Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jan 21, 2018 06:09:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jan 21, 2018 06:09:33 IST

Blog Entry# 1885419
Posted: Jun 08 2016 (13:01)

3 Responses
Last Response: Jun 08 2016 (16:46)
  
Rail News
0 Followers
1599 views
Other News
Jun 08 2016 (12:52)   Bullet Train Project Hits First Snag, Maharashtra Government Opposes Construction Of Mumbai Station
 

Jayashree   38675 news posts
Entry# 1885419   News Entry# 270349         Tags   Past Edits
The Ahmedabad-Mumbai bullet train project, the first of its kind in India has hit its first roadblock. And that too from a 'friend', the Maharashtra government. 
YouTube/ Representative Image The Devendra Fadnavis government has opposed the railways constructing one of the most crucial links in the corridor- the Mumbai station. The government raised objection to the proposed underground station at Bandra-Kurla complex claiming that the station would hamper its plans to build a financial centre at the same place, The Indian Express has reported.
PTI The site for the station was identified by
...
more...
a Japanese company who is the consultant in the project after speaking with state government.  Maharashtra government has reportedly  told Railways that the station, which will come  at the expense of the financial centre will lead to a revenue loss of Rs 10,000 crore for the state. Despite the railway authorities telling that the proximity of the bullet train corridor will only enhance the potential of the financial centre the state government remains unconvinced.  
Mumbaimag The government has also pointed out that only a small portion of the Rs 98,000-crore bullet train project passes through the state and such a large revenue loss cannot be justified. The bullet train project, one of the biggest infrastructure projects in India was first proposed in 2009, and was later given priority by the Modi government. The 508 kilometer line will have a total of 11 stations and will have a travel time of around two hours. 
PTI Last week Railway Minister Suresh Prabhu said the first bullet train will begin service in 2023.

  
1844 views
Jun 08 2016 (13:01)
riz339~   2923 blog posts   125 correct pred (51% accurate)
Re# 1885419-1            Tags   Past Edits
Bad politics

  
1495 views
Jun 08 2016 (16:36)
AK84~   2380 blog posts   2759 correct pred (76% accurate)
Re# 1885419-2            Tags   Past Edits
"Hapoos" mai jyada fayda hai toh "Dashari" aam kyu lagaye Maharashtra Govt.
loss of 10000 crore is too much!!

  
1863 views
Jun 08 2016 (16:46)
simplelive   246 blog posts   554 correct pred (60% accurate)
Re# 1885419-3            Tags   Past Edits
Right decision. it should be shifted either VIRAR OR kALYAN AND KALYAN AND VIRAR SHULB BE DIRECT CONNECTED.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jan 31
Trains with ARP 15 Dep on: Mon Feb 5
Trains with ARP 30 Dep on: Tue Feb 20
Trains with ARP 120 Dep on: Mon May 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.