Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 18:06:11 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 18:06:11 IST

Blog Entry# 1952899  
Posted: Aug 05 2016 (20:02)

5 Responses
Last Response: Aug 06 2016 (01:17)
  
Rail News
0 Followers
1095 views
Other NewsIR Press Release 
Aug 05 2016 (19:50)   Tender for Godhra Nagda section
 

Rajasthan must gt 15000 crore for Railwy developmn^~   977 news posts
Entry# 1952899   News Entry# 276095         Tags   Past Edits
Supply, installation, testing and commissioning of Signaling material in connection with following engineering works on Ratlam division:- 1)- Godhra- Nagda section: Casual renewal of switches (1:12 and 1:8.5). 2)-Godhra- Nagda section: TRR(P)=45.181 KM with 60 kg-90UTS rails UP/DN. 3)-Godhra- Nagda section: Through ballast recoupment of existing ballast laid under 60 kg rails and PRC sleeper by deep screening and recoupment of ballast to the existing standard of 30 cm TBR=29.5 KM.

  
1002 views
Aug 05 2016 (20:02)
Rajasthan must gt 15000 crore for Railwy developmn^~   84508 blog posts   5303 correct pred (78% accurate)
Re# 1952899-1            Tags   Past Edits
Seems like WR has started upgrading this section from 110kmph to 130kmph for high speed runs of Talgo (and Rajdhani)

  
932 views
Aug 05 2016 (20:55)
For Better Managed Indian Railways~   1933 blog posts
Re# 1952899-2            Tags   Past Edits
Good news. It looks like IRlys is determined for BCT-NDLS Raj in 12 hrs.

  
862 views
Aug 05 2016 (21:39)
Rajasthan must gt 15000 crore for Railwy developmn^~   84508 blog posts   5303 correct pred (78% accurate)
Re# 1952899-3            Tags   Past Edits
It seems like railway has realised the potential benefits of Mumbai Delhi sector
I think this sector alone can give railway huge profit if IR can give 12 hour run time. Basically railway can finish airline business of this sector.

  
1683 views
Aug 06 2016 (00:00)
For Better Managed Indian Railways~   1933 blog posts
Re# 1952899-4            Tags   Past Edits
Delhi- Mumbai is very very distinctly the busiest air traffic route of India. with 5.3 lac passengers/month or 18000 passengers per day. This sector can give a large number of premium passengers to High speed trains. If a 200 kmph Semi high speed train can do a real overnight 9-10 hr journey, pessimistically assuming even if one third of passengers switch over to train, it mean 6000 passengers/day i.e. about 6 Full length Rajdhani type trains. (TGV routes on France, the air traffic has fallen to much less than half after their introduction)
Convenience & time saving shall generate additional (new) traffic, also many a.c. class passengers shall be enticed to switch from S/F Express trains to the SHS Train. About
...
more...
7-10 SH Trains could be operated on the route even with pessimistic assumptions.
Airline business in this sector can never be finished because, company officials in large number go for their official meetings/presentations and return by the same day.The facility which even HS trains can not give.
Next best opportunities in this regard is Mumbai-Ahmedabad, Mumbai-Bangaluru, Mumbai-Goa SHS train.

  
1635 views
Aug 06 2016 (01:17)
Pained to know Boeing 777 landcrashed~   23275 blog posts   21101 correct pred (68% accurate)
Re# 1952899-5            Tags   Past Edits
For 1000+ km long journey trains can't be economical & cheaper at the same time than flights...already all the long distant SL class fares are heavily subsidized &_3A fare just manages to attract profit that too not by any huge margin..plus one high speed train means life risk for so many road users which is totally eliminated in case of flights

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.