Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Oct 20, 2017 10:51:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Oct 20, 2017 10:51:39 IST

Blog Entry# 1948456
Posted: Aug 01 2016 (14:49)

1 Responses
Last Response: Aug 01 2016 (14:49)
  
Rail News
0 Followers
356 views
New Facilities/Technology
Aug 01 2016 (13:52)   Railways to shortly float expression of interest for levitation trains; meeting with manufacturers on 2 September - Infracircle
 

For Better Managed Indian Railways~   948 news posts
Entry# 1948456   News Entry# 275584         Tags   Past Edits
Gearing up for its meeting with the global ultra-high-speed train manufacturers on 2 September, the Indian Railways will shortly issue an expression of interest (EoI) to design and develop ultra-high-speed rail levitation technology in the country.
The national carrier aims to increase the average speed of trains to ease congestion and attract traffic on the railways network, thereby increasing its freight and passenger revenues.
The EoI is aimed to promote domestic manufacturing and is part of the National Democratic Alliance government’s ‘Make in India’ strategy. The EoI will invite agencies to discuss the
...
more...
concept and establish a development process under the public-private-partnership mode.
“First we want to know what all is coming up. The scope here is huge—there is first-generation Maglev and then there’s second generation. There are also hyperloop trains—so we have quite a few options. The EoI is for all types of levitation trains,” said a railway ministry official requesting anonymity.
InfraCircle on 19 July reported about the national carrier’s plans to scout for ultra-high-speed rail technology.
“The idea is that we need to create the opportunity within the country, maybe in 10-15 years, and make a breakthrough in this space so that India can benefit. We intend to start on this now. The conference will be along these lines. We have given a brief to the railway minister (Suresh Prabhu) and we will issue the EoI in a day or two,” said the official quoted above.
This comes at a time when the Indian Railways has also signed an agreement with Japan entailing an investment of Rs.97,636 crore to run a bullet train using Shinkansen technology. India is also experimenting with the Spanish Talgo, which is currently under trials.
“We will be inviting a number of knowledge holders such as national and international universities, manufacturers and researchers. We want to attract any reputed agency which will come forth with its investors, designers and a concept, and show that concept to us,” said the official.
Maglev stands for magnetic levitation, and is a transport system that uses magnetic levitation to suspend and propel vehicles with magnets without touching the ground.
“We are going to issue an EoI for calling levitation train knowledge holders but all these things are at a conceptual stage. The plans may materialise in more than a decade down the line,” another senior official, who also did not want to be named, at the ministry of railways said.
Queries emailed to a spokesperson of the ministry of railways on 28 July remained unanswered.
According to experts, although it is imperative for the national carrier to keep pace with modern technology, the financial viability of such projects must also be considered carefully.
“When technology is progressing, we should always try to keep pace with it. But financial viability is also a crucial aspect for any organisation. If it is not financially viable, the railways must also find out how the viability gap funding can be arranged as these are very costly propositions. A seminar is the right place for the railways to discuss all these points,” said former chairman of the Railway Board, Vivek Sahai.
The Indian Railways plans to invest Rs.8.5 trillion in the next five years with a total capital for infrastructure for the current financial year set at Rs.1.21 trillion.
Of late, the railways has been losing traffic to roads and air routes. For financial year 2015-16, the railways earned a revenue of Rs.45,384 crore from passenger traffic against a target of Rs.50,175 crore. The target for the current financial year has been set at Rs.51,012 crore.

  
1171 views
Aug 01 2016 (14:49)
For Better Managed Indian Railways~   1933 blog posts
Re# 1948456-1            Tags   Past Edits
It is always better to plan and take steps in advance so as to be ready to meet the anticipated long term future challenges/requirements.
Magnetic levitation technology is much costlier than Bullet train technology and is still evolving. It is possible that the ongoing research in superconductivity may give a breakthrough and make the Maglev technology techno-economically beneficial than BT technology.
Even in long term future say 15-20 years, in spite of having very limited network of costly maglev trains, India can become a manufacturing hub for supply of such trains
...
more...
to rich nations.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Oct 30
Trains with ARP 15 Dep on: Sat Nov 4
Trains with ARP 30 Dep on: Sun Nov 19
Trains with ARP 120 Dep on: Sat Feb 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.