Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jan 16, 2018 19:41:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jan 16, 2018 19:41:39 IST

Blog Entry# 1364887
Posted: Feb 09 2015 (18:51)

1 Responses
Last Response: Feb 09 2015 (18:51)
  
Rail News
0 Followers
363 views
Rail BudgetSWR/South Western  -  
Feb 09 2015 (07:08)   Bear entire cost of rail projects in future, CM tells Centre
 

rdb*^   133024 news posts
Entry# 1364887   News Entry# 211924         Tags   Past Edits
Chief Minister Siddaramaiah on Sunday urged the Centre to bear the entire cost of railway projects to be implemented in the State in the future and expedite the pending projects.
At the first meeting of the governing council of NITI Aayog in New Delhi, chaired by Prime Minister Narendra Modi, he said that currently the State and the Centre were sharing the cost of the projects equally. “The State has agreed to contribute almost Rs. 10,000 crore in addition to providing the required land,” he said.
The rail network in the State was
...
more...
poor compared to many others and the railway coverage in Karnataka was only 16.9 km per 1,000 sq km, Mr. Siddaramaiah said. “I have requested the Centre to share our burden on the ongoing projects and increase its share to at least two-thirds of the project cost, including the land cost. As regards new projects, the Ministry of Railways should take them up from their own resources. The Centre must step in to play a much larger role in development of railway connectivity by investing more resources,” the Chief Minister said.
Mr. Siddaramaiah said the State had requested the Centre to give concurrence for implementing the Bengaluru suburban rail project to provide sustainable railway connectivity between Bengaluru and other cities/towns in the hinterland. But the request was pending with it. However, the Union government had invested on suburban rail projects in Mumbai and Hyderabad, he added.
Mr Siddaramaiah said the preparation of the 2014–15 State Budget had received a serious setback owing to the Centre’s delay to take a decision on the 14th Finance Commission report, which was submitted in October 2014.

  
790 views
Feb 09 2015 (18:51)
srinivasvasanthi~   4258 blog posts   15 correct pred (54% accurate)
Re# 1364887-1            Tags   Past Edits
Then the Karnataka projects takes 20 years for completion.If the state shares the cost completion of project may be shortened to 4 to 5 years for the benefit of people.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Jan 26
Trains with ARP 15 Dep on: Wed Jan 31
Trains with ARP 30 Dep on: Thu Feb 15
Trains with ARP 120 Dep on: Wed May 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.