Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 18, 2017 19:44:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 18, 2017 19:44:49 IST

Blog Entry# 1075818
Posted: Apr 29 2014 (09:20)

1 Responses
Last Response: Apr 29 2014 (09:24)
  
General Travel
0 Followers
1130 views
Apr 29 2014 (09:20)   12238/Begampura Express (PT)
 

aditya.adityapnd.pandey05   3 blog posts   3 correct pred (60% accurate)
Entry# 1075818            Tags   Past Edits
Travel Review : Dt. 27/04/2014
Great Train. Trvld. JAT > LDH.
Loco : LDH WDM 3A 16191R LHF Mode
JAT Dept PF: 2
PTK : PF 1
JRC
...
more...
: PF 3
LDH : PF 3
Train also halted at Bharoli Junction 5Mins PF 2
Train runs very fast.
Arrived JRC 15 Mins Before.
Overtaken by Shan-e-Punjab @ JRC PF 2
Overall a very good train.
Electrification on JAT > JRC:
Electrification is fully completed b/w Jat to Jrc..
Running of trains not yet started.
BG Doubling on JAT > JRC:
Doubling in several portions of route is Incomplete. Work is fast progress. May be @ d end of year, Elec + Doub. Complete.
Portions of incomplete Doubling :
Vijaypur Jammu > Basantar Block Hut
Samba > Ghagwal
Chakdayala > Chhan Arrorian
Chhan Arorrian > Budhi
Madhopur Punjab > Bharoli Junction
Bharoli Junction > Pathankot Cantt.
I also noticed that the trains slow down very fast at Chhan Arorian. I thought there would be train Crossing, but after crossing 3/4th station, I noticed there was a PSR of 15.
I think you all are familiar w/ PSR : Permanent Speed Restriction.
All that was my review.
Also, train starts full pack from Jammu tawi.
TTE does not leave a single person for ID Proofs.
This train may become a High Priority Train now. Would be great if it gets LHB Rakes.

  
1110 views
Apr 29 2014 (09:24)
Pained to know Boeing 777 landcrashed~   23281 blog posts   21101 correct pred (68% accurate)
Re# 1075818-1            Tags   Past Edits
highly important train only 16 coach should be made 24 coach immediately & later on after 3-4 yrs may be provided LHB coach.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Nov 28
Trains with ARP 15 Dep on: Sun Dec 3
Trains with ARP 30 Dep on: Mon Dec 18
Trains with ARP 120 Dep on: Sun Mar 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.