Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jan 18, 2018 22:15:10 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jan 18, 2018 22:15:10 IST

Blog Entry# 1366085
Posted: Feb 11 2015 (00:29)

7 Responses
Last Response: Feb 14 2015 (13:59)
  
★★  Info Update
3 Followers
2139 views
Feb 11 2015 (00:29)  
 

Guest: 7fc2d730   show all posts
Entry# 1366085            Tags   Past Edits
-----------------Website of Indian Railways for monitoring "All Technical Details" of all 3 Phase Locos when they are in Motion----------
The Images attached with this blog is the
1 PAST 2 MONTHS DATA OF LGD WAP 7 30240 in Graphical Format(Screenshot taken in MS Paint)
2 PAST 24 HOURS DATA OF LGD WAP 7 30240 in Graphical Format(Screenshot taken in MS Paint)
These
...
more...
graphs are taken from the Website of "Remote Diagnostic System of Indian Railways" also known as "Indian Railways Fleet Monitoring" which monitors all the "Technical Details" of a WAP 5, WAP 7 & WAG 9 Locomotive while these locos are in motion. The URL of the website is given below:
click here
After clicking on the above link the "Homepage" of "Remote Diagnostic System of Indian Railways" will be opened. If you are a "New User" click on "Sign Up" for Registering in this site. After registering put your "User ID" and "Password" to Log In to this site. The rest of the steps are discussed in the "User Manual" of "Remote Diagnostic System of Indian Railways" which is attached with this blog for the "Ready Reference" of all of you.
Attached Images:
1 PAST 2 MONTHS DATA OF LGD WAP 7 30240 in Graphical Format(Screenshot taken in MS Paint)
2 PAST 24 HOURS DATA OF LGD WAP 7 30240 in Graphical Format(Screenshot taken in MS Paint)
The Variables/Real Time Signals used for above two graphs are:
A.TE/BE Tractive/braking effort of LGD WAP 7 30240( Teac in the Graph and "Green" Color is used in the Graph)
B. Speed of LGD WAP 7 30240 (Speed in the Graph and "Red" Color used in the Graph)
C.Temperature of Bogie 1 of LGD WAP 7 30240 (Tm1temp1 in the Graph and "White" Color used in the Graph)
D.Temperature of Bogie 2 of LGD WAP 7 30240 (Tm1temp2 in the Graph and "Blue" Color used in the Graph)
E.Oil Temperature of Auxiliary Converter1(SR1) of LGD WAP 7 30240(Oiltemp1 in the Graph and "Orange" Color used in the Graph)
In the Graph "Time" is measured horizontally and all other are measured vertically(Range 0 to 500 and 0 to -300)
Please note that if you want to see the "Report" of any Loco in Graphical Format in this website of Indian Railway for last 1 hour/10 hours/24 hours/1 month/2 months you have to choose "Any 5 Real Time Signals" from the available "Real Time Signals". Otherwise you can't get the "Report" of that particular Loco in Graphical format from this Website of Indian Railways.
3 UserManual of "Remote Diagnostic System of Indian Railways" in PDF Format
4 Pic of LGD WAP7 30240 with 12434 Chennai Rajdhani whose Data of Past 2 Months and 24 Hours are given in Graphical format
Source of the Pic: click here
For the Variables/Real Time Signals used for above two graphs please refer the "Handbook of 3 Phase Locomotive" attached with
/blog/post/1355084
Views and Opinions are welcome.
Thanks

2 posts - Wed Feb 11, 2015

2 posts are hidden.

  
720 views
Feb 11 2015 (23:25)
Guest: 6f3d2a32   show all posts
Re# 1366085-5            Tags   Past Edits
great...see the braking action and speed maintained by this WAP 7.....i think they are enough for handling speedy trains in India and govt can insist more on improving tracks and coaches than bullet trains as we have these three phasers

  
625 views
Feb 11 2015 (23:33)
Guest: 7fc2c2bd   show all posts
Re# 1366085-6            Tags   Past Edits
Your Observation is absolutely correct. The "Graph" exactly tells the same story. I also have the same impression and hope in future we should see more three phasers on Indian Railways and as per the latest info available in CLW official website, we have 210+ WAP 7's as yet hope in future this number will increase. We have 550+ WAG 9 this figure will also increase in future. Regarding WAP 5 the figure is 100+ I think. Hope RM will take initiative for introducing more 3 Phasers on IR but for that we have to wait till 26.02.2015 means 15 more days to go.
Let's hope for the best.
Thanks
...
more...
for your useful contribution.

  
656 views
Feb 11 2015 (23:47)
Guest: 6f3d2a32   show all posts
Re# 1366085-7            Tags   Past Edits
i am also hoping the same...i still remember the plan of running trains at 200kmph+ by ex RM Mr Dinesh Trivedi...his approach was very good..i think that has to be considered again...

  
586 views
Feb 11 2015 (23:52)
Guest: 7fc2c2bd   show all posts
Re# 1366085-8            Tags   Past Edits
Exactly. Frankly speaking I also followed the idea of Ex RM Mr Dinesh Trivedi and prepared a "Charter of Demand relating to Budget 2015" in
/blog/post/1342011
Already point 14 and point 21 have been considered by the Railways as yet. Hope all my points will be considered in the ensuing Rail Budget to be tabled on 26.02.2015.
Attached Image
...
more...
Planning of actual and budgeted cost
Source of the image: click here

  
896 views
Feb 14 2015 (13:59)
Railfan Bilaspur~   1932 blog posts   2911 correct pred (66% accurate)
Re# 1366085-9            Tags   Past Edits
great observations
thankxx.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jan 28
Trains with ARP 15 Dep on: Fri Feb 2
Trains with ARP 30 Dep on: Sat Feb 17
Trains with ARP 120 Dep on: Fri May 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.