Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Sep 25, 2017 15:30:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Sep 25, 2017 15:30:43 IST

Blog Entry# 1957123  
Posted: Aug 10 2016 (08:10)

54 Responses
Last Response: Aug 13 2016 (15:32)
  
General Travel
0 Followers
5253 views
Aug 10 2016 (08:10)   07762/Tirupati - Vishakapatnam Double Decker Special
 

®a¿€sh~   203 blog posts   333 correct pred (80% accurate)
Entry# 1957123            Tags   Past Edits
SCR is giving very odd timings for DD and later saying very poor response. This can start TPTY after 6am

23 posts - Wed Aug 10, 2016

26 posts - Thu Aug 11, 2016

  
1989 views
Aug 11 2016 (14:38)
Guest: 3e3a0aec   show all posts
Re# 1957123-61            Tags   Past Edits
well why dont you look at the way GDR handles the trains then buddy...then you will have a clear idea ....the trains which is coming towards GDR will always gets late even thought they start/reach destinations on time....and to cover that delay...they give slack between NLR-GDR both directions...and there is no such route constraints or speed restrictions in GDR sections as much as in the BZA-DVD which is the reason why trains will ply with significantly low Speed then that of GDR section...
.
and more over its not just passenger traffic but
...
more...
also the goods traffic has to be maintained without delay as it may hit IR revenues ...so most of the times if you see, main lines are blocked in SCR and SCR is also famous for giving Trains to skips through PF/Loop side rather than through main line which always requires additional time as it has to slow down before switching and continue like that till the entire rake crosses the switch and joins the main line.....one thing i would like to say here..no matter what...you cant compare the BZA station with RJY because a junction handling the trains is altogether a new ball game compared to the way intermediate statoins managing the traffic and giving priorities no matter form where they are getting instructoins...

  
1963 views
Aug 11 2016 (14:39)
Guest: 3e3a0aec   show all posts
Re# 1957123-62            Tags   Past Edits
did i said DVD is in SCR ? i said BZA-DVD section ...not DVD station

  
1970 views
Aug 11 2016 (15:00)
Srikanth~   1620 blog posts   590 correct pred (73% accurate)
Re# 1957123-63            Tags   Past Edits
RJY is built in such a way that no body can do anything. From KVR - Kadiyam speed restriction is there. If Freight is ahead of the train, then its always a problem, train will stop at KYM. Also, BZA - VSKP is busy with freights. I guess, Auto Signalling will clear this problem, then trains/freights might go back to back, not sure though whether its possible or not.

  
2314 views
Aug 11 2016 (18:17)
LHB rake coromandel exp   30 blog posts
Re# 1957123-64            Tags   Past Edits
The train should start at 6.00 pm at TIRUPATY and reach at 6.00 am at VSKP. In the reverse direction also the same timings. SUPER HIT ...SUPER HIT.

  
1968 views
Aug 13 2016 (15:32)
yansrikanth   5 blog posts
Re# 1957123-65            Tags   Past Edits
Krishna Pushkaralu Details here
click here

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Oct 5
Trains with ARP 15 Dep on: Tue Oct 10
Trains with ARP 30 Dep on: Wed Oct 25
Trains with ARP 120 Dep on: Tue Jan 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2418661
    Today (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.