Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jan 23, 2018 06:20:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jan 23, 2018 06:20:39 IST

Blog Entry# 1782055
Posted: Mar 28 2016 (11:36)

12 Responses
Last Response: Mar 30 2016 (10:27)
  
★★★  General Travel
2 Followers
3943 views
Mar 28 2016 (11:36)   GZB/Ghaziabad Junction (6 PFs)
 

Guest: 7fc2cfad   show all posts
Entry# 1782055            Tags   Past Edits
Ref : /blog/post/1780789
/blog/post/1777122
/blog/post/1779433
********* Installation of HOG System in Normal WAP-7 Locomotives **********
As we all know that HOG Provision is kept in every WAP-7 Class of Loconotives. So,
...
more...
I think Indian Railways can install HOG System(Head On Generation System) in their existing Normal WAP -7 Locomotives of Various Sheds & Zones(Non HOG WAP-7s) as per requirement. If this is done then it won't be required to produce New HOG WAP-7 all the Time & it will be COST Effective also as Indian Railways is concerned.
Now HOG WAP-7 has great demand so IR can adopt this Procedure to equip their Normal WAP-7 with HOG System as per requirement which will avoid the Time of Commissioning of New HOG WAP-7 as existing Normal WAP-7 can easily be commissioned after Installation of HOG system in the same.
Views are welcome !!!!
Attached Image Link: click here
Credits of attached Video: Pranav Chaware

5 posts - Mon Mar 28, 2016

2 posts - Tue Mar 29, 2016

  
1358 views
Mar 29 2016 (09:24)
Guest: 7fc2c2b0   show all posts
Re# 1782055-14            Tags   Past Edits
Hope CLW will soon get Composite Converter for WAP-5 so that it can be HOG Enabled.

  
1233 views
Mar 29 2016 (14:17)
cosyindia108*^~   1002 blog posts   1566 correct pred (58% accurate)
Re# 1782055-17            Tags   Past Edits
once wap-7 hog system is success ., then let rajdhani & duranto retain 2 p.c., and 2 e.o.g. be reconverted with passenger berths ., and guards be part of same in 1/3rd of coach , this will increase berths by about 120 per rack '' on fully electrified routes ''

  
Mar 29 2016 (14:22)
HOG WAM4 WAP1~   3230 blog posts
Re# 1782055-18            Tags   Past Edits
One power car is still compulsory even for HOG locos. The second EOG car will also be most likely retained as a backup.

  
Mar 29 2016 (22:43)
HOG WAM4 WAP1~   3230 blog posts
Re# 1782055-27            Tags   Past Edits
It's puzzling why CLW delayed the HOG addition to WAP4's so much. The three phasers at least provided several challenges to CLW initially that had to be solved before even using the loco for normal operations ( Both P7 and P5 had so many initial struggles) and so it's understandable that these new enhancements took some time to materialize. The WAP4 design was something CLW was very familiar with and there was nothing new for them to worry about. They should have come out with a HOG system for it long ago!

  
1112 views
Mar 30 2016 (10:27)
❤️ ⚡ WAP5™ ⚡ ❤️   7027 blog posts   278 correct pred (91% accurate)
Re# 1782055-28            Tags   Past Edits
Another irony : P5 already had extra windings in its main transformer for the provision of HOG. It only required a 'converter'. But IR never made use of it :P. Only now, they made its composite converter although it was proposed in 2012. We're still yet to see its HOG variant rolling out.
P4's HOG is still under research BTW and in due course of time, it'll be equipped with HOG converter.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Feb 2
Trains with ARP 15 Dep on: Wed Feb 7
Trains with ARP 30 Dep on: Thu Feb 22
Trains with ARP 120 Dep on: Wed May 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.