Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Nov 21, 2017 13:58:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Nov 21, 2017 13:58:03 IST

Blog Entry# 1782873
Posted: Mar 29 2016 (07:51)

4 Responses
Last Response: Mar 29 2016 (16:34)
  
Other News
Mar 28 2016 (17:59)   Power-run trains to ply from April
 

Jayashree ❖ Amita*^   38182 news posts
Entry# 1782873   News Entry# 262724         Tags   Past Edits
Rayagada: The railways is all set to ply electricity-run trains on Vizianagaram-Titilagarh railway line via Rayagada from April.
The electrification work of the 265 km stretch that continued for last one year by the East Coast Railways (ECoR) has reached the final stage. Senior officials of the department are monitoring the process to ensure that the work gets finished before the deadline.
An electricity-powered train engine that was started from Parbatipuram in Andhra Pradesh on an experimental basis reached Rayagada station Saturday without any hitch.
Railways
...
more...
security officer Sudarshan Nayak, CPD Basudev Panda, railways’ department Walter division employees and electricians travelled in the train from Parbatipuram to Singapur of Rayagada and inspected the electrification work. 
A special transformer has been set up at Saipriya Nagar level-crossing to supply electricity for plying of trains. The power department has also set up power houses at Titilagarh, Muniguda, Kesinga of Rayagada and Vizianagaram, Bobali and Parbatipuram of Andhra Pradesh.
Residents of the area are elated as the electricity-run trains will provide respite from air and noise pollution being caused by diesel run trains over decades.

  
765 views
Mar 29 2016 (07:51)
SCR Godavari Express~   2717 blog posts   12 correct pred (93% accurate)
Re# 1782873-1            Tags   Past Edits
Good news.. good work by EcoR.. Any proposal or tenders for electrification of remaining stretch Titlagarh to Raipur section...?

  
678 views
Mar 29 2016 (08:20)
Afraaz suhail 🚂🚄🚅^~   4482 blog posts   576 correct pred (87% accurate)
Re# 1782873-2            Tags   Past Edits
Yes a important work

  
539 views
Mar 29 2016 (15:31)
SCR Godavari Express~   2717 blog posts   12 correct pred (93% accurate)
Re# 1782873-3            Tags   Past Edits
It will be completely useful only if the remaining stretch till raipur is also electrified?

  
474 views
Mar 29 2016 (16:34)
Afraaz suhail 🚂🚄🚅^~   4482 blog posts   576 correct pred (87% accurate)
Re# 1782873-4            Tags   Past Edits
Even till sbp

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 1
Trains with ARP 15 Dep on: Wed Dec 6
Trains with ARP 30 Dep on: Thu Dec 21
Trains with ARP 120 Dep on: Wed Mar 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.