Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 17, 2017 23:18:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 17, 2017 23:18:33 IST

Blog Entry# 1950594  
Posted: Aug 03 2016 (12:44)

2 Responses
Last Response: Aug 03 2016 (13:06)
  
Rail News
0 Followers
952 views
Other News
Aug 03 2016 (12:36)   Ministry of Railways explains why high-speed Talgo reached Mumbai three hours late
 

Jayashree ❖ Amita*^   37299 news posts
Entry# 1950594   News Entry# 275783         Tags   Past Edits
Spanish-made high-speed train Talgo completed its third and final phase of trial from New Delhi to Mumbai on Tuesday, but arrived at its destination over three hours behind schedule.
The semi-high-speed train had to cover a distance of 1,384 km from Delhi to Mumbai. A western railway official told PTI, "The train had commenced its final phase trial run from Delhi yesterday at 7:55 PM and arrived in Mumbai today at 11.40 AM, over three hours behind schedule." Heavy rains enroute the journey was cited as a reason for delay, otherwise the train would have reached the metropolis at 8.31 AM.
Talgo
...
more...
can attain a maximum speed of 130-150 km/hr, which according to the official was attained in the trial run. However, the average speed that Talgo is estimated at around 90-100 km/hr.
High-speed Talgo train reaches Mumbai three hours late Here's what Ministry of Railways has to say about the trial:
Talgo special Train departed from New Delhi at 19:55 hrs. It travelled through the same route which is followed by the New Delhi – Mumbai Rajdhani Express train No. 12952. It also observed the same permanent and temporary speed restrictions as well as the sectional speeds of Rajdhani Express Train No. 12952. The existing Rajdhani Express takes 15:50 hrs from New Delhi – Mumbai Central.​ Talgo train because of heavy rains enroute and due to point failure at Mathura Junction, reached at 11:36 AM at Mumbai Central. (15:41 hrs) There was water logging beyond Surat between Udvada – Vapi – Bhilad section, which considerably delayed the movement of trains as speed restrictions had to be imposed for safety reasons. Accordingly beyond Surat the Talgo train could not implement its trial schedule because of the reason beyond their control. In anyway from Delhi – Surat Talgo train took around 2 hours less in comparison to Rajdhani Express. The Talgo train fully succeeded in its maiden trial between New Delhi & Mumbai. But for the reasons mentioned above it would have taken approximately 3 hours less than the Rajdhani train in reaching Mumbai Central. It means that it would have reached in 12 hours 47 minutes as claimed and planned. Average Running Speed of Rajdhani Express (New Delhi-Surat) – 89.76 kmph Average Running Speed of Talgo Train (New Delhi-Surat) – 106.52 kmph
Talgo becomes India's fastest train, covering 84 km in 38 minutes! The train consists of nine coaches, two executive class, four chair cars, a cafeteria, a power car and a tail-end coach for staff and equipment.
With agency inputs

  
3461 views
Aug 03 2016 (12:44)
srinivasvasanthi~   4019 blog posts   13 correct pred (50% accurate)
Re# 1950594-1            Tags   Past Edits
Since Sweedish Talgo have no SLEEPER class coaches , Our Indian condition of very long distance operations and mostly passengers are preferred Over night trains our IR have to produce Sleeper class coaches in joint ventures under Make in India
early.

  
3390 views
Aug 03 2016 (13:06)
Biplob Kagyung~   4750 blog posts   1685 correct pred (74% accurate)
Re# 1950594-2            Tags   Past Edits
It's India thats why Every New Rake Composition whether Rajdhani or Shatabdi or Duronto Mahanama etc all get beated up now Time is for Gatimaan & Talgo to get beaten up.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Aug 27
Trains with ARP 15 Dep on: Fri Sep 1
Trains with ARP 30 Dep on: Sat Sep 16
Trains with ARP 120 Dep on: Fri Dec 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.