Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Nov 22, 2017 22:27:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Nov 22, 2017 22:27:36 IST

Blog Entry# 1952315
Posted: Aug 05 2016 (10:24)

3 Responses
Last Response: Aug 05 2016 (10:52)
  
General Travel
0 Followers
1013 views
Aug 05 2016 (10:24)  
 

shiv2350   381 blog posts
Entry# 1952315            Tags   Past Edits
Already one Post i have written that there should be a new double electrified railway line between Mughalsarai - Bikramganj - Arwal - Jahanabad - Bihar sharif - Sheikhpura - Lakhisarai. It will speed up the train originating from Northeast States and also from Bhagalpur, malda & Farakka. It will cut short the time of Long distance trains. Bikramganj, Jahanabad & Bihar sharif should have Elevated Railway tracks then only it can speed up trains without any late. They can have elevated stations if in need.

  
936 views
Aug 05 2016 (10:26)
JBP ET OHE OMG 😲~   15072 blog posts   22 correct pred (43% accurate)
Re# 1952315-1            Tags   Past Edits
Mazak kr rhe kya saalo lgnge esa krne m
Abi puri lines electrified nhi ha aur ap kh rhe k ek aur double bg electrified line dali jae

  
934 views
Aug 05 2016 (10:43)
shiv2350   381 blog posts
Re# 1952315-2            Tags   Past Edits
Ye koi mazak nahi hai. Yadi kam time mein Extreme east se west jana hai to High Speed Corridor bana na hoga wo bhi Kam duri wala. Aur Ane wale samay mein Sare northeast states se Rajdhani chalegi tab trains aur zayada honge. So pehle se nahi sochenge to kuch nahi hoga. Wahi slow speed aur long time lagega.

  
911 views
Aug 05 2016 (10:52)
JBP ET OHE OMG 😲~   15072 blog posts   22 correct pred (43% accurate)
Re# 1952315-3            Tags   Past Edits
Bhai but ye India ha us ya China nhi jo apn n socha ir ko btsya aur ir n us pr kam krna chlu kr dya
Me ye nhi lh rha k apna proposal galat ha pr bhut zyada nearly 8-10 saal bad ir is pr sochega

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Dec 2
Trains with ARP 15 Dep on: Thu Dec 7
Trains with ARP 30 Dep on: Fri Dec 22
Trains with ARP 120 Dep on: Thu Mar 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.