Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Oct 17 21:28:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 1066464
Posted: Apr 21 2014 (22:27)

2 Responses
Last Response: Apr 22 2014 (09:43)
  
Rail Fanning
0 Followers
3617 views
Apr 21 2014 (22:27)   16127/Chennai Egmore - Guruvayur Express (PT) | TBM/Tambaram (8 PFs)
 

ArkChat921*^~   6198 blog posts   3431 correct pred (60% accurate)
Entry# 1066464            Tags   Past Edits
Arriving at Tambaram, and meeting ED WDM-3D Pearl City (Muthu Nagar) SF: Guruvayur Express (Jan 2013)
.
.
22730 WAP- 4 of ED (Erode) shed hauled 16127 Chennai Egmore (MS)- Guruvayur (GUV)/ Tuticorin (TN) Express slows down on its approach to Tambaram (TBM) station, which is one of the most important suburban station of Chennai. As we cruise through the points, the massive Tambaram
...
more...
EMU Car Shed could be spotted. Further as we approach the station, we meet the late running 11109 ED (Erode) WDM- 3D hauled 12694 Tuticorin (TN)- Chennai Egmore (MS) PEARL CITY (MUTHU NAGAR) Superfast Express before getting overtaken by an EMU. Finally we brake to give the first scheduled halt of the journey.
PEARL CITY (MUTHU NAGAR) Superfast Express follows the Tuticorin- Vanchi Maniyachchi- Virudunagar- Madurai- Dindigul- Tiruchchirappalli- Vriddhachalam- Villupuram- Chengalpattu- Tambaram- Chennai Egmore route. Now the train no more gets a ED WDM- 3D for its entire journey. The Madurai- Chennai Egmore section is now handled by an ED/ RPM WAP- 4.
Tambaram railway station::
Tambaram Railway Station is one of the railway termini of the Chennai Beach--Tambaram section of the Chennai Suburban Railway Network. It is situated at a distance of 6 km from the centre of Tambaram, a suburb of Chennai located 27 km south of the city centre. It is one of the fastest growing railway hubs outside Chennai Central in the southern direction.
Tambaram Railway Station divides Tambaram into East Tambaram and West Tambaram. There are nine platforms in the station. Platforms 3 and 4 are not used as the metre gauge lines are yet to be taken up for conversion, whereas those between 5 and 9 are used by the suburban electric trains between Chennai Beach and Chengalpattu and Tirumalpur and also long distance express trains. Most of the suburban electric train services originating from Tambaram to Beach and Chengalpattu leave from the first two platforms. There is a foot overbridge connecting East and West Tambaram with access to all platforms. In 2008, Southern Railway started building an additional platform at the westernmost side of the railway station, making Platform No.1 a double-discharge platform, a design which helps commuters to alight on either side of the train, similar to the one at Park Railway Station, where the passengers could alight on the western side for quicker access to Chennai Central.
The lines at the station were one of the first in Chennai to be electrified. They were energised on 1.5 kV DC in 1931 with the electrification of the Chennai Beach--Tambaram section, and the third line in the section was electrified on 15 January 1965. The lines further south from the station, up to Chengalpattu, were electrified on 9 January 1965. On 15 January 1967, all the lines were converted to 25 kV AC.
The station had a huge metre-gauge freight marshalling yard for Chennai, which has been closed.It is also a former electric shed and home to the YAM-1 locomotives. Presently, the station has a broad-gauge EMU maintenance and car shed. The EMU car shed was established in 1931 and has adequate facilities to maintain 12-coach rakes.
++ Videos taken on-board the train:
click here

2 Public Posts - Tue Apr 22, 2014

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Oct 27
Trains with ARP 15 Dep on: Thu Nov 1
Trains with ARP 30 Dep on: Fri Nov 16
Trains with ARP 120 Dep on: Thu Feb 14

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
  • Entry# 3535285
    Jun 15 2018 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy