Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Nov 21, 2017 18:00:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Nov 21, 2017 18:00:07 IST

Blog Entry# 1075651
Posted: Apr 29 2014 (02:29)

537 Responses
Last Response: May 01 2014 (20:25)
  
Race Blog
6 Followers
4475 views
Apr 29 2014 (02:29)   22109/Mumbai LTT - Hazrat Nizamuddin AC SF Express
 

Ferroequinologist*^~   12222 blog posts   82 correct pred (71% accurate)
Entry# 1075651            Tags   Past Edits
©® ¥¥ ΔΔΔΔ @@@@@@@@@@@@@@ ΔΔΔΔ ¥¥ ©®
****TODAYS DUTY CHART OF "WARRIORS " IS OUT****
************************************************** *******
######### Weekly Rath Yatra of 22109 ##########
########*********************************#########
------------चालकदल
...
more...
स्टैंडबाय पर जाने का अनुरोध है--------------
©® ±±±±± LTT - NZM @¢ Superfast €×pπ€§§ ±±±±± ©®
Vijesh K------------------------------LP
Amol P Nikam ----------------------------ALP
Joshua Mendonca------------------------TLP
Yash--------------------------------------CRS inspector
Soumitra ji**------------------------------CR controller
Himanshu Shar---------------------------WCR controller
paurav Shah------------------------------NCR controller
Sahil Rao ----------------------------NR controller
MANISH SINGH-------------------------- Fire Cracker Man
SV Iyer ji----------------------------------Section Engineer
Franz Reuleaux----------------------------OSD
Harsh Arjeria-----------------------------Executive OSD
Awes Khan** -----------------------------Guard
Anshul Vipat--------------------------------Head TTE
Harshad ji--------------------------------TTE
Koush------------------------------------Running Train Cleaning Staff
Arya Rishav ji --------------------------- Assistant TTE
Rajkiran**--------------------------------Chief Cook in pantry
Piyush **--------------------------------AC coach attendent
^°©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®°^
#------------------------------------------------- -----#

532 posts - Wed Apr 30, 2014

  
590 views
Apr 30 2014 (11:33)
Hussain*^~   19784 blog posts   415983 correct pred (84% accurate)
Re# 1075651-540            Tags   Past Edits
Arrived at HAZRAT NIZAMUDDIN (NZM) at 30-Apr 11:20 Delayed by 60 Min...

  
534 views
Apr 30 2014 (12:01)
Anshul Vipat~   7950 blog posts   1878 correct pred (71% accurate)
Re# 1075651-541            Tags   Past Edits
Wonderful run by AC exp today. BPL sirf 5 mins late aur NZM me sirf 1 ghanta. Agar CRS allow karta he for 130,then NZM on time arrival aaram se ho sakta he.
Same 22110 bhi LTT on time aa sakti he.

  
612 views
Apr 30 2014 (13:39)
msd   39 blog posts   7 correct pred (100% accurate)
Re# 1075651-542            Tags   Past Edits
please continue this hartal.

  
517 views
Apr 30 2014 (20:43)
NCR is Pride of IR*^~   35591 blog posts   3152 correct pred (69% accurate)
Re# 1075651-543            Tags   Past Edits
I have experienced 12415 completing Mathura Faridabad within 65 mins with one halt at palwal.

  
1351 views
May 01 2014 (20:25)
S V Iyer*^~   14885 blog posts   12365 correct pred (64% accurate)
Re# 1075651-544            Tags   Past Edits
Even the hartal is no good... looks like we will have to sit outside respective DRM offices of all zones....:(

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 1
Trains with ARP 15 Dep on: Wed Dec 6
Trains with ARP 30 Dep on: Thu Dec 21
Trains with ARP 120 Dep on: Wed Mar 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.