Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Nov 19, 2017 23:51:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Nov 19, 2017 23:51:59 IST

Blog Entry# 1366428
Posted: Feb 11 2015 (12:51)

26 Responses
Last Response: Feb 22 2015 (20:24)
  
General Travel
0 Followers
4382 views
Feb 11 2015 (12:51)   BGP/Bhagalpur Junction (6 PFs)
 

अमित झा*^~   7333 blog posts   118 correct pred (66% accurate)
Entry# 1366428            Tags   Past Edits
wish list for Bhagalpur Staion in this Rail Budget..
1- BGP-HWH Express via SBG (tri weekly)
2- BGP-HWH JanShatabdi Exp (Daily via JMP-KIUL)
3- BGP-TATA Exp
4- BGP-NGP Exp (bi weekly)
...
more...

5- BGP-MAS Exp (weekly)
6- BGP-ASR Exp ( bi weekly)
7.- BGP-GAYA Exp (overnight Daily)
Extensions/increase Frequency --
1.- extend BGP-NDLS Exp till Katra
2.- extend BGP-RNC Exp till MLDT
3.- increase frequency of BGP-AII Exp to bi weekly
4.- increase frequency of BGP-ANVT GR to 5 days a week..
5.- increase frequency of ANGA Exp weekly to 4 days a week...
(as GR coaches is no longer in production they (NR) can use old ICF coaches of Rajdhani for its 2nd rake)
(as BGP-NDLS n BGP-AII exp has RSA they ER has to give 2 extra rake for seperate extended run)
i know demands karna aasan hai aur train milna muskil still meri demands ye hain ;)
n better increase seat quota in 12424/23 DBRT Rajdhani rather than divert a weekly Rajdhani via BGP.. :P

2 posts - Fri Feb 13, 2015

2 posts - Sun Feb 15, 2015

5 posts - Wed Feb 18, 2015

1 posts - Thu Feb 19, 2015

1 posts - Fri Feb 20, 2015

10 posts - Sat Feb 21, 2015

  
812 views
Feb 21 2015 (19:11)
विश्व नाथ*   16775 blog posts   268 correct pred (76% accurate)
Re# 1366428-22            Tags   Past Edits
Till date IR failed to utilize new section as per their usefulness :
SPJ-KGG
SPJ-RXL-NKE-GKP
KIUL-GAYA
and also failed to create new BG sections to ease pressured sections.
Let's
...
more...
see what comes for this no where to no where bridge.
Yes the bridge can be ery usefull when BGP to Rampurhat and JSME section becomes operational.

  
792 views
Feb 21 2015 (19:19)
MGR JMP twin cities   377 blog posts   4 correct pred (57% accurate)
Re# 1366428-23            Tags   Past Edits
most ilogical part of the munger ganga bridge is that despite having space for double line it has single line.constructing another track would have cost around 80 cr more.the present cost of bridge is around 2400 cr including 10 m road on upper deck.if ir fails to utilise this bridge means they are simply wasting huge public money.with this cost a 6-lane Patna-Bhagalpur expressway would have been constructed.only better part is y-link on both sides.

  
1245 views
Feb 22 2015 (18:34)
LHB Vikramshila A Dream Come True~   8934 blog posts   58976 correct pred (92% accurate)
Re# 1366428-24            Tags   Past Edits
Yeah thats very strange seeing the poor condition of Hathidah(Mokama) Bridge.

  
1270 views
Feb 22 2015 (19:04)
Rahul K😎🚂~   2662 blog posts   2043 correct pred (77% accurate)
Re# 1366428-25            Tags   Past Edits
Agree brother.. Hope to see maximum utilization of this new bridge from next year.. And some new trains and route change of few existing NFR bound trains via MGS-GAYA-KUIL-MGR-KIR.. Required to decongest Mokama bridge, MGS-BJU Section and PNBE station..

  
1272 views
Feb 22 2015 (20:24)
MGR JMP twin cities   377 blog posts   4 correct pred (57% accurate)
Re# 1366428-26            Tags   Past Edits
if gaya-kiul section gets doubled in near future then the route via KIR-MGR-KIUL-GAYA-MGS-BSB WILL BECOME BIG HIT.mokama bridge is already 45 yrs old and is in very dipiliated condition.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 29
Trains with ARP 15 Dep on: Mon Dec 4
Trains with ARP 30 Dep on: Tue Dec 19
Trains with ARP 120 Dep on: Mon Mar 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.