Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Dec 16, 2017 14:50:57 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Dec 16, 2017 14:50:57 IST

Blog Entry# 1953908
Posted: Aug 06 2016 (20:10)

4 Responses
Last Response: Aug 11 2016 (08:12)
  
General Travel
0 Followers
1962 views
Aug 06 2016 (20:10)   GTL/Guntakal Junction (6 PFs)
 

✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~   4073 blog posts   154 correct pred (72% accurate)
Entry# 1953908            Tags   Past Edits
SCR GM visited Guntakal rly stn....said that the Central Govt is concentrated to complete the projects ASAP(before it took many years)....soon general bogies will be attached to 17215/16....also said that 17215/16 is not feasible to divert via GTL once route is decided

  
1079 views
Aug 07 2016 (21:11)
pslkumar   338 blog posts
Re# 1953908-1            Tags   Past Edits
start ice trains from gtl to all directions gnt,cto,sbc,ubl,sc and wadi.

  
1044 views
Aug 07 2016 (21:17)
CIRCAR 1965~   2490 blog posts   48 correct pred (69% accurate)
Re# 1953908-2            Tags   Past Edits
Comedy ante ide mari. okksaari vesina train ki stops penchadam and route marchadam possible kaadu anta :D

  
1025 views
Aug 11 2016 (08:00)
karim1237890   81 blog posts
Re# 1953908-3            Tags   Past Edits
After gooty bypass construction many express trains like waiganga,korba,kongu,rameswaram exp,kcg sf,venkatadri exp etc running via gooty-pendekallu route before gooty bypass construction all the trains run via guntakal so if the railways want to change they can change.needs some pressure from people and politician they will change their opinion.one more thing since last 5 years they are not concentrated guntakal bypass simply funds are allocated for bypass 21 crores where they had gone where they are diverted funds.pressure from mp to construct guntakal bypass

  
870 views
Aug 11 2016 (08:12)
Bangalore to Kacheguda via kurnool Doubling~   2566 blog posts   2634 correct pred (77% accurate)
Re# 1953908-4            Tags   Past Edits
This train has so much slack, can easily be diverted via gtl

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 26
Trains with ARP 15 Dep on: Sun Dec 31
Trains with ARP 30 Dep on: Mon Jan 15
Trains with ARP 120 Dep on: Sun Apr 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.