of Forum Guidelines in effect: . 1. Blog Posts by new IDs appear in public ONLY AFTER scrutiny and approval by FMs. A member may create as many Fake IDs as...
  • Entry# 3441062
    May 22 2018 (12:51PM)


    The system detailed here Blog Entry# 3440635 will be rolled out soon. Meanwhile, immediately, to curb the menace of fake IDs, starting tomorrow, all blog posts from New Members will be "PRE-moderated". . What this means is that, UNTIL the member acquires at least 10 public positive Ratings - Great/Thanks, etc. . 1. ALL posted blogs...
  • Entry# 3440635
    May 22 2018 (10:04AM)


    To curb the proliferation of duplicate IDs in IRI, we shall soon be requiring SMS-based authentication to post blogs. . Members will be required to provide a mobile phone number to authenticate their accounts. An OTP will be sent to the number. Upon entering the OTP, the account will be associated with that...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy