Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jan 18, 2018 14:13:38 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jan 18, 2018 14:13:38 IST

Blog Entry# 1783339
Posted: Mar 29 2016 (13:44)

7 Responses
Last Response: Mar 31 2016 (23:46)
  
★  General Travel
0 Followers
4804 views
Mar 29 2016 (13:44)   13351/Dhanbad - Alappuzha (Bokaro) Express (PT) | DHN/Dhanbad Junction (8 PFs)
 

nilabh89^~   415 blog posts   2624 correct pred (95% accurate)
Entry# 1783339            Tags   Past Edits
It is a great move by the railways to introduce an extra 3AC in Tata-Alleppey exp considering the popularity of this train.......now its time that Dhanbad division should also consider this and add an extra 3ac in the Dhanbad-Alleppey rake............this train like its slip rake runs jam packed throughout the year & is the sole connectivity between Dhanbad,bokaro,ranchi to southernmost parts of India.......Just 1 3ac is insufficient to cater to such a large pool of passengers.......therefore the need of the hour is that an extra 3ac would be very much of a relief to tourists & patients travelling south..........suggestions welcome........

2 posts - Tue Mar 29, 2016

  
Mar 31 2016 (12:04)
Rail Fanning~   2985 blog posts
Re# 1783339-3            Tags   Past Edits
Yes agree with the same. Ideal solution is to separate the trains. The railways have been constantly rejecting this proposal and it could be due to some of the following challenges faced
• Availability of rakes. At least 6 rakes in each of the trains required.
• Getting the right time table slot for each of the trains separately since it travels through so many diff zones. It is almost like starting a new daily train !!!
• Since
...
more...
these 2 trains already run daily and that too for such a long distance, it will present another additional challenge. Had the trains been bi weekly or tri weekly, it may not have so much of issues but getting 2 separate daily trains and that too with separate time slots is always a challenge

  
2807 views
Mar 31 2016 (13:41)
docdiablo23*^~   1117 blog posts   4790 correct pred (77% accurate)
Re# 1783339-4            Tags   Past Edits
The Dhanbad one can run on the existing route while the TATA slip can be made to run via Kharagpur-BBSR-VSKP...
The proposal was there for many years but still yet to see the light of the day. The maintenance standards of these trains have to improve too.

  
2721 views
Mar 31 2016 (14:54)
Rail Fanning~   2985 blog posts
Re# 1783339-5            Tags   Past Edits
Yes this proposal was there for long. I have heard another version from one of the pantry staff once wherein it was said while the DHN-Allp will continue with its existing run, the Tata Allp train was proposed to be extended till Trivandrum. One reason being mentioned for not having separate rakes was Tata lacking full fledged facility of a dedicated yard/pit line where multiple trains with more than 18-19 coaches can be stationed daily

  
3631 views
Mar 31 2016 (22:54)
nilabh89^~   415 blog posts   2624 correct pred (95% accurate)
Re# 1783339-6            Tags   Past Edits
If delinking of the above trains is difficult then railways should try to start one bi weekly or weekly train from dhanbad through bokaro ranchi to south india with better speed & more coaches because the present train is just not able to cover the rush. ....

  
3508 views
Mar 31 2016 (23:46)
★★★★ Niket Karan ★★★★^~   6340 blog posts   12 correct pred (100% accurate)
Re# 1783339-7            Tags   Past Edits
Few months ago I had read in a newspaper about introduction of a new train between Hatia and Ernakulam but it's still not announced :(

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jan 28
Trains with ARP 15 Dep on: Fri Feb 2
Trains with ARP 30 Dep on: Sat Feb 17
Trains with ARP 120 Dep on: Fri May 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.