Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 25, 2017 17:13:08 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 25, 2017 17:13:08 IST

Blog Entry# 1065330
Posted: Apr 21 2014 (06:15)

7 Responses
Last Response: May 14 2014 (14:17)
  
General Travel
0 Followers
1894 views
Apr 21 2014 (06:15)   12649/Karnataka Sampark Kranti Express (Via Kacheguda) (PT)
 

Bangalore to Kacheguda via kurnool Doubling~   2565 blog posts   2617 correct pred (77% accurate)
Entry# 1065330            Tags   Past Edits
It seems krnt stop is removed from 6/6/14
:(

2 posts - Apr 2014

  
975 views
May 14 2014 (11:06)
Surat BDTS Intercity the DON of WR~   5845 blog posts   227 correct pred (68% accurate)
Re# 1065330-3            Tags   Past Edits
It was Experimental and Showcase halt. Depends on New Ministry and New RM.

  
884 views
May 14 2014 (13:32)
Bangalore to Kacheguda via kurnool Doubling~   2565 blog posts   2617 correct pred (77% accurate)
Re# 1065330-4            Tags   Past Edits
But it was much needed stop...

  
855 views
May 14 2014 (13:38)
Surat BDTS Intercity the DON of WR~   5845 blog posts   227 correct pred (68% accurate)
Re# 1065330-5            Tags   Past Edits
It's KSK not APSK.....

  
798 views
May 14 2014 (13:38)
Begins Falls Rises ™~   21453 blog posts   1207 correct pred (63% accurate)
Re# 1065330-6            Tags   Past Edits
The actual Experimental halt needs to b in the period of 3-6 months by RB.
IF the stop does well in short period, then they are converted into regular halts.
But if they fail to attract minimum required, RB can remove it.
Now a days, RB can't remove due to pressure by public.
But
...
more...
some halts can removed easily.
Similarly, some halts are politically enforced ones, so RB can remove them later and if needed, they'll re-add back if next minister requests or RB sees the pax for it.

  
May 14 2014 (14:17)
Ferroequinologist*^~   12224 blog posts   82 correct pred (71% accurate)
Re# 1065330-7            Tags   Past Edits
it's not been removed but the date set in the systems for allowance of its booking is coming to an end as the six month experimental period is on the verge of completion. So once the public pressure will increase on its reservation demand, then they ll suddenly wake up from the sleep and update the systems accordingly. happens with every new halt. Just wait and watch.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 5
Trains with ARP 15 Dep on: Sun Dec 10
Trains with ARP 30 Dep on: Mon Dec 25
Trains with ARP 120 Dep on: Sun Mar 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.