Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Dec 16, 2017 22:33:59 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Dec 16, 2017 22:33:59 IST

Blog Entry# 1949261
Posted: Aug 02 2016 (10:45)

13 Responses
Last Response: Aug 02 2016 (12:44)
  
General Travel
0 Followers
3333 views
Aug 02 2016 (10:45)  
 

©The Dark Lord™~   8804 blog posts   2 correct pred (67% accurate)
Entry# 1949261            Tags   Past Edits
Due to track wash out b/w #Delhi 2 #Mumbai route Talgo train trial affected:Upto Ratlam Talgo was running b4 time.
**Source- Ministry of Railways

8 posts - Tue Aug 02, 2016

  
1041 views
Aug 02 2016 (11:48)
12649⭐️ KSK ⭐️12650^~   14744 blog posts   4190 correct pred (68% accurate)
Re# 1949261-9            Tags   Past Edits
Talgo reached BCT @11:15 am
Train was detained @Bhuteshwar for 34 min due to signal problems
After RTM, it was affected by heavy rains

  
966 views
Aug 02 2016 (12:15)
©The Dark Lord™~   8804 blog posts   2 correct pred (67% accurate)
Re# 1949261-10            Tags   Past Edits
It reached 50 minutes before scheduled arrival at RTM with an average speed of 113 km/hr. One can imagine what can of run it will have on 150 km/hr MPS trial.

  
1044 views
Aug 02 2016 (12:39)
DhnEcr~   6067 blog posts
Re# 1949261-11            Tags   Past Edits
Talgo reached at BCT at 11.15 am. Really ?? If it did it nailed both king and deputy of Western Railway aka 12952 and 12954

  
696 views
Aug 02 2016 (12:40)
©The Dark Lord™~   8804 blog posts   2 correct pred (67% accurate)
Re# 1949261-12            Tags   Past Edits
ya, that update is genuine, even ANI has tweeted this news.

  
704 views
Aug 02 2016 (12:44)
DhnEcr~   6067 blog posts
Re# 1949261-13            Tags   Past Edits
It was expected around 9.50 am. Covered run in 15.20 hours 90 mins delayed. Considering track washout delay the run is splendid and awesome

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 26
Trains with ARP 15 Dep on: Sun Dec 31
Trains with ARP 30 Dep on: Mon Jan 15
Trains with ARP 120 Dep on: Sun Apr 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.