Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 17, 2018 09:31:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 17, 2018 09:31:36 IST

Blog Entry# 1364903
Posted: Feb 09 2015 (19:11)

1 Responses
Last Response: Feb 09 2015 (19:11)
  
Rail News
0 Followers
522 views
Rail BudgetSR/Southern  -  
Feb 09 2015 (18:43)   Kerala granted additional Rs 200 crore for railway projects
 

Jayashree   38658 news posts
Entry# 1364903   News Entry# 211978         Tags   Past Edits
Kochi: The state has been granted an additional amount of Rs 200 crore for railway projects as a recognition for utilizing all the money allocated in the railway budget. This is the second consecutive year that the state has been been given additional grants for railway projects.
The state had earlier failed to utilize the full amount allocated in the railway budget, and as a result the funds were diverted to projects in Tamil Nadu.
The allocated funds would be used to complete these projects - Angamali-Sabari track (Rs 3 crore); Punalur-Chenkotta guage
...
more...
transfer (Rs 30 crore); Pollachi-Palakkad, Pollachi-Coimbatore guage transfer (Rs 73 crore), doubling of tracks: Mulanthuruthy-Kuruppunthara (17 crore), Chengannur-Chingavanam (Rs 39 crore), Chingavanam-Kuruppunthara (Rs 22 crore), Haripad-Ambalapuzha (Rs 15 crore); Kochuveli terminal second phase development, and one pit line and 2 stabling lines for Ernakulam marshalling yard (Rs 1 crore).
Officials are confident that the additional grant would add an impetus to the various projects.
The lapsed funds from various parts of the country have been allocated as additional grants to projects that had fully utilized the budget money.
Kerala now needs to utilize the additional amount before March 31.

  
1512 views
Feb 09 2015 (19:11)
srinivasvasanthi~   4259 blog posts   15 correct pred (54% accurate)
Re# 1364903-1            Tags   Past Edits
Really good works are done by the Thiruvananthapuram and Palakkad Division Engineers and staffs .Congrats for getting these additional funds for the Project The Enginners and staffs shall be rewarded on utilization of this funds in time,Since the Engineers and staffs ( themselves ) have been under compulsion to work hard during the day and night times.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jan 27
Trains with ARP 15 Dep on: Thu Feb 1
Trains with ARP 30 Dep on: Fri Feb 16
Trains with ARP 120 Dep on: Thu May 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.