Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Nov 19, 2017 14:33:52 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Nov 19, 2017 14:33:52 IST

Blog Entry# 1077296
Posted: Apr 30 2014 (03:20)

4 Responses
Last Response: May 01 2014 (00:10)
  
Rail News
0 Followers
1231 views
Other NewsNER/North Eastern  -  
Apr 30 2014 (03:15)   ब्रॉडगेज के लिए 20 करोड़ और मिले काम में तेजी आने की उम्मीद
 

ashalanshu   41 news posts
Entry# 1077296   News Entry# 175169         Tags   Past Edits
बरेली। कासगंज तक चल रहे अमान परिवर्तन के लिए रेलवे ने 20 करोड़ की धनराशि और अवमुक्त कर दी है। इसके बाद निर्माण में अब और तेजी आने की उम्मीद है।
तीन साल से कासगंज-बरेली के बीच काम चल रहा है। पहले चरण में पुलियों के निर्माण, खंभों की शिफ्टिंग के साथ मिट्टी भराव का काम हुआ था, अब दूसरे चरण में लाइन बिछाने से लेकर यांत्रिकी और इंजीनियरिंग विभाग का काम तेजी से जारी है। बरेली से बदायूं के बाद दूसरे चरण में बदायूं से कासगंज तक ब्राडगेज लाइन बिछाने का लगभग 80 फीसदी काम हो चुका है। लेकिन प्रोजेक्ट लेट होने से बाकी निर्माण की लागत बढ़ने पर पूर्वोत्तर रेलवे ने मंत्रालय को 90 करोड़ की डिमांड भेजी थी।
...
more...
हालांकि इसमें जंक्शन से सिटी स्टेशन को जोड़ने के काम का इस्टीमेट भी शामिल था। रेल मंत्रालय ने एनईआर के जरिये इज्जतनगर रेल मंडल को 20 करोड़ की धनराशि और भेज दी है।
----------
निर्माण कार्य अंतिम चरण में है। धनराशि की कमी जैसी कोी बात नहीं है। काम लगातार चल रहा है। प्रोजेक्ट आगे बढ़ने से बजट बढ़ना स्वाभाविक है। 20 करोड़ की किस्त मिली है। निर्माण कार्य नियत समय पर ही पूरा होगा। - राजेंद्र सिंह, जनसंपर्क अधिकारी इज्जतनगर रेल मंडल

  
865 views
Apr 30 2014 (03:20)
ashalanshu   663 blog posts   1 correct pred (100% accurate)
Re# 1077296-1            Tags   Past Edits
But what about rail bridge on Ganga river at Kachhala?

  
414 views
Apr 30 2014 (08:32)
lipstick spoiler~   1921 blog posts   19 correct pred (79% accurate)
Re# 1077296-2            Tags   Past Edits
maine suna tha ki be-bem route may ki first week se chalu ho jaega

  
884 views
Apr 30 2014 (12:30)
Neelesh Kant Saxena~   368 blog posts   67 correct pred (66% accurate)
Re# 1077296-3            Tags   Past Edits
Eight spans for BEM side has been completed, now they are about to start for 9th span, and one and last ie 10 span for KSJ side still about to replace which would not consume much time. We can say that in May end or June first,, span work would be finished, then only piping, wiring, signal cables, channel sleepers. and rail work would left to be done..

  
1922 views
May 01 2014 (00:10)
ashalanshu   663 blog posts   1 correct pred (100% accurate)
Re# 1077296-4            Tags   Past Edits
In that case, we can hope a CSR survey may be in July end or mid August and possibly from Sept, the rail traffic may resume.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 29
Trains with ARP 15 Dep on: Mon Dec 4
Trains with ARP 30 Dep on: Tue Dec 19
Trains with ARP 120 Dep on: Mon Mar 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.