Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 24, 2018 05:33:11 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 24, 2018 05:33:11 IST

Blog Entry# 1782331
Posted: Mar 28 2016 (15:09)

2 Responses
Last Response: Mar 28 2016 (15:35)
  
Rail News
0 Followers
899 views
NFR/Northeast Frontier  -  
Mar 28 2016 (15:07)   Sudden splash of rain collapsed 800 metre long Platform at Dharmanagar railway station : use of poor quality material allegedly led to this disastrous
 

deepakrashikendra~   285 news posts
Entry# 1782331   News Entry# 262697         Tags   Past Edits
AGARTALA, March 28 (TIWN): A few hours of moderate rain on Monday morning has collapsed the 800 meter long boundary wall of the Dharmanagar railway platform which has created much turmoil among the common people. Reportedly, Dharmanagar railway station was earlier alleged of using poor material in the construction work, due to bad maintenance and lack of supervision under the observation of Engineer Chittaranjan Paul. With the collapse of railway platform resentment has brewed among the common people of Dharmannagar. Reportedly, 2 high officials including DCM B.K.Misra, R . K Mandal DOM visited here in Dharmanagar rail station on Saturday as a part of inspection and took a survey of various works. Sources said that officials expressed displeasure about the track works and also other ongoing works. Many works however still not over at Dharmanagar railway station including few tracks also. In compare to the Agartala rail station, Dharmanagar rail station...
more...
works are not progressing rapidly. Whereas all the railway works held in Tripura are in good shape but in Dharmanagar rail station the work was undergoing little slow and allegation were coming for poor construction work, until the North Eastern officials had inspected the rail station.From control room to the tracks laid at there had been inspected, but they expressed displeasure after the inspection.
However allegation has also raised earlier by the locals that the filling work which was going on at that station seemed of poor quality. Due to lack of proper observation the working quality has became low.
Moreover, many parts of the Dharmanagar railway station, which were constructed long back ,tracks are suffering from lack of maintenance. However, after the inspection the worker now has speeded up their works and the works are going in full swing.
Today with the collapse of Railway platform huge resentment has raised among the local
-

  
2049 views
Mar 28 2016 (15:09)
deepakrashikendra~   1209 blog posts
Re# 1782331-1            Tags   Past Edits
standard construction practices are not being followed.

  
2072 views
Mar 28 2016 (15:35)
Kishor*^~   4692 blog posts   124 correct pred (63% accurate)
Re# 1782331-2            Tags   Past Edits
When Standard Corruption Practices are followed, Contractor has to forego Construction Practice

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Feb 3
Trains with ARP 15 Dep on: Thu Feb 8
Trains with ARP 30 Dep on: Fri Feb 23
Trains with ARP 120 Dep on: Thu May 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.