Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Jul 25, 2017 00:11:21 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Jul 25, 2017 00:11:21 IST

Blog Entry# 1834583  
Posted: May 06 2016 (07:08)

1 Responses
Last Response: May 06 2016 (07:08)
  
Rail News
0 Followers
462 views
Commentary/Human Interest
May 06 2016 (05:22)   Re-Designing of Railway Coaches
 

rdb*^   130889 news posts
Entry# 1834583   News Entry# 266918         Tags   Past Edits
Re-designing of coach sub-assemblies and components is continually undertaken by RDSO (Research Designs and Standards Organisation) and Design centers of coach Production Units of Indian Railways. In the recent past, following major projects for redesigning of coaches were undertaken: -
• Linke Hofmann Busch (LHB) Air-Conditioned (AC) coach to LHB non-AC variant coaches viz. LHB non-AC Sleeper, and LHB second class sitting coaches.
• LHB AC single deck Chair Car coach to LHB AC Double Decker Chair Car coach with higher carrying capacity.
• LHB
...
more...
Power Car to LHB luggage cum Guard Van with underslung Diesel alternator set.
• Non-AC Electric Multiple Unit (EMU) rakes to AC EMU rakes for Mumbai suburban area.
• Mainline Electric Multiple Unit/Diesel Electric Multiple Unit (MEMU/DEMU) Trailer Coaches (TC) without toilet to TC jcoaches with toilets.
• Diesel fuel based Power Car for DEMU to Compressed Natural Gas (CNG) fuel based Power Car.
• General DEMU coaches to Jammu and Kashmir (J&K) DEMU coaches with modified seating layout and heating arrangement.
• Redesigning of interiors of conventional Integral Coach Factory (ICF) design coaches to develop model rake coaches inducted in Mahamana Express.
While no specific allocation is made for research on re-design of coaches, under Plan Head Railway Research, around ₹ 2.81 crores were allotted by RDSO in the last 3 years, i.e., 2013-14 to 2015-16 for development of various design related projects. National Institute of Design has not yet designed any coach for Indian Railways. Indian Railways had rolled out LHB type coaches under Transfer of Technology agreement with M/s Alstom, Germany. These coaches with superior interiors, are much safer and have higher speed potential of upto 160 kmph. Around 3150 coaches have already been inducted into service. Indian Railways have planned for ntroduction of modern, State-of- Art distributed powered 15 EMU train sets having sleeper coaches or chair cars. These train sets will reduce journey time with better riding experience.
This Press Release is based on information given by the Minister of State for Railways Shri Manoj Sinha in a written reply to a question in Lok Sabha on 04.05.2016 (Wednesday).
****
AKS/MKV/AK/DK
(Release ID :144830)

  
1098 views
May 06 2016 (07:08)
rdb*^   31572 blog posts   381400 correct pred (81% accurate)
Re# 1834583-1            Tags   Past Edits
Good info!

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Aug 4
Trains with ARP 15 Dep on: Wed Aug 9
Trains with ARP 30 Dep on: Thu Aug 24
Trains with ARP 120 Dep on: Wed Nov 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.