Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Oct 23, 2017 08:04:21 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Oct 23, 2017 08:04:21 IST

Blog Entry# 1948800
Posted: Aug 01 2016 (20:37)

8 Responses
Last Response: Aug 04 2016 (22:35)
  
Kya 12423/24 Rajdhani ka Average Speed Kam hoga ya Up Hoga Nahi after 5 Aug 2016 when it will run via diverted route PPTA-HJP-SPP-BJU instead of PNBE-MKA-BJU.
Speed will Upgrade41%7
Spees will Degrade53%9
Don't Know6%1

3 posts - Mon Aug 01, 2016

  
2194 views
Aug 04 2016 (00:48)
Baaz SGUJ WDP4~   1288 blog posts   45 correct pred (63% accurate)
Re# 1948800-4            Tags   Past Edits
It will either remain unaffected because of 'Rajdhani priority' or will go down. Degrade because I have feeling that SEE & HJP wont allow a "Rajdhani" to cross through their station without stopping it. Loop line merging to main line after SEE & lack of Platform at HJP (read in some IRI blog some days back) provide both stations excuses to detain Rajdhani.
Also merger at DNR will create problems. Time will tell what happens.

  
2164 views
Aug 04 2016 (10:41)
12085 ডিব্রুগড় গুৱাহাটী শতাব্দী এক্সপ্রেছ 12086~   4932 blog posts   1692 correct pred (73% accurate)
Re# 1948800-5            Tags   Past Edits
HJP has 2 Rajdhani (12435/36 & 12235/36) Train Stopping and SEE will alo get stop for 6 Months it can get permanent like NNA. I Think so It can Give Clearance anx rpriority and making SEE a permanent Stoopaage.

  
2156 views
Aug 04 2016 (11:36)
Madan Mohan Meena   9394 blog posts   379 correct pred (78% accurate)
Re# 1948800-6            Tags   Past Edits
I think only 1 stoppage hi milega SEE ya HJP bcz continue 3 stoppage PPTA, SEE,HJP to impossible h .
Most probably PPTA and HJP

  
2031 views
Aug 04 2016 (14:19)
Saurabh®~   3392 blog posts   46 correct pred (71% accurate)
Re# 1948800-7            Tags   Past Edits
Only PPTA neither SEE nor HJP

  
1943 views
Aug 04 2016 (22:35)
Madan Mohan Meena   9394 blog posts   379 correct pred (78% accurate)
Re# 1948800-8            Tags   Past Edits
Aisa ho tabhi achha rahega. Sur PPTA bhi only 5 min hi ho.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Nov 2
Trains with ARP 15 Dep on: Tue Nov 7
Trains with ARP 30 Dep on: Wed Nov 22
Trains with ARP 120 Dep on: Tue Feb 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.