Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 18, 2017 12:19:05 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 18, 2017 12:19:05 IST

Blog Entry# 1835333
Posted: May 06 2016 (15:36)

1 Responses
Last Response: May 06 2016 (15:36)
  
Rail News
0 Followers
823 views
INT/International  -  
May 06 2016 (14:57)   Pakistan Railways evolves plan to induct 281 Locomotives in 8 years
 

Bhiwani*^   3628 news posts
Entry# 1835333   News Entry# 267008         Tags   Past Edits
Islamabad: Due to sheer negligence of Railway authorities more than 163 locomotive of Pakistan Railways (PR) become redundant, while on the other hand Pakistan Railways has worked out a plan to purchase 281 locomotives in the next 8 years.
Under the plan loco motives having capacity ranging between 2000 to 4000 Horse Power (HP) will be purchased that include 161 locomotives of 4000 HP capacity, 75 of 3000 HP and 45 of 2000 HP will be purchased among these 281 locomotives.
According to documents available with Daily Times, Pakistan Railways will purchase 55
...
more...
locomotives of 4000 HP during 2016-17, 20 locomotives of 2000 HP and 6 locomotives of 4000 HP during 2017-18, 35 locomotives of 4000 HP, 25 locomotives of 3000 HP, 10 locomotives of 2000 HP during 2018-19, 25 locomotives of 4000 HP will be purchased during 2019-20.
As many as 25 locomotives of 4000 HP will be inducted in Railways during 2020-21, 15 locomotives of 4000 HP, 15 locomotives of 2000 HP during 2021-22, 25 locomotives of 3000 HP during 2022-23 and 25 of 3000 HP will be inducted in railways during 2023-24.
Contract agreement for purchase of 55 locomotives of 4000 HP has been signed with GE Company of USA while international tender has been floated for purchase of 20 D.E Locomotives of 2000 HP. Likewise PC-1 for purchase of 6 locomotives of 4000 HP has been sent for approval. Revised PC-1 in respect of 150 locomotives has been approved.
The documents reflected that Pakistan Railways is having 443 engines of 1500-3000 HP capacity presently and 280 among them are functional and 163 are non-functional. More 185 engines will complete their life and become redundant in next 4 years. 76 locomotives out of 443 locomotives have been purchased from GE company, 114 General Motors,, 69 Hitachi, 52 ALCO (USA), 69 Dalian (China) and 63 have been purchased from Ziyang (China).

  
2007 views
May 06 2016 (15:36)
visluc1991~   256 blog posts   65 correct pred (68% accurate)
Re# 1835333-1            Tags   Past Edits
Great news for revival of Pakistan railways, railway minister said rafique is quite hard working and doing great work, big salute to him.
It is also interesting to know that Pakistan is buying the same GE tier 4 locomotives which India has selected for its Western dfc, so that in future they can buy spare parts from us( if they want)instead of importing from America.. Really a smart move from pml government.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Nov 28
Trains with ARP 15 Dep on: Sun Dec 3
Trains with ARP 30 Dep on: Mon Dec 18
Trains with ARP 120 Dep on: Sun Mar 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.