Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Nov 21, 2017 09:53:53 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Nov 21, 2017 09:53:53 IST

Blog Entry# 1950257
Posted: Aug 03 2016 (09:01)

1 Responses
Last Response: Aug 03 2016 (09:01)
  
Rail News
0 Followers
535 views
Commentary/Human Interest
Aug 03 2016 (07:11)   'Railways’ contract system needs overhaul'
 

rdb*^   132872 news posts
Entry# 1950257   News Entry# 275763         Tags   Past Edits
The contract system of the Indian Railways needs an overhaul coupled with the need for greater transparency from the industry, top Railway Board officials said on Tuesday.
“The present contract system of IR functioning need to be reviewed to see whether they can still serve the purpose and deliver. But what is also required is full transparency from the industry,” said S. Mookerjee, Financial Commisioner, Railway Board at an event organised by Confederation of Indian Industry (CII) here.
He said the Indian Railways spends about Rs 1 lakh crore annually towards contractual payments
...
more...
related to work and supply contracts covering both revenue maintenance and construction projects. Mr. Mookerjee suggested that the onus of quality control could be with the contractor with “deterrent” penalty provision for “substandard work.”
In its report, the CII said vendors face challenge in dealing with the Indian Railways as the “adoption of contractual conditions has not kept pace with the changes taking place in large contracts.”

  
1431 views
Aug 03 2016 (09:01)
For Better Managed Indian Railways~   1933 blog posts
Re# 1950257-1            Tags   Past Edits
Today cost per km of new line is estimated at Rs 10 crores/annum where as about 10 years back it used to be in the range of 1-1.5 Crore Rs/KM. The cost of steel & cement has increased at much slower rates.
Design speed of BG track is usually 160 kmph and new track is seldom found fit above 110 kmph.
Almost all (barring a few) projects are completed with much delay and cost overrun.
...
more...
The efficacy of the contract system as well as the whole project management system including the approval, allocation of funds & implementation need a total overhaul with a holistic view, so that the quality of construction, timely commissioning & financial performance thereafter is ensured, much to the benefit of IRlys/ people/ national economy.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 1
Trains with ARP 15 Dep on: Wed Dec 6
Trains with ARP 30 Dep on: Thu Dec 21
Trains with ARP 120 Dep on: Wed Mar 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.