Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jul 22, 2017 22:29:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jul 22, 2017 22:29:30 IST

Blog Entry# 1885659  
Posted: Jun 08 2016 (16:05)

1 Responses
Last Response: Jun 08 2016 (16:05)
  
Rail News
0 Followers
1028 views
Other NewsMMOPL/Mumbai Metro  -  
Jun 08 2016 (14:55)   Mumbai Metro to go 'green' in a big way
 

Jayashree   36962 news posts
Entry# 1885659   News Entry# 270367         Tags   Past Edits
As part of its second anniversary celebrations, Mumbai Metro One announced it will go "green" in a big way by harnessing solar energy, switching over to LED lights and other measures, an official said on Tuesday.
A subsidiary of Reliance Infrastructure Ltd, the Mumbai Metro One Pvt. Ltd (MMOPL) will exploit solar energy for meeting a part of its running needs, and switch over to LED (light-emitting diode) at all metro stations, its depots and administrative building to reduce electricity consumption.
Rooftop solar panels will be installed at four locations on the MMOPL's
...
more...
depot and at all the 12 stations on the Versova-Andheri-Ghatkopar line, which is the first metro railway serving Mumbai, connecting the eastern and western suburbs.
The initiative is a part of Mumbai Metro One's "Go green go clean" campaign launched to mark second anniversary, on Wednesday, of the 11.40 km long line.
The entire solar power generating system will have an installed capacity of 2.3 MW, out of which about 2 MW will be produced from the rooftop installations at stations and remaining from the panels set up at the depot.
The electricity generated from the solar panels will be utilized for non-traction use in activities like lighting, air-conditioning and maintenance.
Mumbai Metro's auxiliary power requirement for non-traction use is 6.9 MW, 30 per cent of which will be met with solar energy once the system is up and running.
The work on setting up rooftop solar panels will begin soon and take about six months to complete, the spokesperson said.
A total conversion of all lighting at Mumbai Metro One's depot, administrative buildings and stations to LED lamps will also be undertaken simultaneously and is expected to cut the consumption on lighting by half.
"MMOPL is already an eco-friendly mode of transportation and provides the cleanest and safest ride to the commuters. As a responsible and conscientious mass rapid transport (MRT) utility, it is our endeavour to reduce our carbon footprint as far as possible. Our initiative to harness solar power for meeting a part of our electricity requirement is to reinforce our commitment to the green cause," the spokesperson added.
The company said it had taken a conscious decision to adopt green practices right at the stage of conceptualization.
The MMOPL's automatic wash plant utilizes about 1,200 litres of water for washing each train out of which, about 1,000 litres (85 per cent) of water is collected and recycled for reuse. Only 200 litre of water (15 per cent) is dispersed due to wind and high pressure jets that are used for cleaning.
It implemented an innovative design idea by installing the wash plant on an elevated ramp and locating the water recycle plant right underneath it, which adds to the efficiency of water collection.
MMOPL has also slashed its water consumption for cleaning inside train compartments by a whopping 90 per cent from an earlier 200 litres to just 20 litres for each train.
"This was achieved through a durable epoxy coating on the train floors, which repels dust and dirt and is easier to wash. Due to the special floor coating, the train compartments do not require heavy washing any more," the spokesperson said.
By Wednesday, a whopping 18.30 crore commuters would have travelled on Mumbai Metro One in the past two years with maximum footfalls in Ghatkopar and a 99 per cent punctuality rate.

  
2094 views
Jun 08 2016 (16:05)
simplelive   245 blog posts   554 correct pred (60% accurate)
Re# 1885659-1            Tags   Past Edits
Not only Mumbai metro to going green also Mumbai will be less polluted as Gravity basted traveling system getting installed at many places as trial basis within five year.Traveling and sky walk travel fun both one time. in this method big tower will be used. thru lift public passenger will go to the tower and ride sky traveling.
in this new gravity based journey new magnetic technology (which used in bullet)meglev track will be used to boost speed. it will take one or two minute for two km journey. first trail range will be 1 km and two km.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Aug 1
Trains with ARP 15 Dep on: Sun Aug 6
Trains with ARP 30 Dep on: Mon Aug 21
Trains with ARP 120 Dep on: Sun Nov 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.