Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Sep 20, 2017 04:11:34 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Sep 20, 2017 04:11:34 IST

Blog Entry# 1954041  
Posted: Aug 06 2016 (23:29)

9 Responses
Last Response: Aug 08 2016 (01:04)
  
Rail News
0 Followers
3740 views
Other NewsNER/North Eastern  -  
Aug 06 2016 (19:18)   माधोसिंह स्टेशन तक दौड़ेगी इलेक्ट्रिक ट्रेन
 

Saurabh*^~   3145 news posts
Entry# 1954041   News Entry# 276207         Tags   Past Edits
-मार्च तक पूरा हो जायेगा 120 किलोमीटर रूट का विद्युतीकरण, अप्रैल में होगा ट्रायल
-अप्रैल में होगा ट्रायल
वाराणसी कार्यालय संवाददाता
रेल विकास निगम के अधिकारी की मानें तो यह कार्य मार्च तक पूरा हो जायेगा। आधे से अधिक काम पूरा हो गया है। इसके बाद अप्रैल के पहले या दूसरे सप्ताह में बिजली के ट्रेन को दौड़ाकर परीक्षण भी कर लिया जायेगा।
अप्रैल
...
more...
2017 से गाजीपुर-वाराणसी-माधोसिंह के बीच बिजली की ट्रेन दौड़ने लगेगी। पूर्वोत्तर रेलवे 120 किलोमीटर लंबे इस ट्रैक पर विद्युतीकरण का कार्य तेजी से कर रहा है। पिछले सप्ताह वायरिंग का काम भी शुरू कर दिया गया है। अधिकारियों का दावा है कि यह काम मार्च में पूरा हो जायेगा। इस काम पर 170 करोड़ रुपये खर्च हो रहे हैं।
330 किलोमीटर का होगा विद्युतीकरण:
पूर्वोत्तर रेलवे वाराणसी मंडल में इलाहाबाद सिटी से छपरा के बीच विद्युतीकरण का काम रेल मंत्रलय ने पिछले बजट में पास किया था। दोनों स्टेशनों के बीच की दूरी 330 किलोमीटर है। इसका टेंडर जून 2015 में कराया गया और काम अक्तूबर से शुरू हो गया। पहले चरण में गाजीपुर-वाराणसी-माधोसिंह ट्रैक पर काम चल रहा है।
औड़िहार के सब स्टेशन का कनेक्शन बचा:
इस रूट के सभी महत्वपूर्ण स्टेशनों पर बिजली सब स्टेशन बन चुका है। सिर्फ औड़िहार पर सब स्टेशन का कनेक्शन मिलना शेष है। हालांकि इसके लिए 22 करोड़ रुपये भी जमा कर दिये गये हैं। कनेक्शन में देरी पर बिजली अफसरों के साथ बैठक की गई। अधिकारियों ने जल्द कनेक्शन देने का आश्वासन दिया है।
इलाहाबाद से छपरा तक विद्युतीकरण के पहले चरण में गाजीपुर-वाराणसी-माधोसिंह तक का काम किया जा रहा है। पूरी उम्मीद है कि मार्च तक विद्युतीकरण पूरा हो जायेगा। -एसके श्रीवास्तव, चीफ प्रोजेक्ट मैनेजर, रेल विकास निगम

1 posts - Sat Aug 06, 2016

3 posts - Sun Aug 07, 2016

  
4476 views
Aug 08 2016 (00:19)
kshitij~   2912 blog posts   3019 correct pred (76% accurate)
Re# 1954041-5            Tags   Past Edits
Can only be used for good trains upto container depot at madhosingh.
But i still doubt ki news walo ne sahi likha hai

  
4465 views
Aug 08 2016 (00:24)
Saurabh*^~   8897 blog posts   3351 correct pred (73% accurate)
Re# 1954041-6            Tags   Past Edits
Is container depot @madhosingh operational i heard that it was closed..?
Waise Sinha ji k project h..Lekin mujhe 2017 year end tak hi operational hone k chances lag rahe h.

  
4494 views
Aug 08 2016 (00:31)
kshitij~   2912 blog posts   3019 correct pred (76% accurate)
Re# 1954041-7            Tags   Past Edits
M not sure whether it is operational or not but had spotted goods train sometime.
As per my discussion with one of the official of NER BSB, he said currently focus is on doubling b/w Aurihar and BSB; electrification b/w BSB and ALY. Also 4th washing line is under construction at MUV and as well there is construction of washing line at MAU which might get operational by DEC

  
4453 views
Aug 08 2016 (00:42)
Saurabh*^~   8897 blog posts   3351 correct pred (73% accurate)
Re# 1954041-8            Tags   Past Edits
4th washing line @muv..Good to know that.
So there are the chances of few trains terminating or New trains from MUV.

  
4431 views
Aug 08 2016 (01:04)
kshitij~   2912 blog posts   3019 correct pred (76% accurate)
Re# 1954041-9            Tags   Past Edits
Yes..trains from BSB will be shifted to MUV and BCY because of remodeling at BSB

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 30
Trains with ARP 15 Dep on: Thu Oct 5
Trains with ARP 30 Dep on: Fri Oct 20
Trains with ARP 120 Dep on: Thu Jan 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.