Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 17, 2017 15:56:34 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 17, 2017 15:56:34 IST

Blog Entry# 1948776  
Posted: Aug 01 2016 (20:12)

2 Responses
Last Response: Aug 02 2016 (00:36)
  
Rail News
0 Followers
761 views
New Facilities/Technology
Aug 01 2016 (20:08)   Talgo train’s final phase of trials to run on Delhi-Mumbai route aiming 130 kmph
 

deepakrashikendra~   274 news posts
Entry# 1948776   News Entry# 275628         Tags   Past Edits
Spanish-made train Talgo will commence its third and final phase of trials on Monday from Delhi to Mumbai aiming a maximum speed of 130 kmph and is expected to reach the financial capital in about four hours less than the time taken by Rajdhani.
Talgo aims to cut the travel time between Delhi and Mumbai to 12 hours. The train with nine lightweight coaches will start its journey at 7.55 PM from New Delhi station and is expected to reach Mumbai at about 8.31 AM in the morning.
“This is the timing trial
...
more...
and we want to find out how much time it is likely to save if we allow such type of coaches to run on our track. Four such trials will take place with speed ranging from 130 kmph to 150 kmph,” Railway Board Member (Mechanical) Hemant Kumar told PTI.
The second trial will be held on August 5, the third on August 9 and the fourth and final on August 14. “First trial will be at 130 km per hour today and the train is expected to take 12 hours 36 minutes to reach Mumbai. While Rajdhani takes 16 hours, this is expected to take four hours less to reach Mumbai,” Kumar said.
He said since the train is lighter, and takes lesser time for acceleration and deceleration on curves. “This is our time trial. We had already done the safety trial between Palwal and Mathura where we had gone upto 180 kmph both loaded and empty run,” he added.
The second trial between Delhi and Mumbai will also be at 130 kmph and in the third trial, the train will be allowed to run at a higher speed of 140 kmph.
Watch Video: What’s making news
“Then the fourth trial will be at 150 kmph with higher speed on the curves. We expect that it is likely to take 11 hours 30 minutes at 150 kmph to reach Mumbai,” he said. Railways had conducted the first trial run of Talgo trains on the Bareilly-Moradabad stretch in Uttar Pradesh in May. The second trial run was conducted on the Palwal-Mathura section of the North-Central Railway.
However, Kumar said the train cannot be used on Indian Railways in its present form. “This has got lower platform height and in this form it cannot be used. After trial if we decide to go for it then we have to find ways and means as to how to go about it,” he said.
The nine-coach Talgo train consists of two Executive Class cars, four Chair Cars, a cafeteria, a power car and a tail-end coach for staff and equipment. Currently, the super-fast Rajdhani Express train takes around 16 hours to complete the 1,384 km stretch between New Delhi and Mumbai.
The Mumbai Central-New Delhi Rajdhani Express has an average running speed of nearly 91 kmph and it can attain a top speed of 130 kmph. Hauled by a 4,500 HP diesel engine, Talgo coaches are lightweight and designed in a way that they can run on curves without decelerating.
A team of Spanish officials along with railway officials and experts from Research Designs and Standards Organisation (RDSO) will be present onboard during the trial. Shipped from Barcelona, the Talgo aluminium coaches
anchored at Mumbai port on April 21. After the successful launch of semi-high speed (160 kmph) Gatimaan Express on the Delhi-Agra route in April, Talgo trial is being conducted as part of Indian Railway’s strategy to increase the speed of trains.
According to the plan, Talgo trains are expected to be first pressed into service on Delhi-Mumbai sector. Besides reducing travel time, Talgo’s lighter trains consume 30 per cent less energy.

  
1068 views
Aug 01 2016 (20:12)
deepakrashikendra~   1115 blog posts
Re# 1948776-1            Tags   Past Edits
@130 kmps the train should take around 15hrs.
@150kmps the train may take around 13 Hrs.

  
1515 views
Aug 02 2016 (00:36)
Divyanshu Gupta   42300 blog posts   28612 correct pred (77% accurate)
Re# 1948776-2            Tags   Past Edits
@130 14 hours and @150 12 hours

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Aug 27
Trains with ARP 15 Dep on: Fri Sep 1
Trains with ARP 30 Dep on: Sat Sep 16
Trains with ARP 120 Dep on: Fri Dec 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.