Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 02:58:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 02:58:26 IST

Blog Entry# 1950647  
Posted: Aug 03 2016 (13:58)

1 Responses
Last Response: Aug 03 2016 (13:58)
  
Rail News
0 Followers
385 views
IR AffairsCR/Central  -  
Aug 03 2016 (13:36)   Expanding residential footprint: Navi Mumbai - Livemint
 

For Better Managed Indian Railways~   948 news posts
Entry# 1950647   News Entry# 275791         Tags   Past Edits
Kharghar is a residential and commercial hub with an established social infrastructure while, CBD Belapur was developed as the central business district (CBD) for Navi Mumbai
The Navi Mumbai 3 micromarket comprises areas like Kharghar and CBD Belapur, which lie along the Harbour Line of the Mumbai Suburban Railway.
Kharghar is a residential and commercial hub with an established social infrastructure while, CBD Belapur was developed as the central business district (CBD) for Navi Mumbai.
The
...
more...
micromarket, which is a part of Raigad district, is well connected to Mumbai via road (Sion-Panvel Expressway) as well as rail (Harbour Line).

  
1861 views
Aug 03 2016 (13:58)
For Better Managed Indian Railways~   1933 blog posts
Re# 1950647-1            Tags   Past Edits
Mumbai harbour line CSTM-PNVL is playing the stellar role in creation and development Navi Mumbai. One after the other starting from Vashi, nodes are being developed along this railway track which connects them to island of Mumbai. 9 nodes developed and handed over to Navi Mumbai Municipal Corporation and 7 more under development under the adgeis of CIDCO.
Kharghar (node) has witnessed a quantum growth of decadal population from just 6000 in 2001 to 73000 in 2011, a jump of 1117%! and continues to grow!
The harbor line is experiencing very
...
more...
fast growth of passenger traffic, prompting the authorities to go for CSTM-Panvel elevated corridor.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.