Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Dec 14, 2017 04:13:00 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Dec 14, 2017 04:13:00 IST

Blog Entry# 1951412
Posted: Aug 04 2016 (10:10)

12 Responses
Last Response: Aug 06 2016 (08:41)
  
Rail News
0 Followers
4034 views
Commentary/Human Interest
Aug 04 2016 (10:07)   ट्रायल तो ठीक पर भारत में टैल्गो की राह आसान नहीं
 

Pp*^~   5969 news posts
Entry# 1951412   News Entry# 275908         Tags   Past Edits
जिस टैल्गो ट्रेन के ट्रायल रन को लेकर मीडिया में इतना हो-हल्ला है, असल में हाल-फिलहाल उसके चलने की संभावनाएं बेहद क्षीण हैं। यह हम नहीं, खुद रेलवे के अधिकारी कह रहे हैं। उनका कहना है कि यह ट्रेन अपने मौजूदा रूप में भारत के किसी काम की नहीं है। यहां चलाने के लिए इसमें काफी बदलाव करने पड़ेंगे।दरअसल, स्पेन की कंपनी टैल्गो अपनी जिस सेमी हाईस्पीड ट्रेन का ट्रायल भारत में कर रही है, वह भले ही सुरक्षा और गति के लिहाज से परीक्षणों में कामयाब रही हो, लेकिन इसका आकार-प्रकार भारत की जरूरतों के अनुरूप नहीं है। इसमें संशोधन की जरूरत है। खासकर इसकी बोगियों की ऊंचाई और चौड़ाई को लेकर सवाल खड़े किए जा रहे हैं, जो भारत की दूसरी प्रीमियम ट्रेनों की बोगियों से अलग है।1रेलवे बोर्ड के सदस्य यांत्रिक हेमंत कुमार के अनुसार, हमारी ट्रेनों की बोगियों की ट्रैक से ऊंचाई 850 एमएम होती है, वहीं...
more...
टैल्गो की बोगियां केवल 760 एमएम ऊंची हैं। इसलिए इनमें सुधार करना पड़ेगा। वैसे भी टैल्गो ने यह ट्रायल अपनी मर्जी और खर्च पर सिर्फ यह साबित करने के लिए किया है कि उसकी ट्रेन मौजूदा भारतीय ट्रैक पर ही बिना किसी सुधार के 180-200 किलोमीटर की रफ्तार से दौड़ सकती है। ट्रायल की कामयाबी से कंपनी का यह मकसद पूरा हो गया है। रेलवे अधिकारियों ने भी माना है कि टैल्गो टेन स्पीड के साथ-साथ सुरक्षा मानकों पर भी खरी उतरी है। दिल्ली से मुंबई पहुंचने में भले ही ट्रेन को ज्यादा समय लगा, लेकिन इसके लिए टैल्गो नहीं, रेलवे जिम्मेदार है जो ट्रैक को जलभराव से मुक्त रखने में नाकाम रहा। परिणामस्वरूप प्वाइंट फेल होने के कारण टेन को पहले कुछ समय के लिए मथुरा में इंतजार करना पड़ा। उसके बाद उडवाडा-वापी-भिलाड सेक्शन पर रफ्तार घटानी पड़ी। इसके बावजूद सूरत तक ट्रेन अपनी निर्धारित गति को कायम रखने में कामयाब रही। यह ट्रेन नई दिल्ली स्टेशन से शाम 7:55 पर रवाना हुई थी और अगले दिन सवेरे 11:36 पर मुंबई सेंट्रल पहुंची। इस तरह कुल मिलाकर इसने 15 घंटे और 44 मिनट का समय लिया। यदि हालात सामान्य होते तो इसे मात्र 12 घंटे, 47 मिनट का समय लगता। मुंबई राजधानी ट्रेन की औसत स्पीड 89.76 किलोमीटर प्रति घंटा है। जबकि, टैल्गो ने दिल्ली से सूरत के बीच 106.52 किलोमीटर की औसत स्पीड निकाली। 1अभी तक टैल्गो ने न तो किसी टेंडर प्रक्रिया में भाग लिया है और न ही कोई कांट्रैक्ट हासिल किया है। इसने हाईस्पीड ट्रेन सेट्स की विफल हो चुकी निविदा प्रक्रिया से भी खुद को दूर रखा था। ऐसे में टैल्गो को मौका देने के लिए रेलवे को नए सिरे से निविदाएं आमंत्रित करनी पड़ेंगी तथा इस जैसी तकनीक वाली अन्य कंपनियों को भी आमंत्रित करना पड़ेगा। इसमें लंबा समय लग सकता है।नई दिल्ली रेलवे स्टेशन पर दिल्ली से मुंबई के ट्रायल रन पर जाती टैल्गो ट्रेन।हरीश कुमार

7 posts - Thu Aug 04, 2016

  
3049 views
Aug 04 2016 (11:30)
spthakurfamily   467 blog posts
Re# 1951412-8            Tags   Past Edits
Talgo train means IR's MG train coaches (Size), which is outdated. IR need maximum passengers at a time with speed. Trail with 9 coaches only. If our rajdhani will run with 9 coach they will also get this speed. Better to take technology from telgo & not train.

  
2150 views
Aug 04 2016 (12:48)
Kuchh to log kahenge   228 blog posts   14 correct pred (78% accurate)
Re# 1951412-9            Tags   Past Edits
If this train has low floor than IR Trains then it is well and good as it will come at par with the platform height and easy to board and de-board the train specially for old age and children.

  
2810 views
Aug 04 2016 (12:49)
Realrider   667 blog posts
Re# 1951412-10            Tags   Past Edits
9 coaches is not matters. Its design.
Even with 4 coaches LHB cannot run at 150 kmph at curves.

  
1496 views
Aug 04 2016 (14:17)
Pained to know Boeing 777 landcrashed~   23281 blog posts   21101 correct pred (68% accurate)
Re# 1951412-11            Tags   Past Edits
Talgo ka trial Sitapur curve mein karana chahiye tha,waise v train kuchh dino tak Bareilly mein thi hi..yesterday followed a few trains including LHB 15656 whixh takea almost 1.5 hr from Sitapur city to Maikalganj 14 km,agar iss curve m talgo khara utarta then we can say it would br successful in future... DEL BOM route p aisa koi curve h hi nahi

  
1370 views
Aug 06 2016 (08:41)
For Better Managed Indian Railways~   1933 blog posts
Re# 1951412-12            Tags   Past Edits
Even if the TalgoBCT-NDLS run is successful, and India decides to go for commercial introduction of SHS train sets, it is unlikely that order shall be given to Talgo. Most probably there will be an open tender which will be participated by more reputed international players like Alstom, Bombardier, Siemens etc. also, and they are already having manufacturing facility in India much to the advantage of I Rlys.
Talgo trains have been tested, but actually it was a better test of IRly tracks for fitness for higher speeds. It is believed that conventional Indian tracks can take on speeds up to 200 kmph, beyond which dedicated tracks are necessary.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Dec 24
Trains with ARP 15 Dep on: Fri Dec 29
Trains with ARP 30 Dep on: Sat Jan 13
Trains with ARP 120 Dep on: Fri Apr 13

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.