Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 24, 2017 12:58:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 24, 2017 12:58:29 IST

Blog Entry# 1956131  
Posted: Aug 09 2016 (10:19)

No Responses Yet
  
★  General Travel
1 Followers
1446 views
Aug 09 2016 (10:19)   GR/Gulbarga (4 PFs)
 

skumarvkulkarni~   1704 blog posts
Entry# 1956131            Tags   Past Edits
Kalaburagi-Bidar line to be commissioned in February 2017
Other important projects:
- Fourth Platform already done(will be commissioned in Sept 2016)
- Second foot over bridge with Lift will be done by March 2017
-
...
more...
Mother Theresa Over bridge 20 crores Rs will be done by June 2017
- Afzalpur road Over Bridge will be completed by December 2016( already 60% work done)
- Instllation of closed-circuit television cameras will be done by December 2016
- Railway Under Bridge near Tarfile will be done by September 2016
- Second Entry for Gulbarga station by August 31st( this is already in place)
- Level crossing at chittapur worth 56 crores.
The long-pending Kalaburagi-Bidar new rail line will be commissioned in February 2017 after the completion of the ongoing works on laying rail lines and construction of railway stations between Kalaburagi and Humnabad, Ajai Kumar Dubey, Divisional Railway Manager, Central Railway, has said.
Speaking at the flagging of ceremony of the Gulbarga-Hyderabad Inter-city Express on Monday, he outlined the works taken up by the Railways in the Kalaburagi region.
He said that the fourth platform at the Gulbarga Railway Station, constructed at a cost of Rs. 4.5 crore, would be commissioned in September and the second foot overbridge along with a lift in the fourth platform, set up at a cost of Rs. 2.6 crore, would be commissioned by March 2017.
The road overbridge at Mother Teresa School on the New Jewargi Road, taken up at a cost of Rs. 20 crore, was expected to be completed by June 2017.
The road overbridge on Kalaburagi-Afzalpur Road, taken up at a cost of Rs. 5.5 crore, would be completed by December. The installation of closed-circuit television cameras at the Gulbarga Railway Station under the Nirbhaya fund would also be completed in the same month. Mr. Dubey said that the rail underbridge at Tarfile near the Gulbarga Railway Station, taken up at a cost of Rs. 3.9 crore, would be completed by September and the second entry to the Gulbarga Railway Station would be completed on August 31.
The Railways also proposes to take up the work on a road overbridge to replace the level crossing at Hirapur and Balram Chowk in Chittapur at an estimated cost of Rs. 56 crore. The Gangapur Road Railway Station would be developed and a foot overbridge would be constructed at an estimated cost of Rs. 5.5 crore.
Pit-line
Mr. Dubey said that the Railways had completed the work on constructing a pit-line for carriage maintenance of 26 coaches in Gulbarga Railway Station at a cost of Rs. 6.21 crore and provided cover over platform in the first platform at the Gulbaga Railway Station at a cost of Rs. 54.64 lakh. The Railways had started using bio-diesel at Wadi Railway Consumer Depots.
Fourth platform at Gulbarga Railway Station will be commissioned in September: official
click here

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Sep 3
Trains with ARP 15 Dep on: Fri Sep 8
Trains with ARP 30 Dep on: Sat Sep 23
Trains with ARP 120 Dep on: Fri Dec 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.