Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Nov 23, 2017 09:24:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Nov 23, 2017 09:24:36 IST

Blog Entry# 1954041
Posted: Aug 06 2016 (23:29)

9 Responses
Last Response: Aug 08 2016 (01:04)
  
Rail News
0 Followers
4003 views
Other NewsNER/North Eastern  -  
Aug 06 2016 (19:18)   माधोसिंह स्टेशन तक दौड़ेगी इलेक्ट्रिक ट्रेन
 

Saurabh*^~   3224 news posts
Entry# 1954041   News Entry# 276207         Tags   Past Edits
-मार्च तक पूरा हो जायेगा 120 किलोमीटर रूट का विद्युतीकरण, अप्रैल में होगा ट्रायल
-अप्रैल में होगा ट्रायल
वाराणसी कार्यालय संवाददाता
रेल विकास निगम के अधिकारी की मानें तो यह कार्य मार्च तक पूरा हो जायेगा। आधे से अधिक काम पूरा हो गया है। इसके बाद अप्रैल के पहले या दूसरे सप्ताह में बिजली के ट्रेन को दौड़ाकर परीक्षण भी कर लिया जायेगा।
अप्रैल
...
more...
2017 से गाजीपुर-वाराणसी-माधोसिंह के बीच बिजली की ट्रेन दौड़ने लगेगी। पूर्वोत्तर रेलवे 120 किलोमीटर लंबे इस ट्रैक पर विद्युतीकरण का कार्य तेजी से कर रहा है। पिछले सप्ताह वायरिंग का काम भी शुरू कर दिया गया है। अधिकारियों का दावा है कि यह काम मार्च में पूरा हो जायेगा। इस काम पर 170 करोड़ रुपये खर्च हो रहे हैं।
330 किलोमीटर का होगा विद्युतीकरण:
पूर्वोत्तर रेलवे वाराणसी मंडल में इलाहाबाद सिटी से छपरा के बीच विद्युतीकरण का काम रेल मंत्रलय ने पिछले बजट में पास किया था। दोनों स्टेशनों के बीच की दूरी 330 किलोमीटर है। इसका टेंडर जून 2015 में कराया गया और काम अक्तूबर से शुरू हो गया। पहले चरण में गाजीपुर-वाराणसी-माधोसिंह ट्रैक पर काम चल रहा है।
औड़िहार के सब स्टेशन का कनेक्शन बचा:
इस रूट के सभी महत्वपूर्ण स्टेशनों पर बिजली सब स्टेशन बन चुका है। सिर्फ औड़िहार पर सब स्टेशन का कनेक्शन मिलना शेष है। हालांकि इसके लिए 22 करोड़ रुपये भी जमा कर दिये गये हैं। कनेक्शन में देरी पर बिजली अफसरों के साथ बैठक की गई। अधिकारियों ने जल्द कनेक्शन देने का आश्वासन दिया है।
इलाहाबाद से छपरा तक विद्युतीकरण के पहले चरण में गाजीपुर-वाराणसी-माधोसिंह तक का काम किया जा रहा है। पूरी उम्मीद है कि मार्च तक विद्युतीकरण पूरा हो जायेगा। -एसके श्रीवास्तव, चीफ प्रोजेक्ट मैनेजर, रेल विकास निगम

1 posts - Sat Aug 06, 2016

3 posts - Sun Aug 07, 2016

  
4936 views
Aug 08 2016 (00:19)
kshitij~   4041 blog posts   3035 correct pred (76% accurate)
Re# 1954041-5            Tags   Past Edits
Can only be used for good trains upto container depot at madhosingh.
But i still doubt ki news walo ne sahi likha hai

  
4925 views
Aug 08 2016 (00:24)
Saurabh*^~   9223 blog posts   3427 correct pred (73% accurate)
Re# 1954041-6            Tags   Past Edits
Is container depot @madhosingh operational i heard that it was closed..?
Waise Sinha ji k project h..Lekin mujhe 2017 year end tak hi operational hone k chances lag rahe h.

  
4952 views
Aug 08 2016 (00:31)
kshitij~   4041 blog posts   3035 correct pred (76% accurate)
Re# 1954041-7            Tags   Past Edits
M not sure whether it is operational or not but had spotted goods train sometime.
As per my discussion with one of the official of NER BSB, he said currently focus is on doubling b/w Aurihar and BSB; electrification b/w BSB and ALY. Also 4th washing line is under construction at MUV and as well there is construction of washing line at MAU which might get operational by DEC

  
4912 views
Aug 08 2016 (00:42)
Saurabh*^~   9223 blog posts   3427 correct pred (73% accurate)
Re# 1954041-8            Tags   Past Edits
4th washing line @muv..Good to know that.
So there are the chances of few trains terminating or New trains from MUV.

  
4886 views
Aug 08 2016 (01:04)
kshitij~   4041 blog posts   3035 correct pred (76% accurate)
Re# 1954041-9            Tags   Past Edits
Yes..trains from BSB will be shifted to MUV and BCY because of remodeling at BSB

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Dec 3
Trains with ARP 15 Dep on: Fri Dec 8
Trains with ARP 30 Dep on: Sat Dec 23
Trains with ARP 120 Dep on: Fri Mar 23

  
  

Rail News

New Trains

Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.